Search NASA⌕ Search

Engineering topics

Shay, Richard F.

Publications and source records attributed to Shay, Richard F..

Air Traffic Management Technology Demostration-1 (ATD-1) Avionics Phase 2 Flight Test and Results

NASA’s first Air Traffic Management Technology Demonstration (ATD-1) subproject successfully completed 19 days of flight test validation in January and February 2017 of an Interval Management (IM) avionics prototype and the procedures used to conduct IM arrival and approach operations. IM is one of the three elements integrated into NASA’s ATD-1 concept of operations with the subproject goal of improving aircraft efficiency and airport throughput during high-density arrival operations. The ATD-1 concept of operations combines advanced arrival scheduling, controller decision support tools, and interval management (IM) avionics to enable merging of multiple, time-based, efficient arrival streams. IM contributes to the operation by calculating speeds that enable an aircraft to precisely achieve a specific time or distance behind another aircraft. When precise spacing intervals can be calculated, achieved, and then maintained during high-density operations, aircraft efficiency should be improved by enabling the aircraft to remain closer to the optimum descent trajectory instead of using vectors and step-down altitudes, and airport throughput should be maintained or improved by each aircraft arriving at the runway threshold closer to the assigned spacing interval. This avionics development and flight test was conducted under a NASA contract by Boeing Research and Technology, with Boeing Commercial Aircraft, Honeywell, United Airlines, and Jeppesen as sub-contractors. The Honeywell built IM avionics were the first ever prototype built based on NASA requirements as well as developing and non-flight tested international IM standards, integrated into two test aircraft, and then flown in real-world conditions at the Grant County International Airport (KMWH). The IM prototype flown in the flight test used data from the Ownship and the assigned lead, or Target, aircraft to calculate the airspeed necessary for the Ownship to achieve the desired spacing. The flight test demonstrated that the IM avionics prototype generally met the IM requirement for spacing accuracy. However, the control laws implemented require further development to reduce the high IM speed command rate and the number of speed reversals observed during the test. Pilots assessed the IM procedure as acceptable, and issues requiring further attention were identified. In summary, the IM avionics prototype showed significant promise in contributing to the goals of improving aircraft efficiency and airport throughput. The flight test results also provided important data to the FAA and the working group developing the follow-on version of the international IM standards.

Baxley, Brian T.↗

Flight Crew Survey Responses from the Interval Management (IM) Avionics Phase 2 Flight Test

The Interval Management (IM) Avionics Phase 2 flight test used three aircraft over a nineteen day period to operationally evaluate a prototype IM avionics. Quantitative data were collected on aircraft state data and IM spacing algorithm performance, and qualitative data were collected through end-of-scenario and end-of-day flight crew surveys. The majority of the IM operations met the performance goals established for spacing accuracy at the Achieve-by Point and the Planned Termination Point, however there were operations that did not meet goals for a variety of reasons. While the positive spacing accuracy results demonstrate the prototype IM avionics can contribute to the overall air traffic goal, critical issues were also identified that need to be addressed to enhance IM performance. The first category was those issues that impacted the conduct and results of the flight test, but are not part of the IM concept or procedures. These included the design of arrival and approach procedures was not ideal to support speed as the primary control mechanism, the ground-side of the Air Traffic Management Technology Demonstration (ATD-1) integrated concept of operations was not part of the flight test, and the high workload to manually enter the information required to conduct an IM operation. The second category was issues associated with the IM spacing algorithm or flight crew procedures. These issues include the high frequency of IM speed changes and reversals (accelerations), a mismatch between the deceleration rate used by the spacing algorithm and the actual aircraft performance, and some spacing error calculations were sensitive to normal operational variations in aircraft airspeed or altitude which triggered additional IM speed changes. Once the issues in these two categories are addressed, the future IM avionics should have considerable promise supporting the goals of improving system throughput and aircraft efficiency.

Baxley, Brian T.↗

Human-in-the-Loop Assessment of Alternative Clearances in Interval Management Arrival Operations

Interval Management Alternative Clearances (IMAC) was a human-in-the-loop simulation experiment conducted to explore the Air Traffic Management (ATM) Technology Demonstration (ATD-1) Concept of Operations (ConOps), which combines advanced arrival scheduling, controller decision support tools, and aircraft avionics to enable multiple time deconflicted, efficient arrival streams into a high-density terminal airspace. Interval Management (IM) is designed to support the ATD-1 concept by having an "Ownship" (IM-capable) aircraft achieve or maintain a specific time or distance behind a "Target" (preceding) aircraft. The IM software uses IM clearance information and the Ownship data (route of flight, current location, and wind) entered by the flight crew, and the Target aircraft's Automatic Dependent Surveillance-Broadcast state data, to calculate the airspeed necessary for the IM-equipped aircraft to achieve or maintain the assigned spacing goal.

Baxley, Brian T.↗

The Development of Cockpit Display and Alerting Concepts for Interval Management (IM) in a Near-Term Environment

The National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) Interval Management (IM) research team has conducted a wide spectrum of work in the recent past, ranging from development and testing of the concept, procedures, and algorithm. This document focuses on the research and evaluation of the IM pilot interfaces, cockpit displays, indications, and alerting concepts for conducting IM spacing operations. The research team incorporated knowledge of human factors research, industry standards for cockpit design, and cockpit design philosophies to develop innovative displays for conducting these spacing operations. The research team also conducted a series of human-in-the-loop (HITL) experiments with commercial pilots and air traffic controllers, in as realistic a high-density arrival operation environment as could be simulated, to evaluate the spacing guidance display features and interface requirements needed to conduct spacing operations.

Baxley, Brian T.↗

Experiment Description and Results for Arrival Operations Using Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR)

The predicted increase in the number of commercial aircraft operations creates a need for improved operational efficiency. Two areas believed to offer increases in aircraft efficiency are optimized profile descents and dependent parallel runway operations. Using Flight deck Interval Management (FIM) software and procedures during these operations, flight crews can achieve by the runway threshold an interval assigned by air traffic control (ATC) behind the preceding aircraft that maximizes runway throughput while minimizing additional fuel consumption and pilot workload. This document describes an experiment where 24 pilots flew arrivals into the Dallas Fort-Worth terminal environment using one of three simulators at NASA?s Langley Research Center. Results indicate that pilots delivered their aircraft to the runway threshold within +/- 3.5 seconds of their assigned time interval, and reported low workload levels. In general, pilots found the FIM concept, procedures, speeds, and interface acceptable. Analysis of the time error and FIM speed changes as a function of arrival stream position suggest the spacing algorithm generates stable behavior while in the presence of continuous (wind) or impulse (offset) error. Concerns reported included multiple speed changes within a short time period, and an airspeed increase followed shortly by an airspeed decrease.

Baxley, Brian T.↗

A Concept for Airborne Precision Spacing for Dependent Parallel Approaches

The Airborne Precision Spacing concept of operations has been previously developed to support the precise delivery of aircraft landing successively on the same runway. The high-precision and consistent delivery of inter-aircraft spacing allows for increased runway throughput and the use of energy-efficient arrivals routes such as Continuous Descent Arrivals and Optimized Profile Descents. This paper describes an extension to the Airborne Precision Spacing concept to enable dependent parallel approach operations where the spacing aircraft must manage their in-trail spacing from a leading aircraft on approach to the same runway and spacing from an aircraft on approach to a parallel runway. Functionality for supporting automation is discussed as well as procedures for pilots and controllers. An analysis is performed to identify the required information and a new ADS-B report is proposed to support these information needs. Finally, several scenarios are described in detail.

Barmore, Bryan E.↗

A Consideration of Constraints on Aircraft Departure Operations

This paper presents a system-level perspective on the operational issues and constraints that limit departure capacity at large metropolitan airports in today's air transportation system. It examines the influence of constraints evident in en route airspace, in metroplex operations, and at individual airports from today's perspective and with a view toward future gate-to-cruise operations. Cross cutting organizational and technological challenges are discussed in relation to their importance in addressing the constraints.

Darr, Stephen T.↗