Search NASA⌕ Search

Engineering topics

Schroeder, John A.

Publications and source records attributed to Schroeder, John A..

At least 19 records

Feasibility Study of Developing Alternative Common-Cause Failure Model for Event Assessment

This report is a revision of the original report, INL/LTD-14-33376. The original report, which was a limited distribution to the Nuclear Regulatory Commission (NRC) only and not available to the public, was revised as this report for public distribution. The report presents the feasibility study of alternative common-cause failure (CCF) models that could be used for event assessment in the Standardized Plant Analysis Risk (SPAR) models. The current CCF model used by the SPAR models is the alpha factor model. The proposed alternative CCF models are the partial alpha factor model and general dependency model. These alternative CCF models are reviewed and compared to the current alpha factor model, with the partial alpha factor model being identified as the preferred CCF model that could be used for event assessment in the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors

This report is a revision of the original report, INL/LTD-17-43723. Distribution of the original report was to the Nuclear Regulatory Commission (NRC) only, and the report was not made available to the public. The original report was revised as this report for public distribution. This report presents the latest update of generic prior distributions for common cause failure (CCF) alpha factors, as well as the development of new generic prior distributions for CCF causal alpha factors. The history of CCF treatment and parameter estimations is reviewed. The existing process for developing generic prior distributions is reviewed and used to develop new priors for CCF alpha factors and causal alpha factors. For causal alpha factors, different priors are developed for the five different CCF cause groups: Component (GC), Design (GD), Environment (GE), Human (GH), and Other (GO). These generic prior distributions could be used in the Standardized Plant Analysis Risk (SPAR) models for CCF parameter estimation. The issues and preliminary thoughts regarding prior distribution development are documented. Potential future work is then proposed for improving the process of developing priors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Emergency Power System 1998–2018

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Residual Heat Removal 1998–2018

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from calendar years 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RHR results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998–2018

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from calendar year 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the AFW results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998–2018

This report presents an unreliability evaluation of the high-pressure coolant injection system (HPCI) at 25 U.S. commercial boiling water reactors. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Core Spray 1998–2018

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial boiling water reactors. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Safety Injection 1998–2018

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from calendar years 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Isolation Condenser 1998–2018

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from calendar year 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998–2018

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 31 U.S. commercial boiling water reactors. Demand, run hours, and failure data from calendar years 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RCIC results.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2016

This report presents an enhanced performance evaluation of motor-driven pumps (MDP) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2016 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to one hour, and failure to run more than one hour; for normally running systems, the failure modes considered are failure to start and failure to run. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Highly statistically significant increasing trend was identified in normally running MDP run hours per reactor year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events: 1987-2016

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2016. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). An adverse trend in overall LOOP frequency is identified. An adverse trend in LOOP durations is identified. Plant-centered and weather-related LOOP events do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Initiating Event Rates at U.S. Nuclear Power Plants: 1988–2016

Analyzing initiating event rates is important because it indicates performance among plants and also provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants from calendar year 1988 through 2016 as reported in licensee event reports. Engineers with nuclear power plant experience reviewed each event report since the last update to this report for the presence of valid scrams or reactor trips at power. To be included in the study, an event had to meet all of the following criteria: (1) the event includes an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), (2) the sequence of events started when reactor is critical and at or above the point of adding heat, (3) the event occurred at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and (4) the event was reported by a licensee event report. Sixteen initiating event groupings are trended and displayed. For some of the categories as relevant initiators are plotted separately for boiling water reactors and pressurized water reactors. P values are given for the possible presence of a trend over the most recent 10 years. Statistically significant decreasing trends were identified for BWR loss of heat sink and general transients.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Convolution Correction Factor Adjustments on Static PRA Models for Event Assessment

Current probabilistic risk assessment (PRA) models will contain cut sets that have time-constrained basic events such as switched components, recovery of failed components, and failures in time. For these cut sets that have multiple time-constrained events that interact (e.g., offsite power recover at the same time as multiple diesel generators fail to run), there is the possibility that the minimal cut set quantified result is too large. Since current PRA models typically assume that the accident scenario starts at “time zero,” the fails-to-run basic events use this starting time as the basis for their respective reliability models. Over time, the standard practice was to recognize this issue and accept it as part of the conservatism built into the event tree/fault tree PRA models. However, now that these same PRA models are being used in a regulatory forum, this conservatism needs to be addressed. Further, this issue exists not only for the baseline PRA results, but for deficiencies that have been observed or those that have the potential of occurrence, whether the deficiency is complete failure or just a degraded condition. We have found that this conservatism becomes very important when evaluating scenarios such as station blackout sequences and other loss of offsite power sequences. This paper will address the theory and implemented process used by the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) PRA software. Starting with SAPHIRE version 8, the process that was developed is to calculate a “convolution correction factor” based on three distinct calculations. The first calculation is the cut set based frequency calculated via the standard event tree/fault tree PRA model (assuming all run failures start at time equal to zero). The second calculation is to perform the exact time-constrained calculation by integrating the component failure models over the time period of interest (e.g., time to recover, a mission time). For example, this exact calculation for the case of the diesel generators is to convolve their failure models with the offsite power recovery model to obtain the exact frequency. The third calculation is to produce the convolution correction factor by dividing the exact frequency calculation by the standard cut set frequency. This convolution correction factor is then applied to the PRA cut sets in order to remove the time-constrained conservatism. The process used to obtain the convolution correction factor for the baseline PRA is important; however, in this paper we also describe what happens when there is degradation of a component or a potential deficiency. These issues become very important in order to ensure that the convolution correction factor is re-calculated correctly. If the correction factor does not get re-calculated and the same baseline convolution correction factor is used, the final analysis result could be over conservative or under conservative. This paper will discuss how these issues are addressed and provide examples on how SAPHIRE automatically makes the necessary adjustments. MathCad verification results can be computed using the provided equations and input data.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2014

This report presents a performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The AOV failure modes considered are failure-to-open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Three statistically significant trends were observed in the AOV data: 1) The failure rate estimate for fail-to-operate, across all systems, for valves with less than or equal to twenty demands per reactor year, was found to be increasing. 2) The frequency of failure per reactor year for fail-to-operate, across all systems, for valves with less than or equal to twenty demands per reactor year, was found to be increasing. 3) The frequency of demands per reactor year for valves recording the fail-to-open or fail-to-close failure modes, for valves with greater than twenty demands per year, was found to be decreasing.

99 GENERAL AND MISCELLANEOUS↗

Initiating Event Rates at U.S. Nuclear Power Plants 1988–2013

Analyzing initiating event rates is important because it indicates performance among plants and also provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants since each plant’s low-power license date. The evaluation is based on the operating experience from fiscal year 1988 through 2013 as reported in licensee event reports. Engineers with nuclear power plant experience staff reviewed each event report since the last update to this report for the presence of valid scrams or reactor trips at power. To be included in the study, an event had to meet all of the following criteria: includes an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), sequence of events starts when reactor is critical and at or above the point of adding heat, occurs at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and is reported by a licensee event report. This report displays occurrence rates (baseline frequencies) for the categories of initiating events that contribute to the NRC’s Industry Trends Program. Sixteen initiating event groupings are trended and displayed. Initiators are plotted separately for initiating events with different occurrence rates for boiling water reactors and pressurized water reactors. p-values are given for the possible presence of a trend over the most recent 10 years.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998–2013

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2013 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The MOV failure modes considered are failure to open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified in the MOV spurious operation failure rate estimate (a highly statistically significant trend), and in the MOV spurious operation failure events per reactor year (a highly statistically significant trend). Statistically significant decreasing trends were identified for failure to open/close demand rates.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998–2014

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The MOV failure modes considered are failure to open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. One statistically significant trend was observed in the data: The frequency of demands per reactor year for valves with fail-to-open/close failure modes, for valves with greater than twenty demands per year, was found to be decreasing.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗