Search NASA⌕ Search

Engineering topics

Sanderson, A. C.

Publications and source records attributed to Sanderson, A. C..

A performance analysis method for distributed real-time robotic systems: A case study of remote teleoperation

Robot coordination and control systems for remote teleoperation applications are by necessity implemented on distributed computers. Modeling and performance analysis of these distributed robotic systems is difficult, but important for economic system design. Performance analysis methods originally developed for conventional distributed computer systems are often unsatisfactory for evaluating real-time systems. The paper introduces a formal model of distributed robotic control systems; and a performance analysis method, based on scheduling theory, which can handle concurrent hard-real-time response specifications. Use of the method is illustrated by a case of remote teleoperation which assesses the effect of communication delays and the allocation of robot control functions on control system hardware requirements.

Lefebvre, D. R.↗

Model based matching using simulated annealing and a minimum representation size criterion

We define the model based matching problem in terms of the correspondence and transformation that relate the model and scene, and the search and evaluation measures needed to find the best correspondence and transformation. Simulated annealing is proposed as a method for search and optimization, and the minimum representation size criterion is used as the evaluation measure in an algorithm that finds the best correspondence. An algorithm based on simulated annealing is presented and evaluated. This algorithm is viewed as a part of an adaptive, hierarchical approach which provides robust results for a variety of model based matching problems.

Ravichandran, B.↗

Evaluation and selection of assembly plans

Two criteria are introduced for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences encompassed by the assembly plan. The second criterion is to maximize the amount of parallelism (i.e., simultaneity) that is possible in the execution of the assembly tasks. While the metrics corresponding to the criteria used in previous work can be expressed as a sum of terms, each being a function of a task or a state, the metrics corresponding to the criteria introduced are more complex functions of the whole assembly plan. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans introduced in previous work is presented. Admissible heuristics for each of the two criteria are presented.

Homem De Mello, L. S.↗

Generation of precedence relations for mechanical assemblies

Planning of assembly sequences is essential to the manufacturing system design process. Several methodologies have been proposed to represent all the feasible assembly sequences. In this thesis, three algorithms are presented to generate three sets of precedence relations based on all the infeasible assembly tasks, all the infeasible assembly states, and all the feasible assembly sequences, respectively. The equivalence of the resulting sets of precedence relations to the AND/OR graph is established. A new property, the real time property, of a representation of assembly sequences is defined and discussed. A representation of assembly sequences is said to have the real time property, if it is possible to generate the next assembly task by testing locally in the representation, and it will guarantee that the generated assembly task will not lead the assembly sequence to a dead end situation, in which no feasible assembly task can be performed any more. It is shown that the correctness and completeness of one representation can not guarantee the real time property of the representation. It is proven that the directed graph representation and the set of precedence relations based on all the infeasible assembly states have the real time property, while the AND/OR graph representation and the set of precedence relations based on all the infeasible assembly tasks do not have the real time property. Finally in the thesis, the PLEIDEAS system, a PLanning Environment for Integrated DEsign of Assembly Systems, is described and illustrated by an example.

Zhang, Hui↗

Precedence relationship representations of mechanical assembly sequences

Two types of precedence relationship representations for mechanical assembly sequences are presented: precedence relationships between the establishment of one connection between two parts and the establishment of another connection, and precedence relationships between the establishment of one connection and states of the assembly process. Precedence relationship representations have the advantage of being very compact. The problem with these representations was how to guarantee their correctness and completeness. Two theorems are presented each of which leads to the generation of one type of precedence relationship representation guaranteeing its correctness and completeness for a class of assemblies.

Homendemello, L. S.↗

Planning repair sequences using the AND/OR graph representation of assembly plans

A simple modification is shown in the set of goal nodes of the AND/OR graph that allows its use in planning repairs such as the replacement of a part or a subassembly. An algorithm for the generation of all feasible sequences for disassembly and reassembly of parts that will achieve a repair is shown. This approach has been demonstrated for the example of the repair of space-based satellite equipment.

Homem De Mello, L. S.↗

Task planning and control synthesis for robotic manipulation in space applications

Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.

Sanderson, A. C.↗