Search NASA⌕ Search

Engineering topics

Shah, Chinmay

Publications and source records attributed to Shah, Chinmay.

Distributed ADMM Using Private Blockchain for Power Flow Optimization in Distribution Network With Coupled and Mixed-Integer Constraints

The optimization problem for scheduling distributed energy resources (DERs) and battery energy storage systems (BESS) integrated with the power grid is important to minimize energy consumption from conventional sources in response to demand. Conventionally this optimization problem is solved in a centralized manner, limiting the size of the problem that can be solved and creating a high communication overhead because all the data is transferred to the central controller. These limitations are addressed by the proposed distributed consensus-based alternating direction method of multiplier (DC-ADMM) optimization algorithm, which decomposes the optimization problem into subproblems with private cost function and constraints. The distribution feeder is partitioned into low coupling subnetworks/regions, which solves the private subproblem locally and exchanges information with the neighboring regions to reach consensus. The relaxation strategy is employed for mixed-integer and coupled constraints introduced in the optimal power flow (OPF) problem by stationary and transportable BESS because DC-ADMM convergence is only guaranteed for strict convex problems. The information exchange and synchronization between subnetworks/regions are vital for distributed optimization. In this work, both of these aspects are addressed by the blockchain. The smart contract deployed on the blockchain network acts as a mediator for secure data exchange and synchronization in distributed computation. The blockchain-based distributed optimization problem’s effectiveness is tested for a 0.5-MW laboratory microgrid for one hour ahead and day-ahead for the IEEE 123-bus and EPRI J1 test feeders, and results are compared with a centralized solution.

25 ENERGY STORAGE↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗