Search NASA⌕ Search

Engineering topics

Scire, Elena

Publications and source records attributed to Scire, Elena.

NASA’s Lunar Trailblazer Mission: A Pioneering Small Satellite for Lunar Water and Lunar Geology

Selected in 2019 as a NASA SIMPLEx mission, Lunar Trailblazer is in implementation for flight system delivery at the end of 2022. The mission’s goal is to understand the form, abundance, and distribution of water on the Moon and the lunar water cycle. Lunar Trailblazer also collects data of candidate landing sites to inform planning for future human and robotic exploration of the Moon and evaluate the potential for in situ resource utilization. Lunar Trailblazer’s two science instruments, the High-resolution Volatiles and Minerals Moon Mapper (HVM3) and the Lunar Thermal Mapper (LTM) provide simultaneous high-resolution spectral imaging data to map OH/water, crustal composition, and thermophysical properties from a 100±30 km lunar polar orbit. The ~210-kg flight system deploys from an ESPA Grande and utilizes a ~1000 m/s ΔV hydrazine chemical propulsion system, similar to that employed by GRAIL. Trailblazing elements include the novel state-of-the-art dataset collected at substantially reduced price point, fully geographically co-registered data products delivered to the Planetary Data System, planetary mission team demographics, Caltech campus mission operations, and student staffing of select mission ops roles. Lunar Trailblazer’s pioneering development is providing key lessons learned for future planetary small spacecraft.

Zareh, Shannon↗

Lessons Learned in Extended-Extended Spitzer Space Telescope Operations

The Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.

Lowrance, Patrick↗

Spitzer Operations: Scheduling the Out Years

Spitzer Warm Mission operations have remained robust and exceptionally efficient since the cryogenic mission ended in mid-2009. The distance to the now exceeds 1 AU, making telecommunications increasingly difficult; however, analysis has shown that two-way communication could be maintained through at least 2017 with minimal loss in observing efficiency. The science program continues to emphasize the characterization of exoplanets, time domain studies, and deep surveys, all of which can impose interesting scheduling constraints. Recent changes have significantly improved on-board data compression, which both enables certain high volume observations and reduces Spitzer's demand for competitive Deep Space Network resources.

Spitzer↗