Search NASA⌕ Search

Engineering topics

Sangrey, Robert L.

Publications and source records attributed to Sangrey, Robert L..

Second Target Station Project: LANSCE WNR Target 2 (Blue Room) Experiment 2022

The Second Target Station (STS) at SNS will address emerging scientific challenges by providing a source of intense, cold neutrons to instruments optimized for this source, using rotating, tungsten target blocks. The STS target will receive 1.3 GeV proton beam pulses from the SNS accelerator at a repetition rate of 15 Hz. The facility life is planned for 40 years, and each target assembly life is expected to be approximately 10 years. An accurate strain prediction is then critical for fatigue life assessment of STS target blocks because they will be subject to approximately 108 beam pulses per lifetime. As an R&D activity, the LANSCE WNR Target 2 (blue room) facility was used to test the strain response of prototypical target blocks to the thermal shock of a proton pulse. The blue room was well suited for a pulsed proton beam impact test of subscale STS target blocks; the 800 MeV proton energy is approximately 60% of the 1.3 GeV proton energy expected from the SNS accelerator to the STS. Both the LANSCE Proton Storage Ring (PSR) and SNS are short-pulse proton beam sources with nominal pulse widths of 250 ns and 661 ns, respectively, so the energy deposition in the target occurs in < 1 microsecond pulse duration.

43 PARTICLE ACCELERATORS↗

A Compact Gas Liquid Separator for the Spallation Neutron Source Mercury Process Loop

Upgrades at the spallation neutron source (SNS) accelerator at Oak Ridge National Laboratory are underway to double its proton beam power from 1.4 to 2.8 MW. About 2 MW will go to the current first station while the rest will go to the future Second Target Station. The increase of beam power to the first target station is especially challenging for its mercury target. When the short proton beam hits the target, strong pressure waves are generated, causing cavitation erosion and challenging stresses for the target's weld regions. SNS has successfully operated reliably at 1.4 MW by mitigating the pressure wave with the injection of small Helium bubbles into the mercury. To operate reliably at 2 MW, more gas will be injected into mercury to mitigate the pressure wave further. However, the mercury process loop was not originally designed for gas injection, and the accumulation of gas in the pipes is a concern. Due to space constraints, a custom gas liquid separator (GLS) was designed to fit a 90-deg horizontal elbow space in the SNS mercury loop. Simulations and experiments were performed, and a successful design was developed that has the desired efficiency while keeping the pressure losses acceptable.

42 ENGINEERING↗

Bubble Generation in the SNS 2 MW Mercury Target

The accelerator at the Spallation Neutron Source is currently being upgraded to increase the proton beam power from 1.4 MW to 2.8 MW. About 2 MW will go to the first target station, while the rest will go to the future second target station. The first target station uses a mercury target. When the short proton beam pulse hits it, strong pressure waves are developed inside the mercury and the vessel itself, causing weld failures and cavitation erosion. The pressure wave can be significantly mitigated by injecting small helium bubbles into the mercury. SNS has been injecting helium since 2017 using small orifices but has met challenges in fabrication and operations with them. Thus, for the 2 MW target, swirl bubblers will be used to increase gas injection and improve reliability. A 2 MW prototypical target was built and tested in a mercury process loop available at Oak Ridge National Laboratory. Acrylic viewports on the top of the target were used to determine the bubble size distribution (BSD) generated by the swirl bubblers. It was found that the bubblers were not only capable of generating small bubbles but that the BSD was independent of gas injection rate.

Barbier, Charlotte↗