Search NASA⌕ Search

Engineering topics

Sandberg, J

Publications and source records attributed to Sandberg, J.

Research and development of RHIC injection kicker upgrade with nano second FID pulse generator

Our recent effort to test a 50 kV, 1 kA, 50 ns pulse width, 10 ns pulse rise time FID pulse generator with a 250 ft transmission cable, resistive load, and existing RHIC injection kicker magnet has produced unparalleled results. This is the very first attempt to drive a high strength fast kicker magnet with a nano second high pulsed power (50 MVA) generator for large accelerator and colliders. The technology is impressive. We report here the result and future plan of RHIC Injection kicker upgrade.

43 PARTICLE ACCELERATORS↗

Analysis of beam loss induced abort kicker instability

Through more than a decade of operation, we have noticed the phenomena of beam loss induced kicker instability in the RHIC beam abort systems. In this study, we analyze the short term beam loss before abort kicker pre-fire events and operation conditions before capacitor failures. Beam loss has caused capacitor failures and elevated radiation level concentrated at failed end of capacitor has been observed. We are interested in beam loss induced radiation and heat dissipation in large oil filled capacitors and beam triggered thyratron conduction. We hope the analysis result would lead to better protection of the abort systems and improved stability of the RHIC operation.

43 PARTICLE ACCELERATORS↗

Analysis of kicker noise induced beam emittance growth

Over the last few years, physicists have occasionally observed the presence of noise acting on the RHIC beams leading to emittance growth at high beam energies. While the noise was sporadic in the past, it became persistent during the Run-11 setup period. An investigation diagnosed the source as originating from the RHIC dump kicker system. Once identified the issue was quickly resolved. We report in this paper the investigation result, circuit analysis, measured and simulated waveforms, solutions, and future plans.

43 PARTICLE ACCELERATORS↗

RHIC performance for FY2011 Au+Au heavy ion run

Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run, RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of 'common' RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals. At the conclusion of the FY 2011 polarized proton run, preparations for heavy ion run proceeded on April 18, with Au+Au collisions continuing through June 28. Our standard operations at 100 GeV/nucleon beam energy was bracketed by two shorter periods of collisions at lower energies (9.8 and 13.5 GeV/nucleon), continuing a previously established program of low and medium energy runs. Table 1 summarizes our history of heavy ion operations at RHIC.

43 PARTICLE ACCELERATORS↗

Booster main magnet power supply, present operation and potential future upgrades

The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

43 PARTICLE ACCELERATORS↗

Overview of recent studies and modifications being made to RHIC to mitigate the effects of a potential failure to the helium distribution system

In order to cool the superconducting magnets in RHIC, its helium refrigerator distributes 4.5 K helium throughout the tunnel along with helium distribution for the magnet line recoolers, the heat shield, and the associated return lines. The worse case for failure would be a release from the magnet distribution line which operates at 3.5 to 4.5 atmospheres and contains the energized magnet but with a potential energy of 70 MJoules should the insulation system fail or an electrical connection opens. Studies were done to determine release rate of the helium and the resultant reduction in O{sub 2} concentration in the RHIC tunnel and service buildings. Equipment and components were also reviewed for design and reliability and modifications were made to reduce the likelihood of failure and to reduce the volume of helium that could be released.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RHIC 12x150A current lead temperature controller: design and implementation

There are 60 12 x 150A current leads distributed in six RHIC service buildings; each lead delivers power supply current from room temperature to cryogenic temperature in RHIC. Due to the humid environment, condensation occurs frequently and ice forms quickly during operation, especially during an extensive storage period. These conditions generate warnings and alarms to which personnel must respond and establish temporary solutions to keep the machine operating. In here, we designed a temperature control system to avoid such situations. This paper discusses its design, implementation, and some results. There are six service buildings in the RHIC complex; each building has two valve boxes that transfer room-temperature current cables from the power supplies into superconducting leads, and then transport them into the RHIC tunnel. In there, the transition between the room-temperature lead into superconducting lead is critical and essential; smooth running during the physics store is crucial for the machine's continuing operation. One of the problems that often occurred previously was the icing of these current leads that could result in a potential leakage current onto ground, thereby preventing a continuous supply of physics store. Fig. 1 illustrates a typical example on a power lead. Among the modifications of the design of the valve box, we list below the new requirements for designing the temperature controller to prevent icing occurring: (1) Remotely control, monitor, and record each current lead's temperature in real time. Prevent icing or overheating of a power lead. (2) Include a temperature alarm for the high/low level threshold. In this paper we discuss the design, implementation, upgrades to, and operation of this new system.

43 PARTICLE ACCELERATORS↗

AGS tune jump power supply design and test

A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

43 PARTICLE ACCELERATORS↗

Analysis of RHIC beam dump pre-fires

It has been speculated that the beam may cause instability of the RHIC Beam Abort Kickers. In this study, we explore the available data of past beam operations, the device history of key modulator components, and the radiation patterns to examine the correlations. The RHIC beam abort kicker system was designed and built in the 90's. Over last decade, we have made many improvements to bring the RHIC beam abort kicker system to a stable operational state. However, the challenge continues. We present the analysis of the pre-fire, an unrequested discharge of kicker, issues which relates to the RHIC machine safety and operational stability.

43 PARTICLE ACCELERATORS↗