Phasing the Webb Telescope

The James Webb Space Telescope (JWST) is a segmented deployable telescope, currently operating at L2. The telescope utilizes 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). After deployment, the PM segments and the SM arrived in their correct optical positions to within a ~1 mm, with accordingly large wavefront errors. A Wavefront Sensing and Controls (WFSC) process was executed to adjust each of these optical elements in order to correct the deployment errors and produce diffraction-limited images across the entire science field. This paper summarizes the application of the WFSC process.

JWST

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg