Search NASA⌕ Search

Engineering topics

Shaftan, T

Publications and source records attributed to Shaftan, T.

PHYSICS RESULTS OF THE NSLS-II LINAC FRONT END TEST STAND

The Linac Front End Test Stand (LFETS) was installed at the Source Development Laboratory (SDL) in the fall of 2011 in order to test the Linac Front End. The goal of these tests was to test the electron source against the specifications of the linac. In this report, we discuss the results of these measurements and the effect on linac performance.

43 PARTICLE ACCELERATORS↗

NSLS-II Transport Line Progress

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

3-GeV↗

Short pulse generation by laser slicing at NSLSII

We discuss an upgrade R&D project for NSLSII to generate sub-pico-second short x-ray pulses using laser slicing. We discuss its basic parameters and present a specific example for a viable design and its performance. Since the installation of the laser slicing system into the storage ring will break the symmetry of the lattice, we demonstrate it is possible to recover the dynamical aperture to the original design goal of the ring. There is a rapid growth of ultrafast user community interested in science using sub-pico-second x-ray pulses. In BNL's Short Pulse Workshop, the discussion from users shows clearly the need for a sub-pico-second pulse source using laser slicing method. In the proposal submitted following this workshop, NSLS team proposed both hard x-ray and soft x-ray beamlines using laser slicing pulses. Hence there is clearly a need to consider the R&D efforts of laser slicing short pulse generation at NSLSII to meet these goals.

43 PARTICLE ACCELERATORS↗

MODULATION OF LOW ENERGY BEAM TO GENERATE PREDEFINED BUNCH TRAINS FOR THE NSLS-II TOP-OFF INJECTION

The NSLS II linac will produce a bunch train, 80-150 bunches long with 2 ns bunch spacing. Having the ability to tailor the bunch train can lead to the smaller bunch to bunch charge variation in the storage ring. A stripline is planned to integrate into the linac baseline to achieve this tailoring. The stripline must have a fast field rise and fall time to tailor each bunch. The beam dynamics is minimally affected by including the extra space for the stripline. This paper discusses the linac beam dynamics with stripline, and the optimal design of the stripline. A stripline is to be integrated in the linac to match the storage ring uniform bunch charge requirement, which simplifies the gun pulser electronics and looses the edge uniform requirement. It is located at low energy to lower the stripline power supply requirement and limit the dumped electron radiation. By turning off the stripline, the beam dynamics through linac is comparable with the baseline design. More advanced ideas can be explored. If a DC corrector along with the stripline is used, the core bunch trains gets kick from the stripline while the head and the tail of bunch train just gets a DC kick. The stripline power supply waveform is a single flat top waveform with fast rise and drop and the pulse length is {approx}200 ns long or 100 bunches, which may be easier from the power supply view point. We are also considering the bunch by bunch charge manipulation to match the storage ring uniform bunch charge distribution requirement. By modulating the flat top waveform at 250 MHz with adjustable amplitude, each the bunch center is either at 45 degree or 135 degree. Only the head or tail of the bunch is trimmed out. Although each bunch center deviation from idea center is very different at low energy, it is gradually minimized with beam energy increase.

43 PARTICLE ACCELERATORS↗

IMPLEMENTATION OF A DC BUMP AT THE STORAGE RING INJECTION STRAIGHT SECTION

The NSLS II beam injection works with a DC septum, a pulsed septum and four fast kicker magnets. The kicker power supplies each produce a two revolution period pulsed field, 5.2 {micro}s half sine waveform, using {approx}5kA drive voltage. The corresponding close orbit bump amplitude is {approx}15mm. It is desired that the bump is transparent to the users for top-off injection. However, high voltage and short pulse power supplies have challenges to maintain pulse-to-pulse stability and magnet-to-magnet reproducibility. To minimize these issues, we propose implementing a DC local bump on top of the fast bump to reduce the fast kicker strength by a factor of 2/3. This bump uses two storage ring corrector magnets plus one additional magnet at the septum to create a local bump. Additionally, these magnets could provide a DC bump to simulate the septum position effects on the store beam lifetime. This paper presents the detail design of this DC injection bump and related beam dynamics.

43 PARTICLE ACCELERATORS↗

Design of the NSLS-II Linac Front End Test Stand

The NSLS-II operational parameters place very stringent requirements on the injection system. Among these are the charge per bunch train at low emittance that is required from the linac along with the uniformity of the charge per bunch along the train. The NSLS-II linac is a 200 MeV linac produced by Research Instruments Gmbh. Part of the strategy for understanding to operation of the injectors is to test the front end of the linac prior to its installation in the facility. The linac front end consists of a 100 kV electron gun, 500 MHz subharmonic prebuncher, focusing solenoids and a suite of diagnostics. The diagnostics in the front end need to be supplemented with an additional suite of diagnostics to fully characterize the beam. In this paper we discuss the design of a test stand to measure the various properties of the beam generated from this section. In particular, the test stand will measure the charge, transverse emittance, energy, energy spread, and bunching performance of the linac front end under all operating conditions of the front end.

43 PARTICLE ACCELERATORS↗

PERFORMANCE OF THE DIAGNOSTICS FOR NSLS-II LINAC COMMISSIONING

The National Synchrotron Light Source II (NSLS-II) is a state of the art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The transfer lines not only provide a means to deliver the beam from one machine to another, they also provide a suite of diagnostics and utilities to measure the properties of the beam to be delivered. In this paper we discuss the suite of diagnostics that will be used to commission the NSLS-II linac and measure the beam properties. The linac to booster transfer line can measure the linac emittance with a three screens measurement or a quadrupole scan. Energy and energy spread are measured in a dispersive section. Total charge and charge uniformity are measured with wall current monitors in the linac and transformers in the transfer line. We show that the performance of the diagnostics in the transfer line will be sufficient to ensure the linac meets its specifications and provides a means of trouble shooting and studying the linac in future operation.

200 MeV linac↗

SIMULATIONS OF TRANSVERSE STACKING IN THE NSLS-II BOOSTER

The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster. The linac needs to deliver 15 nC in 80 - 150 bunches to the booster every minute to achieve current stability goals in the storage ring. This is a very stringent requirement that has not been demonstrated at an operating light source. We have developed a scheme to transversely stack two bunch trains in the NSLS-II booster in order to alleviate the charge requirements on the linac. This scheme has been outlined previously. In this paper we show particle tracking simulations of the tracking scheme. We show simulations of the booster ramp with a stacked beam for a variety of lattice errors and injected beam parameters. In all cases the performance of the proposed stacking method is sufficient to reduce the required charge from the linac. For this reason the injection system of the NSLS-II booster is being designed to include this feature. The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster. The injectors must provide 7.5nC in bunch trains 80-150 bunches long every minute for top off operation of the storage ring. Top off then requires that the linac deliver 15nC of charge once losses in the injector chain are taken into consideration. This is a very stringent requirement that has not been demonstrated at an operating light source. For this reason we have developed a method to transversely stack two bunch trains in the booster while maintaining the charge transport efficiency. This stacking scheme has been discussed previously. In this paper we show the simulations of the booster ramp with a single bunch train in the booster. Then we give a brief overview of the stacking scheme. Following, we show the results of stacking two bunch trains in the booster with varying beam emittances and train separations. The behavior of the beam through the ramp is examined showing that it is possible to stack two bunch trains in the booster.

43 PARTICLE ACCELERATORS↗

PROGRESS WITH NSLS-II INJECTION STRAIGHT SECTION DESIGN

The NSLS-II injection straight section (SR) consists of pulsed and DC bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices. Prior to selecting the current 'conventional' design of the injection straight section we analyzed an option of injection via pulsed multipole pioneered at PF-AR. We found that this promising approach was not suited to the NSLS-II storage ring optics, since it would require a impractically compact arrangement of the injection straight section components and a complex modification of the transport line optics due to the strong focusing of the injected beam passing off the pulsed multipole axis. In addition, the requirement for a small injection transient of the stored beam orbit severely constrains the vertical alignment tolerance of the pulsed multipole. The design of the NSLS-II injection straight section is now completed with exception of transition chamber details, which will be adjusted to accommodate the actual layouts of the pulsed magnets.

43 PARTICLE ACCELERATORS↗

NSLS-II Beam Diagnostics Overview

A new 3rd generation light source (NSLS-II) is in the early stages of construction at Brookhaven National Laboratory. The NSLS-II facility will provide ultra high brightness and flux with exceptional beam stability. It presents several challenges for diagnostics and instrumentation, related to the extremely small emittance. In this paper, we present an overview of all planned instrumentation systems, results from research and development activities; and then focus on other challenging aspects.

43 PARTICLE ACCELERATORS↗

NSLS-II Booster Acceptance Studies

The NSLS-II is a state of the art 3 GeV synchrotron light source being developed at BNL. The injection system will consist of a 200 MeV linac and a 3 GeV booster synchrotron. The injection system must supply 7.3 nC every minute to satisfy the top off requirements. A large booster acceptance is necessary to have a high booster injection efficiency and alleviate the requirements on the linac gun. We also anticipate transverse stacking of bunches in the booster to increase the amount of charge that can be delivered. We present studies of the anticipated booster stay clear and the ramifications for injection efficiency and transverse stacking.

43 PARTICLE ACCELERATORS↗

Beam Transport and Diagnostics for the NSLS-II Injection System

The NSLS-II is a state of the art 3 GeV synchrotron light source being developed at BNL. The injection system will consist of a 200 MeV linac, 3 GeV booster synchrotron, and associated transfer lines. The transport lines between the linac and booster (LtB) and the booster and storage ring (BSR) must satisfy a number of requirements. In addition to transporting the beam while maintaining the beam emittance, these lines must allow for commissioning, provide appropriate diagnostics, allow for the appropriate safety devices and in the case of the BSR line, provide a stable beam for top off injection. Appropriate diagnostics are also necessary in the linac and booster to complement the measurements in the transfer lines and to allow for fast commissioning. In this paper we discuss the design of the transfer lines for the NSLSII along with the incorporated diagnostics and safety systems. Necessary diagnostics in the linac and booster are also discussed.

43 PARTICLE ACCELERATORS↗

Alternative Designs for the NSLS-II Injection Straight Section

Brookhaven National Laboratory (BNL) is developing a state-of-the-art 3 GeV synchrotron light source, the NSLS-II [1]. The 9.3 meter-long injection straight section of its storage ring now fits a conventional injection set-up consisting of four kickers producing a closed bump, together with a DC septum and a pulsed septum. In this paper, we analyze an alternative option based on injection via a pulsed sextupole magnet. We discuss the dynamics of the injected and stored beams and, subsequently, the magnet's specifications and tolerances. We conclude by summarized the advantages and drawbacks of each injection scheme.

43 PARTICLE ACCELERATORS↗

Top-Off Safety Analysis for NSLS-II

Top-off injection will be adopted in NSLS-II. To ensure no injected beam can pass into experimental beamlines with open photon shutters during top-off injection, simulation studies for possible machine fault scenarios are required. We compare two available simulation methods, backward (H. Nishimura-LBL) and forward tracking (A. Terebilo-SLAC). We also discuss the tracking settings, fault scenarios, apertures and interlocks considered in the analysis.

43 PARTICLE ACCELERATORS↗

Beam Based Calibration of Slow Orbit Bump in the NSLS Booster

The orbit bumps in NSLS booster are used to move the beam orbit within 2mm of the extraction septum aperture on a time scale of millisecond at extraction in order to reduce the requirement on the amplitude of the fast extraction kicker. This may cause charge losses since before extraction, the beam stays on the distorted orbit for thousands of revolutions. In order to find the optimal orbit bump setpoint, which brings the maximum distortion at the extraction position and minimum distortions everywhere else, we developed an extraction model and performed an experiment to validate it. Afterwards, the model was applied to optimize the extraction process.

43 PARTICLE ACCELERATORS↗