Shunt-Connected FACTS and Synchronous Condensers

In recent years, the electric-transmission system has undergone a significant transformation marked by a greater integration of renewable-energy sources like wind and solar, the phasing out of thermal generation plants, and a concerted effort towards electrifying energy consumption. To keep pace with the integration of renewable-energy sources and the escalating demands of industries and households, it is imperative to expand and modernize the existing power infrastructure. These upgrades are essential to maintain grid stability, enhance power delivery, and boost overall efficiency of the system. However, challenges have emerged with the growing complexity of power grids, particularly in the realms of voltage control, transient stability, and power-quality management.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Variable Transmission Line Ratings

This paper outlines the concept of variable-transmission facility ratings. This topic is of heightened importance following the recent Federal Energy Regulatory Commission (FERC) Order No. 881 which requires the implementation of ambient adjusted ratings (AARs) for FERC jurisdictional portions of the transmission system. Additionally, FERC issued an Advanced Notice of Proposed Rulemaking (ANOPR) implying a future order on Dynamic Line Rating (DLR) requirements. The various types of facility-rating methodologies will be discussed with a focus on how they can benefit the stability, capacity, and reliability of the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Framework for Addressing Hydropower Modeling Gaps in Electric Grid Planning and Operational Studies [Slides]

Realistic representation of hydropower in power system planning and operation studies is extremely important as it helps in avoiding under/over-estimation of the services the hydro power units can provide. A framework and tools have been developed to account for hydrological conditions and modify power system models accordingly. For example, HyDat – data and AI driven platform, that provides that data required for editing the power system model files Collaborative effort with V&R Energy. Also, development of POM based tools have been performed, a) Tool1: editing .raw files with realistic current and maximum hydrogeneration and redispatch of other units, and b) Tool2: Editing .dyr files to represent water head, current and maximum generation. Finally the framework, HASP framework combines HyDat and V&R energy tools to produce modified power system model files. Key Take-away points from contingency analysis studies include a) the number of critical contingencies increases as the water levels are reduced (70%>75%>80%), and b) both the extent and the quality of dynamic response of the Hydropower unit is different with varying water head levels.

13 HYDRO ENERGY↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bulk Power System Flow Control

On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Voltage Optimization

Voltage optimization refers to a volt-var optimization technique which was originally designed to minimize energy consumption and improve end-use efficiency on the distribution system. This reduces source voltage at a substation, which lowers generation demand, reduces system losses, and improves system stability. This has been the conventional implementation of voltage optimization: focusing on regulation of voltages throughout the distribution system via coordinated adjustments of load tap changers, line-voltage regulators, switched shunt compensation, and the targeted placement of new shunt compensation. These methods have received increased focus following a growth in distributed-energy resources (DERs) interconnecting at the distribution level, given their developing capability to participate in voltage regulation. This is paired with the intermittency challenges they pose, load imbalances, and voltage fluctuations. Voltage optimization has long been an area of extensive research within the distribution system, with various strategies and philosophies demonstrating a range of effects. The conventional focus on the distribution system owes to the typical operation of transmission systems, which assumes firm local resources and flows strictly from generation resources to loads. The strategies employed in distribution have also been optimized for this typically radial configuration and operation of the distribution system.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Open Source High Fidelity Modeling of a Type-5 Wind Turbine Drivetrain

The increasing integration of renewable energy resources in evolving bulk power system (BPS) is impacting the system inertia. Type-5 wind turbine generation has the potential to behave like a traditional synchronous generator and can help mitigate the impact on system inertia. A hydraulic torque converter (TC) and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine unit. A high fidelity model of Type-5 wind turbine drivetrain is not openly and widely available for grid integration and transient stability studies. This hinders appropriate assessment of Type-5 wind power plant’s contribution to bulk grid resilience. This work develops and validates a TC model based on those generally used in automobile’s transmission system. Moreover, the concept of torsional coupling is leveraged to integrate the TC and gearbox system dynamics. The entire integrated model will be open sourced and publicly available for grid integration studies.

17 WIND ENERGY↗

Enhancing Local Grid Resilience with Small Hydropower Hybrids: Proving the concept through demonstration, simulation, and analysis with Idaho Falls Power

Large hydropower, connected to the transmission system and typically possessing significant ability to balance grid frequency, has long been central to black start plans in regions where it is present. Small hydropower possesses most of the attributes required for black start but is often connected to distribution or sub-transmission systems and has less ability to balance grid frequency. Integrating energy storage such as batteries or ultracapacitors increases the combined asset’s ability to balance frequency. This asset integration enables a bottom-up grid restoration paradigm in which critical electric loads on the local distribution system can be powered even when the regional transmission system is down. This report presents a field demonstration conducted with Idaho Falls Power that proved this concept. The contribution of energy storage in restoring the small hydro-dominated distribution grid and its operational sensitivity across different control settings are further analyzed using high-fidelity simulations. Readers will learn about technical details on the field demonstration setup, energy storage contribution to black start, detailed simulation steps of islanded distribution grid restoration, and usage of field demonstration measurements for transient model refinements. Collectively this report points to a great opportunity for small hydropower to enhance resilience of local electric grids.

13 HYDRO ENERGY↗

Revenue prediction for integrated renewable energy and energy storage system using machine learning techniques

Revenue estimation for integrated renewable energy and energy storage systems is important to support plant owners or operators’ decisions in battery sizing selection that leads to maximized financial performances. A common approach to optimizing revenues of a hybrid hydro and energy storage system is using mixed-integer linear programming (MILP). Although MILP models can provide accurate production cost estimations, they are typically very computationally expensive. To provide a fast yet accurate first-step information to hydropower plant owners or operators who consider integrating energy storage systems, we propose an innovative approach to predicting optimal revenues of an integrated energy generation and storage system. In this study, we examined the performance of two prediction techniques: Generalized Additive Models (GAMs) and machine learning (ML) models developed based on artificial neural networks (ANN). Predictive equations and models are generated based on optimized solutions from a market participation optimization model, the Conventional Hydropower Energy and Environmental Resource System (CHEERS) model. The two predicting techniques reduce the computational time to evaluate annual revenue for one set of battery configurations from 3 h to 1 to 4 min per run while also being implementable with significantly less data. The model validation prediction errors of developed GAMs and ML models are generally below 5%; for model testing predictions, the ML models consistently outperform the regression equations in terms of root mean square errors. This new approach allows plant owners, operators, or potential investors to quickly access multiple battery configurations under different energy generation and market scenarios. This new revenue prediction method will therefore help reduce the barriers, and thereby promoting the deployment of battery hybridization with existing renewable energy sources.

13 HYDRO ENERGY↗

Power and Communications Hardware-in-the-Loop CPS Architecture and Platform for DER Monitoring and Control Applications: Preprint

The rapid growth of distributed energy resources (DERs) has prompted increasing interest in the monitoring and control of DERs through hybrid smart grid communications. The deployment of communications and computation has transformed the traditional physical power grid into a smart cyber-physical system (CPS). To fully understand the interdependency between physical grid and cyber netowrks, this study designed a power and communications hardware-in-the-loop (PCommHIL) CPS architecture, which enables the flexible verification of DER monitoring and control with hybrid communications architectures and Internet protocols. Design, development and case study of a PCommHIL testbed for the DER coordination are discussed in detail, and the proposed platform integrates DER devices, Advanced Metering Infrastructures (AMIs), and a suite of hybrid communications networks for distribution automation applications. Case study on DER situational awareness and Volt-Var control validates the efficacy of this proposed PCommHIL platform with hybrid communications designs. Results show that the HAN communication technologies play a critical role in hybrid designs and it is the bottleneck for DER applications. High performance communication technologies are highly recommended to be applied in the HAN for enhanced monitoring and real-time control of DERs.

AMIs↗

Idaho Falls Power Black Start Field Demonstration (Preliminary Outcomes Paper)

This April 2021 field demonstration builds upon a 2017 field demonstration in which it was determined IFP’s HPPs, on their own, can support islanded black start and operation up to 2.5 MW loading. Modeling and hardware-in-the-loop testing was used in the intervening period to design an energy storage solution, specifically using ultracapacitors, to reduce likelihood of generators tripping during the field demonstration. Overall, the 2021 field demonstration tested three different options for meeting IFP’s requirements: innovating the hydropower controls, synchronizing multiple HPPs on the system, and integrating an ultracapacitor energy storage system. This report documents the testing performed. Follow-on analysis will provide additional insights, for example, including a complete table of comparative results between the tests and scenarios. The analysis will also propose a refined design for an energy storage system to meet IFP’s grid islanded needs.