Search NASASearch

Engineering topics

Saunders, R.

Publications and source records attributed to Saunders, R..

Mars 2001 Space Opportunities

This paper describes the status of the planned NASA Mars Surveyor Program 2001 orbiter and lander. If the lander is approved for launch, it will be sent to a safe landing site.

Science Objectives GRS THEMIS MARIE APEX MARDI MEC

Constraints, Approach, and Status of Mars Surveyor 2001 Landing Site Selection

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities. Additional information is contained in the original extended abstract.

Golombek, M.

Constraints and Approach for Selecting the Mars Surveyor '01 Landing Site

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

Golombek, M.

An Intercomparison of Radiation Codes for Retrieving Upper Tropospheric Humidity in the 6.3-micron Band: A Report from the 1st GVaP Workshop

An intercomparison of radiation codes used in retrieving upper tropospheric humidity (UTH) from observations in the v2 (6.3 microns) water vapor absorption band was performed. This intercomparison is one part of a coordinated effort within the GEWEX Water Vapor Project (GVaP) to assess our ability to monitor the distribution and variations of upper tropospheric moisture from space-borne sensors. A total of 23 different codes, ranging from detailed line-by-line (LBL) models, to coarser resolution narrow-band (NB) models, to highly-parameterized single-band (SB) models participated in the study. Forward calculations were performed using a carefully selected set of temperature and moisture profiles chosen to be representative of a wide range of atmospheric conditions. The LBL model calculations exhibited the greatest consistency with each other, typically agreeing to within 0.5 K in terms of the equivalent blackbody brightness temperature (T(sub b)). The majority of NB and SB models agreed to within +/- 1 K of the LBL models, although a few older models exhibited systematic T(sub b) biases in excess of 2 K. A discussion of the discrepancies between various models, their association with differences in model physics (e.g. continuum absorption), and their implications for UTH retrieval and radiance assimilation is presented.

Soden, B.

Constraints, Approach and Present Status for Selecting the Mars Surveyor 2001 Landing Site

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough, defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

Golombek, M.