Improved resistive plate chambers for HL-LHC upgrade of CMS
Not Available
Engineering topics
Publications and source records attributed to Shchablo, K..
Not Available
Not Available
During Run2 the high instantaneous luminosity, up to 2.2 · 10 34 cm -2 s -1 , lead to a substantial hit rate in the Compact Muon Solenoid experiment’s muon chambers due to multiple background sources to physics processes sought for at LHC. In this article we will describe the analysis method devised to measure and identify the contributions to such background in the Resistive Plate Chambers. Thorough understanding of the background rates provides the base for the upgrade of the muon detectors for the High-Luminosity LHC.
During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 10 34 cm -2 s -1 to 7.5 × 10 34 cm -2 s -1 . To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.
With the HL-LHC upgrade of the LHC machine, an increase of the instantaneous luminosity by a factor of five is expected and the current detection systems need to be validated for such working conditions to ensure stable data taking. At the CERN Gamma Irradiation Facility (GIF++) many muon detectors undergo such studies, but the high gamma background can pose a challenge to the muon trigger system which is exposed to many fake hits from the gamma background. A tracking system using RPCs is implemented to clean the fake hits, taking profit of the high muon efficiency of these chambers. This work will present the tracking system configuration, used detector analysis algorithm and results.
Here, we present a new generation of Resistive Plate Chambers (RPC) that are able to withstand high particle fluxes (up to 2 kHz cm -2 ). These chambers will be instrumented with a precise timing readout electronics and they are proposed to equip two of the four high eta stations of the CMS muon system.Two-gap RPC detectors, with each gap made of two 1.4 mm High Pressure Laminate (HPL) electrodes and separated by a gas gap of the same thickness, are proposed. The new scheme reduces the amount of the avalanche charge produced by the passage of a charged particle through the detector. This improves the RPC rate capability by reducing the needed time to absorb this charge. To keep the RPC efficiency high a sensitive, low-noise and high time resolution Front-End Electronics Board (FEB) is needed to cope with the low charge signal. An ASIC called PETIROC that has all these characteristics is proposed to read out the new chambers. A thin (0.6 mm) Printed Circuit Board (PCB), 165 cm long, equipped with pickup strips of average pitch of 0.75 cm is inserted between the two RPC gaps. The strips are read out from both ends and the arrival time difference of the two signals is used to determine the particle position along the strip ( η position). The absolute time measurement will also be used to reduce the data ambiguity due to the expected high pileup at the High-Luminosity phase of the Large Hadron Collider (HL-LHC).