Search NASA⌕ Search

Engineering topics

Saulsbury, James

Publications and source records attributed to Saulsbury, James.

1.2.4.403 - Pumped Storage Hydropower FAST Commissioning Prize

The Pumped Storage Hydropower (PSH) FAST Commissioning Prize aimed to reduce the time, cost, and risk required to commission PSH projects by crowdsourcing ideas via a three-stage prize. Objectives were to reduce the time to commission PSH projects from 10+ years to less than 5 years and to develop a baseline analysis for PSH.

HYDRO ENERGY↗

Developing a Decision Support Engine to Enable Irrigation Modernization - Poster

Irrigation systems in the United States are some of the oldest continually utilized infrastructure in existence today, with some systems exceeding 100 years in age. They are operated to meet farming demands but are managed through a balance of varying influence: policies limiting water usage, stakeholder interests, and environmental impacts. Irrigation modernization is defined as a set of activities that update and improve existing irrigation systems, including, but not limited to improving water quantity, development of distributed energy resources for surrounding communities, ecosystem services, and improved agricultural yields. Modernizing an existing irrigation system can enable stakeholders to combat changing environmental and population demands but is difficult because the complexity involved in determining the potential benefits and consequences of irrigation modernization is high. We are combining a large amount of various geospatial, tabular, and temporal data with subject matter expertise into a decision support engine that will enable stakeholders to determine the benefits and consequences of irrigation modernization in their irrigation systems. A web-based GIS will allow the user to construct the modifications out of a palette of modernization options, which will be sent to the analytics engine for computations, and back to the web client for a graphical display and comparison of relevant metrics. Our development process involves four phases: 1) identify mechanisms of modernization, 2) identify data requirements, data streams, first principles and applicable algorithms necessary to quantify modernization mechanisms, 3) create ‘modules’ for each modernization mechanism, these modules will form the decision support engine, each capable of performing independently but can also inform other modules when needed, 4) Merge the decision support engine with a user interface, capable of ingesting user inputs and returning insights into the impacts of a modernization project as they relate to economic, environmental, monetary, and energy generation. Once complete, it is our intention that this tool will be fundamental in irrigation modernization projects, providing a strong analytical basis from which stakeholders can quickly make informed decisions regarding project development.

13 HYDRO ENERGY↗

The Integrated Basin-Scale Opportunity Assessment Initiative, FY 2011 Year-End Report: Deschutes Basin Preliminary Hydropower Opportunity Assessment. Draft Report

This document reports on first-year progress of the Integrated Basin-Scale Opportunity Assessment Initiative, an action item of the March 24, 2010 Sustainable Hydropower Memorandum of Understanding (MOU) between the U.S. Department of Energy (DOE), U.S. Army Corps of Engineers, and the Bureau of Reclamation. As envisioned in the MOU, an integrated basin-scale opportunity assessment would take a system-scale approach to identifying opportunities and actions to both increase hydropower and enhance environmental conditions within the context of existing water uses in river basins of the United States. Assessments are intended to be collaborative processes that work with stakeholders at the basin scale to identify hydropower and environmental opportunity scenarios. Opportunity scenarios are analyzed, again in collaboration with stakeholders, through modeling and visualization software to assess tradeoffs and system-scale effects. Opportunity assessments are not intended to produce decisional documents or substitute for basin planning processes; assessments are instead intended to provide tools, information, and a forum for catalyzing conversation about scenarios where environmental and hydropower gains can both be realized within a given basin. In fiscal year 2011, DOE’s Energy Efficiency and Renewable Energy Water Power Team provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and Argonne National Laboratory to develop an assessment approach and toolbox, and carry out an initial pilot opportunity assessment. In February 2011, the Upper Deschutes/Crooked River Basin in central Oregon was selected as the pilot basin. Through establishment of stakeholder working groups, a technical site visit, a series of interviews, a stakeholder workshop, and identification of existing tools and data sets, initial opportunities have been identified and analytical tools selected to explore opportunity scenarios. This report documents project progress to date, describes the opportunity assessment approach, and establishes an agenda for analysis of stakeholder-identified opportunities in fiscal year 2012. Findings presented here are preliminary; the final Deschutes Basin pilot study report will be submitted at the end of fiscal year 2012.

13 HYDRO ENERGY↗