Search NASA⌕ Search

Engineering topics

Schleicher, Robert

Publications and source records attributed to Schleicher, Robert.

A Simple Program to Estimate the Fast Modular Reactor Steady-State Closed Brayton Cycle Operating Parameters

The Fast Modular Reactor (FMR) is a gas-cooled fast reactor (GFR) that produces a net electricity output of 50 MW with helium-driven closed Brayton cycle. The power plant includes reactor system and power conversion unit (PCU). The reactor system produces fission energy that is transferred by helium flow. The PCU consists of a turbine, two compressors, and three heat exchanges. More specifically, the recuperator is a counter-flow energy recovery heat exchanger. The precooler and intercooler are the heat sinks. To analyze and understand the sensitivity of plant performance to the design parameters, a numerical program was written to calculate the plant operating parameters represented by the helium temperature, pressure, mass flow, and the heat sink temperatures. The program was developed for the steady-state operating condition. etc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗