A review of examples and opportunities to quantify the grid reliability and resilience impacts of energy efficiency
Not Available
Engineering topics
Publications and source records attributed to Schwartz, Lisa.
Not Available
This study analyzed the cost performance of electricity efficiency programs implemented by 116 investor-owned utilities between 2009 and 2015 in 41 states, representing about three-quarters of the total spending on U.S. efficiency programs. We applied our typology to characterize efficiency programs along several dimensions (market sector, technology, delivery approach, and intervention strategy) and report the costs incurred by utilities and other program administrators to achieve electricity savings as a result of the programs. Such cost performance data can be used to compare relative costs of different types of efficiency programs, evaluate efficiency options alongside other electricity resources, benchmark local efficiency programs against regional and national cost estimates, and assess the costs of meeting state efficiency policies. The savings-weighted average cost of saved electricity for the period was $0.025/kilowatt-hour (kWh). The cost of saved electricity for programs that targeted residential customers was $0.021/kWh, compared to $0.025/kWh for programs for commercial and industrial customers. Ultimately, we developed an aggregate program savings “cost curve” for the actual electricity efficiency resource during the period that provides insights into the relative costs of various types of efficiency programs and the savings contribution of each program type to the efficiency resource at a national level.
Here, this study develops projections of future spending and savings from electricity efficiency programs funded by electric utility customers in the United States through 2030 based on three scenarios. Our analysis relies on detailed bottom-up modeling of current state energy efficiency policies, demand-side management and integrated resource plans, and regulatory decisions. The three scenarios represent a range of potential outcomes given the policy environment at the time of the study and uncertainties in the broader economic and state policy environment in each state. We project spending to increase to $8.6 billion in 2030 in the medium scenario, about a 45 percent increase relative to 2016 spending. In the high case, annual spending increases to $11.1 billion in 2030 and remains relatively flat in the low case ($6.8 billion in 2030). Our analysis suggests that electricity efficiency programs funded by utility customers will continue to impact load growth significantly at least through 2030, as savings as a percent of retail sales are forecast at 0.7 percent in the medium scenario and 0.98 percent in the high scenario.
This issue brief is for local governments that are well-positioned to participate in a commercial property assessed clean energy (C-PACE) program but are looking to inform a decision about whether to join or create a program. This resource addresses two specific barriers these local governments may face regarding C-PACE programs: (1) uncertainty about the likelihood of tax foreclosure on properties in default of C-PACE payments and the risks local governments bear, and (2) uncertainty about the staff labor commitment associated with administering the program, including the execution of the special tax assessment process.
Property Assessed Clean Energy (PACE) financing enables building owners to finance energy efficiency, renewable energy, and, in some states, non-energy building improvements through a voluntary special assessment on their properties. For commercial buildings, there are many benefits to using Commercial PACE (C-PACE) financing. Still, using C-PACE financing is a multi-step process and involves diverse stakeholders (see Figure ES-1 for a simplified overview), and the process may vary depending on the state and policy context. The primary audience for this report, Lessons in Commercial PACE Leadership, is state and local decision makers that seek an informed, objective perspective of what it takes to launch a C-PACE program. The report is specifically for those states with enabling legislation and program sponsors (i.e., state or local governments) that are looking to launch or join a C-PACE program. The report is a starting point for understanding what approaches have worked to establish successful C-PACE programs. It examines the experience of programs across the country and provides insights for making the process smoother, and hopefully less cost and time-intensive, for new state and local governments sponsoring C-PACE programs. The report also provides a roadmap to key decision points on the path to setting up a program — the different paths taken and program models employed by those who have blazed the trail. The report is organized into three sections describing the decision points involved, options and considerations, and experience from the field.
Electric distribution system planning is focused on assessing needed physical and operational changes to the local grid to maintain safe, reliable, and affordable service. While electric utilities have always engaged in this activity, the planning horizon has typically been short and involvement by state utility regulators minimal. Safety, reliability, and affordability remain top objectives for deeper state engagement in longer-term distribution system planning. Other drivers are proposed utility investments to replace aging infrastructure and modernize grids, opportunities to improve distribution system efficiency, enabling consumers to have greater control over energy costs and sources, and integrating higher levels of distributed energy resources (DERs) such as rooftop solar, distributed energy storage, and price-responsive demand. This report provides a snapshot of current state engagement in distribution system planning: •Part 1 describes activities in states that have adopted some elements of integrated distribution system planning and analysis (see Figure 1): New York, California, Hawaii, Massachusetts, and Minnesota. It summarizes their impetus for early action, stated goals, regulatory requirements, additional state activities related to distribution system planning, and next steps. •Part 2 covers a broader array of state approaches throughout the country. For example, some of these states have long-standing distribution reliability and performance codes, requiring regulated utilities to report regularly on poor-performing circuits and propose investments for improvements. Other states require regulated utilities to make filings related to proposed grid modernization investments. A growing number of states are beginning to consider comprehensive distribution system planning processes. As this report highlights, approaches vary significantly from state to state, in part stemming from differences in electricity market structure. States can learn from each other and tailor successful approaches to their unique circumstances. Reviewing the broad range of legislative and public utility commission activities described in this report is a useful starting point.
Technological changes in the electric utility industry bring tremendous opportunities and significant challenges. Customers are installing clean sources of on-site generation such as rooftop solar photovoltaic (PV) systems. At the same time, smart appliances and control systems that can communicate with the grid are entering the retail market. Among the opportunities these changes create are a cleaner and more diverse power system, the ability to improve system reliability and system resilience, and the potential for lower total costs. Challenges include integrating these new resources in a way that maintains system reliability, provides an equitable sharing of system costs, and avoids unbalanced impacts on different groups of customers, including those who install distributed energy resources (DERs) and low-income households who may be the least able to afford the transition.
Ensuring that low- and moderate-income (LMI) households have access to energy efficiency is equitable, provides energy savings as a resource to meet energy needs, and can support multiple policy goals, such as affordable energy, job creation, and improved public health. Although the need is great, many LMI households may not be able to afford efficiency improvements or may be inhibited from adopting efficiency for other reasons. Decision-makers across the country are currently exploring the challenges and potential solutions to ramping up adoption of efficiency in LMI households, including the use of financing. The report’s objective is to offer state and local policymakers, state utility regulators, program administrators, financial institutions, consumer advocates and other LMI stakeholders with an understanding of: -The relationship between LMI communities and financing for energy efficiency, including important considerations for its use such as consumer protections -The larger programmatic context of grant-based assistance and other related resources supporting LMI household energy efficiency -Lessons learned from existing energy efficiency financing programs serving LMI households -Financing products used by these programs and their relative advantages and disadvantages in addressing barriers to financing or to energy efficiency uptake for LMI households
Electric utilities today must contain costs at a time when many need to modernize aging systems and all face major changes in technologies, customer preferences and competitive pressures.Most U.S. electric utility facilities are investor-owned, subject to rate and service regulation by state public utility commissions. Regulatory systems under which these utilities operate affect their performance and ability to meet these challenges. In this business environment, multiyear rate plans have some advantages over traditional rate regulation.The report focuses on key design issues and provides case studies of the multiyear rate plan approach, applicable to both vertically integrated and restructured states. Mark Newton Lowry and Matt Makos of Pacific Energy Group Research and Jeff Deason of Berkeley Lab authored the report; Lisa Schwartz, Berkeley Lab, was project manager and technical editor.The report is aimed primarily at state utility regulators and stakeholders in the state regulatory process. The multiyear rate approach also provides ideas on how to streamline oversight of public power utilities and rural electric cooperatives for their governing boards.Two key provisions of multiyear rate plans strengthen cost containment incentives and streamline regulation: 1. Reducing frequency of rate cases, typically to every four or five years 2. Using an attrition relief mechanism to escalate rates or revenue between rate cases to address cost pressures such as inflation and growth in number of customers, independently of the utility’s own cost Better utility performance can be achieved under well-designed multiyear rate plans while achieving lower regulatory costs. Benefits can be shared between utilities and their customers. But plans can be complex and involve significant changes in the regulatory system. Designing plans that stimulate utility performance without undue risk and share benefits fairly can be challenging.This report discusses the rationale for multiyear rate plans and their usefulness under modern business conditions. It then explains critical plan design issues and challenges and presents results from numerical research that considers the extra incentive power achieved under different plan provisions. Next, the report presents several case studies of utilities that have operated under formal multiyear rate plans or, for various reasons, have stayed out of rate cases for more than a decade. These studies consider the effect of multiyear rate plans and rate case frequency on utility cost, reliability and other performance dimensions.
The city of Dubuque, Iowa, aimed for a twofer — lower energy costs for public facilities and reduced air emissions. To achieve that goal, the city partnered with the Iowa Economic Development Authority to establish a revolving loan fund to finance energy efficiency and other energy projects at city facilities. But the city needed to understand approaches for financing energy projects to achieve both of their goals in a manner that would not be considered debt — in this case, obligations booked as a liability on the city’s balance sheet. With funding from the U.S. Department of Energy’s Climate Action Champions Initiative, Lawrence Berkeley National Laboratory (Berkeley Lab) provided technical assistance to the city to identify strategies to achieve these goals. Revolving loans use a source of money to fund initial cost-saving projects, such as energy efficiency investments, then use the repayments and interest from these loans to support subsequent projects. Berkeley Lab and the city examined two approaches to explore whether revolving loans could potentially be treated as non-debt: 1) financing arrangements containing a non-appropriation clause and 2) shared savings agreements. This fact sheet discusses both, including considerations that may factor into their treatment as debt from an accounting perspective.
The electricity grid in the United States is organized around a network of large, centralized power plants and high voltage transmission lines that transport electricity, sometimes over large distances, before it is delivered to the customer through a local distribution grid. This network of centralized generation and high voltage transmission lines is called the “bulk power system.” Costs relating to bulk power generation typically account for more than half of a customer’s electric bill.1 For this reason, the structure and functioning of wholesale electricity markets have major impacts on costs and economic value for consumers, as well as energy security and national security. Diverse arrangements for bulk power wholesale markets have evolved over the last several decades. The Southeast and Western United States outside of California have a “bilateral-based” bulk power system where market participants enter into long-term bilateral agreements — using competitive procurements through power marketers, direct arrangements among utilities or with other generation owners, and auctions and exchanges.
In the last decade, a new policy area has emerged to boost energy efficiency in buildings that focuses on the simple action of measuring energy use as compared to buildings of similar type and size, and making that data publicly available. These efforts, referred to as benchmarking and transparency (B&T) policies, seek to unlock new energy efficiency opportunities in the country’s existing buildings by promoting data-driven decision-making and creating stronger market signals. This report focuses on the 24 state and local jurisdictions that (as of December 31, 2016) require owners of privately owned commercial buildings, multifamily buildings, or both to comply with a B&T policy. The report provides a summary of U.S. B&T policy design and implementation characteristics, reports results and impacts for jurisdictions with B&T policies, and discusses opportunities for increasing the efficacy of B&T policies, as well as suggested areas for further research. Among the findings, all but one of the B&T policy evaluation studies reviewed indicate some reduction (from 1.6% to 14%) in energy use, energy costs, or energy intensity over the two- to four-year period of the analyses. More specifically, most of the studies reviewed indicate 3% to 8% reductions in gross energy consumption or energy use intensity over a two- to four-year period of B&T policy implementation. Two additional evaluation studies indicate that there is a causal relationship between B&T policies and energy savings or energy cost savings. These documented impacts should be reviewed with some caution. While consistently showing energy savings benefits associated with B&T policies, these savings estimates should be considered preliminary because of the limited period of analyses and inconsistencies in analysis methods for the various studies. A nationally standardized method for data collection, reporting, and evaluation of B&T policies—developed with an advisory group of state and local jurisdictions, energy efficiency and evaluation experts, building owner and real estate associations, and other stakeholders—could improve the consistency and quality of B&T impact studies, providing policymakers and others with a more complete understanding of the present and future impacts of these policies.
The program administrator and total cost of saved energy allow comparison of the cost of efficiency across utilities, states, and program types, and can identify potential performance improvements. Comparing program administrator cost with the total cost of saved energy can indicate the degree to which programs leverage investment by participants. Based on reported total costs and savings information for U.S. utility efficiency programs from 2009 to 2013, here we estimate the savings-weighted average total cost of saved electricity across 20 states at 0.046 per kilowatt-hour (kW h), comparing favorably with energy supply costs and retail rates. Programs targeted on the residential market averaged 0.030 per kW h compared to 0.053 per kW h for non-residential programs. Lighting programs, with an average total cost of 0.018 per kW h, drove lower savings costs in the residential market. We provide estimates for the most common program types and find that program administrators and participants on average are splitting the costs of efficiency in half. More consistent, standardized and complete reporting on efficiency programs is needed. Differing definitions and quantification of costs, savings and savings lifetimes pose challenges for comparing program results. Reducing these uncertainties could increase confidence in efficiency as a resource among planners and policymakers.
This report was developed by a team of analysts at Lawrence Berkeley National Laboratory, with Argonne National Laboratory contributing the transportation section, and is a DOE EPSA product and part of a series of “baseline” reports intended to inform the second installment of the Quadrennial Energy Review (QER 1.2). QER 1.2 provides a comprehensive review of the nation’s electricity system and cover the current state and key trends related to the electricity system, including generation, transmission, distribution, grid operations and planning, and end use. The baseline reports provide an overview of elements of the electricity system. This report focuses on end uses, electricity consumption, electric energy efficiency, distributed energy resources (DERs) (such as demand response, distributed generation, and distributed storage), and evaluation, measurement, and verification (EM&V) methods for energy efficiency and DERs.
Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4) transmission and (5) uncertainty and risk management. The analysis draws on a review of recent resource plans for 10 utilities that reflect some of the U.S. electricity industry’s extensive diversity.
Utilities recover costs for providing electric service to retail customers through a combination of rate components that together comprise customers’ monthly electric bills. Rates and rate designs are set by state regulators and vary by jurisdiction, utility and customer class. In addition to the fundamental tenet of setting fair and reasonable rates, rate design balances economic efficiency, equity and fairness, customer satisfaction, utility revenue stability, and customer price and bill stability. At the most basic level, retail electricity bills in the United States typically include a fixed monthly customer charge — a set dollar amount regardless of energy usage — and a volumetric energy charge for each kilowatt-hour consumed. The energy charge may be flat across all hours, vary by usage level (for example, higher rates at higher levels of usage), or vary based on time of consumption. While some utility costs, such as fuel costs, clearly vary according to electricity usage, other costs are “fixed” over the short run — generally, those that do not vary over the course of a year. Depending on your point of view, and whether the state’s electricity industry has been restructured or remains vertically integrated, the set of costs that are “fixed” may be quite limited. Or the set may extend to all capacity costs for generation, transmission and distribution. In the long run, all costs are variable. In the context of flat or declining loads in some regions, utilities are proposing a variety of changes to retail rate designs, particularly for residential customers, to recover fixed costs. In this report, authors representing utility (Chapter 1), consumer (Chapter 2), environmentalist (Chapter 3) and economist (Chapter 4) perspectives discuss fixed costs for electric utilities and set out their principles for recovering those costs. The table on the next page summarizes each author’s relative preferences for various options for fixed cost recovery, some of which may be used in combination. The specific design of any ratemaking option matters crucially, so a general preference for a given option does not indicate support for any particular application.
This guide is designed to provide information to state decision makers and staff on options to advance energy efficiency through strategies designed or implemented at the state and local levels of government and in the private sector.1 The information in this guide is intended to be useful to a wide variety of partners and stakeholders involved in energy-related discussions and decision-making at state and local levels. These energy efficiency options, or “pathways” as they are identified in this guide, can assist states in using energy efficiency to meet air pollution reduction and other policy objectives such as energy affordability and reliability. A pathway is a set of interdependent actions that results in measurable energy savings streams and associated avoided air emissions and other benefits over a period of time. These activities can include state, local, or private sector regulations, policies, programs and other activities. For each of five broad pathways that offer sizable cost-effective energy savings, the guide addresses likely questions policy makers and regulators face when screening for the best opportunities to advance energy efficiency in their state.
Utility customer-supported financing programs are receiving increased attention as a strategy for achieving energy saving goals. Rationales for using utility customer funds to support financing initiatives