U.S. Hydropower Market Report (January 2021 edition)

This is the third complete edition of the U.S. Hydropower Market Report (the first two were the 2014 and 2017 Hydropower Market Report published in 2015 and 2018, respectively). In intervening years between publishing the full report, updated data are also summarized and released, and can be found at the Oak Ridge National Lab (ORNL) HydroSource website. This report combines data from public and commercial sources as well as research findings from other Department of Energy (DOE) R&D projects in order to provide a comprehensive picture of developments in the U.S. hydropower and PSH fleet and industry trends. Prior to the first Market Report being published, there was a noted lack of publicly available and easily accessible information about hydropower in the United States and other important trends affecting this important sector of the energy industry. New and valuable types of information are constantly being developed in the course of DOE research activities and, in a rapidly evolving energy industry, it is important that these data be made available in a predictable and consistent manner for use by all different types of stakeholders and decision-makers.The report highlights developments in 2017–2019 (the years for which new data has become available since the publication of the 2017 Hydropower Market Report), and contextualizes this information compared to evolving high-level trends over the past 10–20 years. Apart from presenting trends over time, the report discusses differences in those trends by region, plant size, owner type, or other attributes.

13 HYDRO ENERGY↗

U.S. Hydropower Market Report

The January 2021 edition of the U.S. Hydropower Market Report is the third complete edition of this report (the first two were the 2014 and 2017 Hydropower Market Report published in 2015 and 2018, respectively). In intervening years between publishing the full report, updated data are also summarized and released, and can be found at the Oak Ridge National Lab (ORNL) HydroSource website. This report combines data from public and commercial sources, as well as research findings from other U.S. Department of Energy (DOE) R&D projects to provide a comprehensive picture of developments in the U.S. hydropower and pumped-storage hydropower fleet and industry trends. The report highlights developments in 2017–2019 (the years for which new data has become available since the publication of the 2017 Hydropower Market Report), and contextualizes this information compared to evolving high-level trends over the past 10–20 years. Apart from presenting trends over time, the report discusses differences in those trends by region, plant size, owner type, or other attributes.

13 HYDRO ENERGY↗

Challenges in the post-licensing stage of U.S. hydropower development: Current status and some potential solutions

The issuance of a Federal Energy Regulatory Commission (FERC) license is an important milestone in the development process of new U.S. hydropower projects. The complexity and uncertain timeline of the licensing process have been often cited as a key deterrent to new hydropower installations in the United States. However, very little attention has been paid to post-licensing timelines and attrition rates. This article explores the challenges faced by developers in bringing their FERC-licensed hydropower projects to the construction stage. Post-licensing activities to be completed before starting construction include obtaining additional permitting from other federal or state agencies, completing the technical design, securing financing, and in most cases, negotiating a power purchase agreement. For the set of projects that obtained a FERC license between 2007 and 2018, we assembled a dataset—combining information from FERC dockets and responses from a questionnaire to developers—to calculate attrition rates and development timelines and to examine the reasons for delays and cancellations.

13 HYDRO ENERGY↗

Complementary relationship between small-hydropower and increasing penetration of solar photovoltaics: Evidence from CAISO

To achieve the 100% green electricity goal, we need to understand the relationship between resources in the market and identify the flexible clean resources (i.e., hydropower) to integrate power from wind and photovoltaic (PV). This paper reveals a complementary relationship between small hydropower plants and solar PVs in the California Independent System Operator (CAISO) based on the system-wide hourly generation data from 2013 to 2017. When the solar PV increases its portion in the generation mix by 1%, small hydro will increase its portion by 0.01–0.06%. Such response is obvious in the net demand peak hours, both morning and evening. The low operation cost, flexibility, and dispatchability of small hydro in CAISO explain this complementarity. Due to its benefit in emission and low Levelized Cost of Electricity (LCOE), it is suggested to consider more small hydro projects to accommodate additional PV capacity for the 100% green electricity goal. Our estimation indicates that the current feasible potential of small hydro is sufficient, if the relation stays the same over years. If developers can mitigate the environmental impact, more technical potential will become feasible. Thus, small hydro could integrate more solar PV and reduce the demand for natural gas plants and batteries.

13 HYDRO ENERGY↗