Search NASA⌕ Search

Engineering topics

Sharma, Priyanka

Publications and source records attributed to Sharma, Priyanka.

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Operations Concept for responding to Urgent Requests for NASA-ISRO Synthetic Aperture Radar (NISAR)

This mission is a collaboration between the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organization (ISRO). This spacecraft will carry two instruments that will operate at radar wavelengths (L and S band) and will provide data for understanding changes in the Earth’s land surface. The scientific data from this mission will revolutionize our understanding of the causes and consequences of land surface changes on Earth.

Hammer, Brian↗

Operations Concept for Responding to Urgent Requests for NASA-ISRO Synthetic Aperture Radar (NISAR)

The NASA-ISRO Synthetic Aperture Radar, or NISAR, mission is an Earth-mapping radar observatory to be launched from Sriharikota (India) in 2022. This mission is a collaboration between the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organization (ISRO). This spacecraft will carry two instruments that will operate at radar wavelengths (L and Sband) and will provide data for understanding changes in the Earth’s land surface. The scientific data from this mission will revolutionize our understanding of the causes and consequences of land surface changes on Earth, ranging from Solid Earth Deformation in the form of natural hazards like earthquakes, volcanic eruptions and landslides, to ecosystem disturbances, to changes in the cryosphere (measurements of polar ice caps, ice sheets and sea ice). A nominal Reference Observation Plan, that repeats roughly every 12-24 days, developed prior to launch by the NISAR Mission Planning team, in consultation with the Science Team, will form the basis of science data collection by the payload instruments onboard the NISAR observatory after launch. Scheduling of science observations for the mission requires accounting for limited spacecraft resources like onboard data storage, downlink capacity, energy/power, thermal limits and instrument duty cycles. In addition to nominal science data collection, the project has a Level 1 requirement to respond to requests for urgent data acquisition over disaster sites (natural or anthropogenic) by scheduling new acquisitions within 24 hrs of notification and delivering science data within 5 hours of data acquisition. This capability is to be exercised on a ‘best-efforts basis’. While the definition of what constitutes an ‘urgent request’, and how such requests would be submitted to the project, is within the domain of the Science Team, the Mission System team is responsible for developing the baseline operations concept and implementation approach for responding to such requests. Given the ‘best-efforts’ nature of this requirement, a few highlevel guidelines have been developed to help guide the formulation of the operations concept, and are presented in this paper. Requests for urgent response data will be accommodated following the guiding principle of minimal to no impact on nominal science and planned engineering activities. No change in satellite orbit or attitude will be made for urgent response. Restricting response approaches to only changing the downlink and/or ground processing priority for existing observations, and adding new observations only in areas where NISAR will not be nominally imaging, allows for minimal impact on the Reference science Observation Plan. No instrument mode changes will be allowed for urgent response (except for high-priority requests), and no new observations that impact either planned science or engineering activities will be scheduled. Additionally, data requests must fit within the available project resource margins (both spacecraft and ground resources are to be evaluated). Both JPL and ISRO will be involved at various steps of the implementation, irrespective of whether the urgent request is for L-SAR (NASA instrument) or S-SAR (ISRO instrument) or a joint dataset.

Sharma, Priyanka↗