Engineering topics
Sell, Steven W.
Publications and source records attributed to Sell, Steven W..
Mars Science Laboratory Entry, Descent, and Landing System Overview
In 2012, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems by delivering the largest and most capable rover to date to the surface of Mars. In addition to landing more mass than prior missions to Mars, MSL will offer access to regions of Mars that have been previously unreachable. The MSL EDL sequence is a result of a more stringent requirement set than any of its predecessors. Notable among these requirements is landing a 900 kg rover in a landing ellipse much smaller than that of any previous Mars lander. In meeting these requirements, MSL is extending the limits of the EDL technologies qualified by the Mars Viking, Mars Pathfinder, and Mars Exploration Rover missions. Thus, there are many design challenges that must be solved for the mission to be successful. Several pieces of the EDL design are technological firsts, such as guided entry and precision landing on another planet, as well as the entire Sky Crane maneuver. This paper discusses the MSL EDL architecture and discusses some of the challenges faced in delivering an unprecedented rover payload to the surface of Mars.
Long Cable Deployments During Martian Touchdown: Lessons Learned
The launch of NASA/JPL's next generation Mars rover is planned for the fall of 2011. The landing scheme chosen for this rover represents a step forward in unmanned payload delivery. The rover will be lowered from a rocket powered descent stage and then placed onto the surface while hanging from three bridles. During this touchdown event, the communication between the rover and descent stage is maintained by an electrical umbilical cable which is deployed in parallel with the structural bridles. During the development of the deployment device for the electrical umbilical, many obstacles were identified and overcome. Many of these challenges were due in large part to the helical nature of the packing geometry of the umbilical cable. And although none of these issues resulted in the failure of the design, they increased both development and assembly time. Many of the issues and some of the benefits of a helical deployment were not immediately apparent during the trade studies carried out during the deployment selection process. Tests were conducted upon completion of the device in order to characterize both the deployment and separation characteristics of the cable. Extraction loads were needed for inputs to touchdown models and separation dynamics were required to assess cable-rover recontact risk. Understanding the pros and cons surrounding the deployment of a helically packed cable would most certainly influence the outcome of future trade studies surrounding the selection of cable deployment options.
Mars Science Laboratory Entry, Descent, and Landing System Overview
In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems by delivering the largest and most capable rover to date to the surface of Mars. In addition to landing more mass than prior missions to Mars, MSL will offer access to regions of Mars that have been previously unreachable. The MSL EDL sequence is a result of a more stringent requirement set than any of its predecessors. Notable among these requirements is landing a 900 kg rover in a landing ellipse much smaller than that of any previous Mars lander. In meeting these requirements, MSL is extending the limits of the EDL technologies qualified by the Mars Viking, Mars Pathfinder, and Mars Exploration Rover missions.