Search NASA⌕ Search

Engineering topics

Seidman, David

Publications and source records attributed to Seidman, David.

Studies on the Fundamental Mechanisms of Niobium Electropolishing

To improve the superconducting performance of niobium SRF cavities, electropolishing (EP) with a sulfuric and hydroflouric acid mixture is used. The chemistry of this reaction is complex due to the interactions between diffusion mechanisms, surface oxide structure, and multiple chemical species. Past studies on the EP process have produced a certain set of optimum parameters that have been used successfully for a long time. However, two recent developments have called the efficacy of the existing EP process into question. Since the introduction of nitrogen doping the surface quality of some cavities has been very poor. Also, EP performed at colder than standard temperatures leads to an increase in the cavity performance. To understand these questions, we perform a multivariate study on the EP process using niobium test samples electropolished at different temperatures and potentials. We find that electropolishing at lower potentials leads to rough surface features such as pitting and grain etching. Some of the surface features show similarities to features seen in niobium cavities. The effect of electropolishing temperature is not clear based on the results of this study.

43 PARTICLE ACCELERATORS↗

Improving stability of ALD ZrN thin film coatings over U-Mo dispersion fuel

Atomic layer deposition (ALD) of ZrN is a candidate technology for coating U-Mo dispersion fuel as a diffusion barrier coating. During the early development stages of the coating the ZrN deposition showed to be mechanically unstable and ultimately resulted in spalling. Based on experimental outcomes it was found that instabillity can be eliminated through the introduction of a thin amorphous (a) Al 2 O 3 interlayer coating deposited in between the ~1-μm thick ZrN and the U-Mo. substrate. To elucidate these findings simulations were performed with density functional theory (DFT) to measure work of adhesions at different interfaces while finite element modeling (FEM) was performed to measure the residual stress distribution. DFT indicated that the ZrN coating deposited over (a)-Al 2 O 3 is ~2.5 times stronger when compared to direct deposition over U or UO 2 substrate. While calculations from FEM recognized; (1) large stress concentrations can originate from the irregularly distributed native surface oxides (UO 2 ) over U-Mo and (2) stress concentrations can be reduced if those surface UO 2 can be modified to a uniform layer (achieved after application of a 8 nm (a)-Al 2 O 3 interlayer). These results provided explanations and confirmed the role played by interlayer in eliminating the original mechanical instability of the ZrN.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nb₃Sn at Fermilab: Exploring Performance

Fermilab’s Nb₃Sn coating program produced its first 1.3 GHz single cell cavities in early 2017 and since then has explored the performance of Nb₃Sn on a wide variety of cavity substrates and performed microscopic studies down to atomic resolution. Results to present in this talk include a study of frequency dependence from 650 MHz to 1.3 GHz of BCS resistance, residual resistance, and magnetic flux sensitivity. We show microscopic studies performed in collaboration with Northwestern University’s Materials Science and Engineering Department of limitation mechanisms in Nb₃Sn, including thin film regions and tin segregation at grain boundaries, discussing correlations with RF performance and mechanisms for the formation of these features during growth. Finally, we present results of the first 1.3 GHz 9-cell cavity coated with Nb₃Sn.

43 PARTICLE ACCELERATORS↗

Design and Implementation of the LLRF System for LCLS-II

The SLAC National Accelerator Laboratory is building LCLS-II, a new 4 GeV CW superconducting (SCRF) linac as a major upgrade of the existing LCLS. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded QL of ~ 4 x 10⁷. Each individual RF cavity will be powered by one 3.8 kW solid state amplifier. To ensure optimum field stability a single source single cavity control system has been chosen. It consists of a precision four channel cavity receiver and two RF stations (Forward, Reflected and Drive signals) each controlling two cavities. In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) was modeled and cavity microphonic testing has started. This paper will describe the main system elements as well as test results on LCLS-II cryomodules.

Serrano, Carlos↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗

Status of the CEBAF Energy Upgrade RF Control System

To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).

Hovater, James↗