Search NASASearch

Engineering topics

Shafer, Michael W.

Publications and source records attributed to Shafer, Michael W..

Umbilical Deployment Device

The landing scheme for NASA's next-generation Mars rover will encompass a novel landing technique (see figure). The rover will be lowered from a rocket-powered descent stage and then placed onto the surface while hanging from three bridles. Communication between the rover and descent stage will be maintained through an electrical umbilical cable, which will be deployed in parallel with structural bridles. The -inch (13-mm) umbilical cable contains a Kevlar rope core, around which wires are wrapped to create a cable. This cable is helically coiled between two concentric truncated cones. It is deployed by pulling one end of the cable from the cone. A retractable mechanism maintains tension on the cable after deployment. A break-tie tethers the umbilical end attached to the rover even after the cable is cut after touchdown. This break-tie allows the descent stage to develop some velocity away from the rover prior to the cable releasing from the rover deck, then breaks away once the cable is fully extended. The descent stage pulls the cable up so that recontact is not made. The packaging and deployment technique can store a long length of cable in a relatively small volume while maintaining compliance with the minimum bend radius requirement for the cable being deployed. While the packaging technique could be implemented without the use of break-ties, they were needed in this design due to the vibratory environment and the retraction required by the cable. The break-ties used created a series of load-spikes in the deployment signature. The load spikes during the deployment of the initial three coils of umbilical showed no increase between the different temperature trials. The cold deployment did show an increased load requirement for cable extraction in the region where no break-ties were used. This increase in cable drag was superimposed on the loads required to rupture the last set of break-ties, and as such, these loads saw significant increase when compared to their ambient counterparts. While the loads showed spikes of high magnitude, they were of short duration. Because of this, neither the deployment of the rover, nor the motion of the descent stage, would be adversely affected. In addition, the umbilical was found to have a maximum of 1.2 percent chance for recontact with the ultra-high frequency antenna due to the large margin of safety built in.

Shafer, Michael W.

Long Cable Deployments During Martian Touchdown: Lessons Learned

The launch of NASA/JPL's next generation Mars rover is planned for the fall of 2011. The landing scheme chosen for this rover represents a step forward in unmanned payload delivery. The rover will be lowered from a rocket powered descent stage and then placed onto the surface while hanging from three bridles. During this touchdown event, the communication between the rover and descent stage is maintained by an electrical umbilical cable which is deployed in parallel with the structural bridles. During the development of the deployment device for the electrical umbilical, many obstacles were identified and overcome. Many of these challenges were due in large part to the helical nature of the packing geometry of the umbilical cable. And although none of these issues resulted in the failure of the design, they increased both development and assembly time. Many of the issues and some of the benefits of a helical deployment were not immediately apparent during the trade studies carried out during the deployment selection process. Tests were conducted upon completion of the device in order to characterize both the deployment and separation characteristics of the cable. Extraction loads were needed for inputs to touchdown models and separation dynamics were required to assess cable-rover recontact risk. Understanding the pros and cons surrounding the deployment of a helically packed cable would most certainly influence the outcome of future trade studies surrounding the selection of cable deployment options.

Mars Science Lab