Search NASA⌕ Search

Engineering topics

Schneider, St P

Publications and source records attributed to Schneider, St P.

Engineering and Technology Road-map

Throughout its existence, the Environmental Management (EM) program has required a strong technology component to accomplish its mission, one that is focused on developing technologies to enhance safety, effectiveness, and efficiency. Although the Department of Energy (DOE) has made great progress toward safely disposing of the legacies of the Cold War, much remains to be done. These past accomplishments provide a guide for future success; however, the unique nature of many of the remaining challenges will require a strong and responsive applied research and engineering program. The Engineering and Technology Road-map was developed to address this need and guide the EM Engineering and Technology Program. The Road-map identifies the technical risks and uncertainties that the EM program faces over the next ten years; the strategies EM will use to reduce those risks; and the planned outcomes of implementing those strategies. Input for this Road-map was provided by EM Federal Project Directors, Stakeholders, Site Contractors, National Laboratories and the National Academy of Science. To accomplish this work, EM has designated federal Strategic Initiative Managers who will work with Federal Project Directors to develop, refine and implement a detailed scope and schedule for each initiative, as well as identify the point at which the technologies developed will be inserted into EM cleanup projects. The starting point for the Road-map was technical project risk and uncertainty. Risks are defined as known technical issues that could prevent project success. Uncertainties are indefinite or unpredictable technical aspects of a project. Risks included in the Road-map were identified in three ways: 1) By the Projects - EM's operations are performed within a culture of disciplined project management, based on DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. As such, technical risks and uncertainties affecting each cleanup project are identified early in the project life cycle, are captured in project risk assessments, and often lead to applied technology development activities. 2) By reviews and assessments - EM utilizes experts to review the progress of its major cleanup projects and to assess the maturity of evolving technologies. These reviews include External Technical Reviews and Technology Readiness Assessments. They transcend the project's baseline and often identify opportunities for reducing technical risk through development and deployment of innovative or enhanced technologies. 3) By the sites - EM periodically asks EM sites to identify technical risks and uncertainties in the form of technical needs. The Road-map divides EM risks into six program areas: Waste Processing, Groundwater and Soil Remediation, Deactivation and Decommissioning (D and D) and Facility Engineering, Spent Nuclear Fuel, Challenging Materials, and Integration. Tables 1-6 show those risks and uncertainties, as well as the 13 strategic initiatives established to address those risks. In conclusion, the Engineering and Technology Road-map presents an integrated approach to reducing the technical risks and uncertainties facing the EM program in a manner consistent with its disciplined approach to project management. The risks include challenges in waste processing, groundwater and soil remediation, deactivation and decommissioning, spent nuclear fuel, challenging materials, and integration. The EM Engineering and Technology Program will address these risks, and will use applied research and engineering to improve technologies and processes at sites across the country. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

External Technical Reviews in the Environmental Management Program

The Environmental Management (EM) program believes strongly in reducing the technical risk of its projects and has initiated External Technical Reviews (ETR) as one of several steps to ensure the timely resolution of engineering and technology issues. EM's Office of Engineering and Technology is leading the ETR process and is working closely with Federal Project Directors to review such issues as technology development, systems integration, design, operations, maintenance, and nuclear safety. EM has completed several successful reviews using expert engineers and scientists from private industry and academia over the last two years. Additional external technical reviews will be conducted to support key project decisions and will be a mainstay of the EM program. The purpose of an ETR is to reduce technical risk and uncertainty. These independent reviews provide pertinent information for EM to assess technical risk associated with projects and develop strategies for reducing the technical risk, and provide technical information needed to support critical project decisions. Technical risk reduction increases the probability of successful implementation of technical scope. In general, an ETR assesses technical bases, technology development, and technical risk identification and handling strategies. The three key objectives of every ETR are: - To determine if the technology, process, system, or design under review will meet project objectives and requirements, - To identify any issues (show-stoppers) preventing successful implementation of the technology, process, system, or design under review, and - To identify issues or data needed to support critical or other project or program decisions. The specific objectives of ETRs may vary, but generally include: - Determining if technical objectives are well known and defined; - Determining if alternatives have been identified and effectively evaluated; - Determining if technology development is well planned and executed; - Determining the adequacy of quality assurance and scientific investigation; - Determining if technical bases are substantial and adequately documented; - Validating the technical basis and appropriateness of the technology, process, system, or design to technical risk reduction; - Determining if the technology can be deployed and implemented. In conclusion, ETRs have proven to be a valuable tool for reducing technical risk and uncertainty in EM projects. An ETR Process Guide is currently being developed that will provide a standard review and reporting process for all EM ETRs. EM plans to conduct ETRs in the future to support key project decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗