Search NASA⌕ Search

Engineering topics

Schwartz, Brandon

Publications and source records attributed to Schwartz, Brandon.

Integrating risk assessment methods for carbon storage: A case study for the quest carbon capture and storage facility

This paper documents how tools developed by the National Risk Assessment Partnership (NRAP) complement the Bowtie risk assessment approach through the demonstration of a risk-based Area of Review (AoR) determination for the Quest Carbon Capture and Storage (CCS) facility near Edmonton, Alberta with the NRAP Open-Source Integrated Assessment Model (NRAP Open-IAM). The Bowtie risk assessment for the Quest CCS site was developed by Shell Canada Ltd., who operates the asset on behalf of the Athabasca Oil Sand Project — a joint venture, owned by Canadian Natural Resources Ltd, Chevron Canada and Shell Canada Ltd. The Quest Bowtie treats site risk comprehensively – considering a large set of technical and project risks (e.g., operational risks, above ground infrastructure, public perception, etc.). NRAP tools, methods, and analyses are focused on quantitative assessment of subsurface technical risks. NRAP-Open-IAM was used to evaluate potential groundwater impacts at the Quest site, i.e., a sufficient change above background groundwater quality levels to be measurable, should CO 2 and/or brine leak from the reservoir via a faulty and/or compromised wellbore. Our results show there is a low potential for groundwater impact and support a further reduction (from ~460 to 100 km 2 ) to the established AoR for the Quest site. Integrating both approaches early in the site characterization period could significantly benefit commercial-scale projects by drastically reducing the region over which leakage risks (e.g., legacy wells) need to be evaluated, i.e., the AoR. This is especially true for brownfield sites, which could contain hundreds to thousands of legacy wells. Further, basing monitoring network design on those regions where impacts are most likely to occur has the potential to facilitate more efficient deployment of monitoring technologies and improve the likelihood of detecting a leak should one occur.

58 GEOSCIENCES↗

NRAP Recommended Practices for Containment Assurance and Leakage Risk Quantification

This report presents recommendations for quantitatively assessing and managing leakage risk and effective containment assurance at geologic carbon storage (GCS) sites, amidst uncertainty in site characteristics and performance. These recommended practices are a product of the U.S. Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management’s National Risk Assessment Partnership (NRAP)—a multi-year collaborative research effort of Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, National Energy Technology Laboratory, and Pacific Northwest National Laboratory. These recommended practices are organized as a set of conceptual workflows that correspond with the stages of the GCS project lifecycle. They consider aspects of site characterization, quantification of potential leakage, assessing the spatial extent of potential environmental impacts, optimizing monitoring design for detection of potential leakage, evaluation of concordance between monitored and forecasted reservoir response, assessing conformance with expected/accepted performance, and determination of the timeline over which risk of impactful leakage can be expected to abate. These conceptual workflows are intended to aid stakeholders in making risk management decisions at GCS sites and to support development of sound, risk-based justifications for characterizing the subsurface, defining area of potential leakage impact, designing site monitoring plans, selecting leakage risk management/mitigation alternatives, and estimating site closure timelines.

54 ENVIRONMENTAL SCIENCES↗