Search NASA⌕ Search

Engineering topics

Santana, Manuel

Publications and source records attributed to Santana, Manuel.

At least 19 records

Optimization of the cesiation process for the spallation neutron source (SNS) H - ion sources

RF-driven (internal and external antenna), Cs-enhanced H - ion sources at the Spallation Neutron Source (SNS) facility are capable of producing high current (>60 mA), high duty-factor (1 ms, 60 Hz) H - beams lasting multiple months. A solid reaction Cs dispenser system is used to cesiate the ion source. This work reports on our continuous effort to optimize the ion source cesiation process guided by the Cs signal observed with the plasma emission spectroscopy to mitigate the Cs induced high voltage sparking while assuring to enable high H - beam currents

Han, Baoxi↗

Record Performance of and Extraction Studies with the Spallation Neutron Source H- Injector

During the past year the Spallation Neutron Source has operated with proton beam powers up to 1.4 MW with good availability. However, after a recent premature target failure the power was reduced to 1 MW for the ~20-week service cycle of the new target, whereas the subsequent target will be used at 1.2 MW. The ion source and low-energy beam transport deliver 50 to 60 mA H- beams into the RFQ with availbilities of ~99.5%. The compromised RFQ transmission limits the LINAC beam to ~35 mA, which is sufficient for 1.4 MW. Our current injector efforts focus on improving reliability and increasing the source service cycles beyond the achived 7 A·h to reduce the venting of the RFQ and to improve the stability of the accelerator operations. In addition, extraction studies show that higher extraction fields improve the RFQ transmission, apparently due to a reduced emittance of the LEBT H- beams.

Stockli, Martin P.↗

A New 2.5 MeV Injector and Beam Test Facility for the Spallation Neutron Source

The U.S. Spallation Neutron Source (SNS) now operates with 1.2 MW of beam power on target with the near-term goal of delivering 1.4 MW and a longer-term goal of delivering >2 MW to support a planned second target station. Presently, H- beam pulses (50-60 mA, 1 ms, 60 Hz) from an RF-driven, Cs-enhanced, multi-cusp ion source are first accelerated to 2.5 MeV by a Radio Frequency Quadrupole (RFQ) accelerator, injected into a ~1 GeV linac, compressed to <1μs in an accumulator ring and ultimately delivered to a liquid mercury target for pulsed neutron production. In recent years concerns about the RFQ performance has motivated the procurement of a new RFQ and the creation of a Beam Test Facility (BTF) to allow off-line testing. The purpose of the BTF is to first validate performance of the new RFQ before installing it in place of the existing RFQ and later to serve as a stand-alone 2.5 MeV research accelerator employing the original SNS RFQ. After validating the new RFQ with respect to energy, emittance and transmission, the initial applications of the BTF will be to conduct 6D beam dynamic studies, develop & demonstrate ion sources capable of meeting the current and future requirements of the SNS, and contribute to neutron moderator development. This report provides a facility update, description of the BTF ion source systems as well as a discussion of the first LEBT and RFQ beam current measurements performed at the BTF.REFERENCES

Welton, Robert F.↗

The status of the SNS external antenna ion source and spare RFQ test facility

The Oak Ridge National Laboratory operates the Spallation Neutron Source, consisting of a H{sup −} ion source, a 1 GeV linac and an accumulator ring. The accumulated <1 μs-long, ∼35 A beam pulses are extracted from the ring at 60 Hz and directed onto a liquid Hg target. Spalled neutrons are directed to ∼20 world class instruments. Currently, the facility operates routinely with ∼1.2 MW of average beam power, which soon will be raised to 1.4 MW. A future upgrade with a second target station calls for raising the power to 2.8 MW. This paper describes the status of two accelerator components expected to play important roles in achieving these goals: a recently acquired RFQ accelerator and the external antenna ion source. Currently, the RFQ is being conditioned in a newly constructed 2.5 MeV Integrated Test Facility (ITF) and the external antenna source is also being tested on a separate test stand. This paper presents the results of experiments and the testing of these systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Recent Performance of and Plasma Outage Studies with the SNS H- Source

SNS ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised RFQ, which requires higher RF power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H- beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ~55-kW 2-MHz plasma pulses reflecting ~90% of the continuous ~300W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly-detuned 13-MHz match. Lowering the H2 also increased the H- beam current to ~55 mA, and increased the transmission by ~7%.

H- ion source↗

A look ahead: Status of the SNS external antenna ion source and the new RFQ test stand

The U.S. Spallation Neutron Source (SNS) now operates with ∼1 MW of beam power to target with the near-term goal of delivering 1.4 MW. Plans are being considered to incorporate a second target station into the facility which will require ∼2.8 MW of beam power. Presently, H{sup −} beam pulses (∼1 ms, 60 Hz) are produced by an RF-driven, Cs-enhanced, multi-cusp ion source which injects beam into an RFQ (Radio Frequency Quadrupole) accelerator that, in turn, feeds the SNS Linac. Currently the source/RFQ system delivers ∼35 mA of pulsed current to the linac which is mostly sufficient for 1.4 MW operations while ∼50 mA are needed for the second target station upgrade. This paper provides a look forward for the SNS by providing (i) the present and future SNS source/RFQ beam requirements and our plans to achieve these, (ii) a description and status of the external antenna ion source being developed for the replacement of the current internal antenna ion source, and (iii) a description and status of the newly constructed RFQ test facility.

43 PARTICLE ACCELERATORS↗

Ion extraction from a saddle antenna RF surface plasma source

Existing RF Surface Plasma Sources (SPS) for accelerators have specific efficiencies for H{sup +} and H{sup −} ion generation around 3 to 5 mA/cm{sup 2} per kW, where about 50 kW of RF power is typically needed for 50 mA beam current production. The Saddle Antenna (SA) SPS described here was developed to improve H{sup −} ion production efficiency and SPS reliability and availability. At low RF power, the efficiency of positive ion generation in the plasma has been improved to 200 mA/cm{sup 2} per kW of RF power at 13.56 MHz. Initial cesiation of the SPS was performed by heating cesium chromate cartridges by discharge as was done in the very first versions of the SPS. A small oven to decompose cesium compounds and alloys was developed and tested. After cesiation, the current of negative ions to the collector was increased from 1 mA to 10 mA with RF power ∼1.5 kW in the plasma (6 mm diameter emission aperture) and up to 30 mA with ∼4 kW RF power in the plasma and 250 Gauss longitudinal magnetic field. The ratio of electron current to negative ion current was improved from 30 to 2. Stable generation of H{sup −} beam without intensity degradation was demonstrated in the AlN discharge chamber for a long time at high discharge power in an RF SPS with an external antenna. Continuous wave (CW) operation of the SA SPS has been tested on the small test stand. The general design of the CW SA SPS is based on the pulsed version. Some modifications were made to improve the cooling and cesiation stability. The extracted collector current can be increased significantly by optimizing the longitudinal magnetic field in the discharge chamber. CW operation with negative ion extraction was tested with RF power up to 1.8 kW from the generator (∼1.2 kW in the plasma) with production up to Ic=7 mA. Long term operation was tested with 1.2 kW from the RF generator (∼0.8 kW in the plasma) with production of Ic=5 mA, Iex ∼15 mA (Uex=8 kV, Uc=14 kV)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recent Performance and Ignition Tests of the pulsed SNS H- Source for 1-MW Neutron Production

After acquiring several reliable spare targets, SNS ramped the beam power from 850 kW to 1.4 MW, which required an increase in H- beam pulse length from 0.88 to 1.0 ms at 60 Hz. This increase initially produced slow 2-MHz power ramp-ups and, after several weeks of uninterrupted operation, it produced plasma outages every time the pulse length was raised above ~0.95 ms. Similar outages were previously observed towards the end of long service cycles, which were believed to indicate that the breakdown voltage of the high purity hydrogen started to exceed the induced electric fields. In 2011 the RF was reconfigured to start with 10 cycles of 1.96 MHz, which yielded the shortest H- beam rise times and apparently eliminated those plasma outages. The new, pulse-length dependent outages were eliminated by increasing the initial frequency to 1.985 MHz. However, careful frequency studies are unable to justify this frequency. In addition, the paper discusses the issues and solutions for the electron-dump voltage, which starts to sag and become unstable after several weeks of high current operation.

43 PARTICLE ACCELERATORS↗

Improvements to the internal and external antenna H{sup −} ion sources at the Spallation Neutron Source

The Spallation Neutron Source (SNS), a large scale neutron production facility, routinely operates with 30–40 mA peak current in the linac. Recent measurements have shown that our RF-driven internal antenna, Cs-enhanced, multi-cusp ion sources injects ∼55 mA of H{sup −} beam current (∼1 ms, 60 Hz) at 65-kV into a Radio Frequency Quadrupole (RFQ) accelerator through a closely coupled electrostatic Low-Energy Beam Transport system. Over the last several years a decrease in RFQ transmission and issues with internal antennas has stimulated source development at the SNS both for the internal and external antenna ion sources. This report discusses progress in improving internal antenna reliability, H{sup −} yield improvements which resulted from modifications to the outlet aperture assembly (applicable to both internal and external antenna sources) and studies made of the long standing problem of beam persistence with the external antenna source. The current status of the external antenna ion source will also be presented.

43 PARTICLE ACCELERATORS↗

Plasma emission spectroscopy for operating and developing the Spallation Neutron Source (SNS) H- ion sources

An RF-driven, Cs-enhanced H- ion source feeds the SNS accelerator with a high current (typically >50 mA), ~1.0 ms pulsed beam at 60 Hz. To achieve the persistent high current beam for several weeks long service cycles, each newly installed ion source undergoes a rigorous conditioning and cesiation processes. Plasma conditioning outgases the system and sputter-cleans the ion conversion surfaces. A cesiation process immediately following the plasma conditioning releases Cs to provide coverage on the ion conversion surfaces. The effectiveness of the ion source conditioning and cesiation is monitored with plasma emission spectroscopy using a high-sensitivity optical spectrometer. Plasma emission spectroscopy is also used to provide a mean for diagnosing and confirming a failure of the insulating coating of the ion source RF antenna which is immersed in the plasma. Emissions of composition elements of the antenna coating material, Na emission being the most significant, drastically elevate to signal a failure when it happens. Plasma spectra of the developmental ion source with an AlN chamber and an external RF antenna are also briefly discussed.

Han, Baoxi↗

Recent Performance of the SNS H- ion source and low-energy beam transport system

Recent measurements of the H beam current show that SNS is injecting about 55 mA into the RFQ compared to 45 mA in 2010. Since 2010, the H beam exiting the RFQ dropped from 40 mA to 34 mA, which is sufficient for 1 MW of beam power. To minimize the impact of the RFQ degradation, the service cycle of the best performing source was extended to 6 weeks. The only degradation is fluctuations in the electron dump voltage towards the end of some service cycles, a problem that is being investigated. Very recently, the RFQ was retuned, which partly restored its transmission. In addition, the electrostatic low-energy beam transport system was reengineered to double its heat sinking and equipped with a thermocouple that monitors the temperature of the ground electrode between the two Einzel lenses. The recorded data show that emissions from the source at high voltage dominate the heat load. Emissions from the partly Cs-covered first lens cause the temperature to peak several hours after starting up. On rare occasions, the temperature can also peak due to corona discharges between the center ground electrode and one of the lenses.

H- source↗

Recent Performance of the SNS H-Source for 1-MW Neutron Production

This paper describes the performance of the SNS ion source and LEBT as they continue to deliver ~50 mA H- beams at a 5.3% duty factor required for neutron production with a ~1MW proton beam since the fall of 2009. The source continues to deliver persistent H- beams for up to 6 weeks without adding Cs after an initial dose of ~4 mg, except when there are excessive plasma impurities. In one case the H- beam decayed due to an air leak, which is shown to be consistent with sputtering of the Cs layer, and which allows to bracket the plasma potential. In another case, the performance of two sources degraded progressively, which appears to be consistent with a progressive deterioration of the Cs covered Mo converter. These two and other recently discovered issues are discussed in detail.

Cesium↗

Producing Persistent, High-Current, High-Duty-Factor H- Beams for Routine 1 MW Operation of SNS

Since 2009, SNS has been producing neutrons with ion beam powers near 1 MW, which requires the extraction of ~50 mA H- ions from the ion source with a ~5% duty factor. The 50 mA are achieved after an initial dose of ~3 mg of Cs and heating the Cs collar to ~170 C. The 50 mA normally persist for the entire 4-week source service cycles. Fundamental processes are reviewed to elucidate the persistence of the SNS H- beams without a steady feed of Cs and why the Cs collar temperature may have to be kept near 170 C.

Cesium↗