Search NASASearch

Engineering topics

Sank, Victor

Publications and source records attributed to Sank, Victor.

International Space Station (ISS) S-Band Corona Discharge Anomaly Consultation

The Assembly and Contingency Radio Frequency Group (ACRFG) onboard the International Space Station (ISS) is used for command and control communications and transmits (45 dBm or 32 watts) and receives at S-band. The system is nominally pressurized with gaseous helium (He) and nitrogen (N2) at 8 pounds per square inch absolute (psia). MacDonald, Dettwiler and Associates Ltd. (MDA) was engaged to analyze the operational characteristics of this unit in an effort to determine if the anomalous behavior was a result of a corona event. Based on this analysis, MDA did not recommend continued use of this ACRFG. The NESC was requested to provide expert support in the area of high-voltage corona and multipactoring in an S-Band RF system and to assess the probability of corona occurring in the ACRFG during the planned EVA. The NESC recommended minimal continued use of S/N 002 ACRFG until a replacement unit can be installed. Following replacement, S/N 002 will be subjected to destructive failure analysis in an effort to determine the proximate and root cause(s) of the anomalous behavior.

Kichak, Robert A.

DAWN Mission Bus and Waveguide Venting Analysis Review

A concern was raised regarding the time after launch when the DAWN Mission Communications Subsystem, which contains a 100 Watt X-Band Traveling Wave Tube Amplifier (TWTA) with a high voltage ((approximately 7 Kilo Volt (KV)) Electronic Power Converter (EPC), will be powered on for the first post-launch downlink. This activation is planned to be approximately one hour after launch. Orbital Sciences (the DAWN Mission spacecraft contractor) typically requires a 24-hour wait period prior to high voltage initiation for Earth-orbiting Science and GEO spacecraft. The concern relates to the issue of corona and/or radio frequency (RF) breakdown of the TWTA ((high voltage direct current (DC) and RF)), and of the microwave components (high voltage RF) in the presence of partial atmospheric pressures or outgassing constituents. In particular, generally the diplexer and circulator are susceptible to RF breakdown in the corona region due to the presence of small physical gaps ((~ 2.5 millimeter (mm)) between conductors that carry an RF voltage. The NESC concurred the DAWN Mission communication system is safe for activation.

Cragg, Clinton H.

Low Resolution Picture Transmission (LRPT) Demonstration System

Low-Resolution Picture Transmission (LRPT) is a proposed standard for direct broadcast transmission of satellite weather images. This standard is a joint effort by the European Organization for the Exploitation of Meteorological Satellites (EUMETSAT) and the National Oceanic Atmospheric Administration (NOAA). As a digital transmission scheme, its purpose is to replace the current analog Automatic Picture Transmission (APT) system for use in the Meteorological Operational (METOP) satellites. Goddard Space Flight Center has been tasked to build an LRPT Demonstration System (LDS). It's main objective is to develop or demonstrate the feasibility of a low-cost receiver utilizing a Personal Computer (PC) as the primary processing component and determine the performance of the protocol in the simulated Radio Frequency (RF) environment. The approach would consist of two phases. In the phase 1, a Commercial-off-the-Shelf (COTS) Modulator-Demodulator (MODEM) board that would perform RF demodulation would be purchased allowing the Central Processing Unit (CPU) to perform the Consultative Committee for Space Data Systems (CCSDS) protocol processing. Also since the weather images are compressed the PC would perform the decompression. Phase 1 was successfully demonstrated on December 1997. Phase 2 consists of developing a high-fidelity receiver, transmitter and environment simulator. Its goal is to find out how the METOP Specification performs in a simulated noise environment in a cost-effective receiver. The approach would be to produce a receiver using as much software as possible to perform front-end processing to take advantage of the latest high-speed PCs. Thus the COTS MODEM used in Phase 1 is performing RF demodulation along with data acquisition providing data to the receiving software. Also, environment simulator is produced using the noise patterns generated by Institute for Telecommunications Sciences (ITS) from their noise environment study.

Fong, Wai

Low Resolution Picture Transmission (LRPT) Demonstration System

Low-Resolution Picture Transmission (LRPT) is a proposed standard for direct broadcast transmission of satellite weather images. This standard is a joint effort by the European Organization for the Exploitation of Meteorological Satellites (EUMETSAT) and NOAA. As a digital transmission scheme, its purpose is to replace the current analog Automatic Picture Transmission (APT) system for use in the Meteorological Operational (METOP) satellites. GSFC has been tasked to build an LRPT Demonstration System (LDS). Its main objective is to develop or demonstrate the feasibility of a low-cost receiver utilizing a PC as the primary processing component and determine the performance of the protocol in the simulated Radio Frequency (RF) environment. The approach would consist of two phases.

Fong, Wai

Timekeeping for the Space Technology 5 (ST-5) Mission

Space Technology 5, or better known as ST-5, is a space technology development mission in the New Millennium Program (NMP) and NASA s first experiment in the design of miniaturized satellite constellations. The mission will design, integrate and launch multiple spacecraft into an orbit high above the Earth s protective magnetic field known as the magnetosphere. Each spacecraft incorporates innovative technology and constellation concepts which will be instrumental in future space science missions. A total of three ST-5 spacecraft will be launched as secondary payloads into a highly elliptical geo-synchronous transfer orbit, and will operate as a 3-element constellation for a minimum duration of 90 days. In order to correlate the time of science measurements with orbit position relative to the Earth, orbit position in space (with respect to other objects in space) and/or with events measured on Earth or other spacecraft, accurate knowledge of spacecraft and ground time is needed. Ground time as used in the USA (known as Universal Time Coordinated or UTC) is maintained by the U.S. Naval Observatory. Spacecraft time is maintained onboard within the Command and Data Handling (C&DH) system. The science requirements for ST-5 are that spacecraft time and ground time be correlatable to each other, with some degree of accuracy. Accurate knowledge of UTC time on a spacecraft is required so that science measurements can be correlated with orbit position relative to the Earth, orbit position in space and with events measured on Earth or other spacecraft. The most crucial parameter is not the clock oscillator frequency, but more importantly, how the clock oscillator frequency varies with time or temperature (clock oscillator drift). Even with an incorrect clock oscillator frequency, if there were no drift, the frequency could be assessed by comparing the spacecraft clock to a ground clock during a few correlation events. Once the frequency is accurately known, it is easy enough to make a regular adjustment to the spacecraft clock or to calculate the correct ground time for a given spacecraft clock time. The oscillator frequency, however, is temperature dependent, drifts with age and is affected by radiation; hence, repeated correlation measurements are required.

Raphael, Dave