Search NASASearch

Engineering topics

Schultz, Ryan

Publications and source records attributed to Schultz, Ryan.

Activating a Natural Fault Zone in the Swiss Alps

One major hurdle for understanding earthquake mechanics are observational limitations. Important phenomena like strain localisation, fault dilation, and fault healing are readily studied in rock mechanical laboratory experiments and with numerical models. At the scale of natural earthquakes, however, these phenomena are often unresolvable, even by state-of-the-art observatories. To overcome this limitation, we are currently building the Earthquake Physics Testbed at the Bedretto Underground Laboratory for Geosciences and Geoenergies (BedrettoLab), an experimental testbed where we can activate an extensively instrumented natural fault zone via hydraulic stimulation. The goal of the Fault Activation and Earthquake Rupture (FEAR) project is to induce earthquakes of up to Mw~1.0 on this exceptionally well characterised and instrumented fault zone. Here we summarize the main scientific goals and current FEAR project status, and present first results from conducted experiments. We discuss how this large-scale experimental approach may allow us to tackle both fundamental science as well as practical questions on earthquake physics, induced seismicity and seismic hazard.

Meier, Men-Andrin

Synapse-specific catecholaminergic modulation of neuronal glutamate release

Norepinephrine in vertebrates and its invertebrate analog, octopamine, regulate the activity of neural circuits. We find that, when hungry,Drosophilalarvae switch activity in type II octopaminergic motor neurons (MNs) to high-frequency bursts, which coincide with locomotion-driving bursts in type I glutamatergic MNs that converge on the same muscles. Optical quantal analysis across hundreds of synapses simultaneously reveals that octopamine potentiates glutamate release by tonic type Ib MNs, but not phasic type Is MNs, and occurs via the G q -coupled octopamine receptor (OAMB). OAMB is more abundant in type Ib terminals and acts through diacylglycerol and its target Unc13A, a key component of the glutamate release machinery. Potentiation varies significantly—by up to 1,000%—across synapses of a single Ib axon, with synaptic Unc13A levels determining both release probability and potentiation. We propose that a dual molecular mechanism—an upstream neuromodulator receptor and a downstream transmitter release controller—fine-tunes catecholaminergic modulation so that strong tonic synapses exhibit large potentiation, while weaker tonic and all phasic synapses maintain consistency, yielding a sophisticated regulation of locomotor behavior.

Science & Technology - Other Topics

Rattlesnake User's Manual (V.3)

Rattlesnake is a combined-environments, multiple input/multiple output control system for dynamic excitation of structures under test. It provides capabilities to control multiple responses on the part using multiple exciters using various control strategies. Rattlesnake is written in the Python programming language to facilitate multiple input/multiple output vibration research by allowing users to prescribe custom control laws to the controller. Rattlesnake can target multiple hardware devices, or even perform synthetic control to simulate a test virtually. Rattlesnake has been used to execute control problems with up to 200 response channels and 24 shaker drives. This document describes the functionality, architecture, and usage of the Rattlesnake controller to perform combined environments testing.

97 MATHEMATICS AND COMPUTING

Measured vs. Calculated Dose Rates During Ring Injection Dump Replacement

One of the most irradiated Spallation Neutron Source (SNS) accelerator components is the ring injection dump (RID), which is located downstream of the accumulator ring injection section. The unstripped and only partially stripped H - beam, about 5% of the full SNS beam current, is discarded in the injection into the accumulator ring and is redirected to the RID. According to the accelerator operation plan, the beam stop and the window assemblies of the existing RID are removed and replaced when they have reached their end-of-life owing to radiation exposure. This procedure, which includes multiple steps, took place during a facility maintenance period in March 2023. To support work planning and meet as low as reasonably achievable (ALARA) requirements during removal and exchange of the components, dose rates were calculated for each stage of the exchange operation. During each stage, dose rates were measured before and after work. This comparison shows that measured dose rates are within a factor of 2 of the predicted (calculated) dose rates.

43 PARTICLE ACCELERATORS