Plug and Process Loads Capacity and Power Requirements Analysis

This report addresses gaps in actionable knowledge that would help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. Limited initial data, however, suggest that actual PPL densities in leased buildings are substantially lower. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems. Better guidance will enable improved sizing and design of these systems, decrease upfront capital costs, and allow systems to operate more energy efficiently. The main focus of this report is to provide industry with reliable, objective third-party guidance to address the information gap in typical PPL densities for commercial building tenants. This could drive changes in negotiations about PPL energy demands.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Results and Lessons Learned From the DOE Commercial Building Partnerships: Preprint

Over the course of 5 years, NREL worked with commercial building owners and their design teams in the DOE Commercial Building Partnerships (CBP) to cut energy consumption by 50% in new construction (versus code) and by 30% in existing building pilot projects (versus code or pre-retrofit operational energy use depending on the preference of the Partner) using strategies that could be replicated across their building portfolios. A number of different building types were addressed, including supermarket, retail merchandise, combination big box (general merchandise and food sales), high rise office space, and warehouse. The projects began in pre-design and included a year of measurement data to evaluate performance against design expectations. Focused attention was required throughout the entire process to achieve a design with the potential to hit the energy performance target and to operate the resulting building to reach this potential. This paper will report quantitative results and cover both the technical and the human sides of CBP, including the elements that were required to succeed and where stumbling blocks were encountered. It will also address the impact of energy performance goals and intensive energy modeling on the design process innovations and best practices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Healthcare Energy End-Use Monitoring

NREL partnered with two hospitals (MGH and SUNY UMU) to collect data on the energy used for multiple thermal and electrical end-use categories, including preheat, heating, and reheat; humidification; service water heating; cooling; fans; pumps; lighting; and select plug and process loads. Additional data from medical office buildings were provided for an analysis focused on plug loads. Facility managers, energy managers, and engineers in the healthcare sector will be able to use these results to more effectively prioritize and refine the scope of investments in new metering and energy audits.

30 DIRECT ENERGY CONVERSION↗

Analysis of Plug Load Capacities and Power Requirements in Commercial Buildings: Preprint

Plug and process load power requirements are frequently overestimated because designers often use estimates based on 'nameplate' data, or design assumptions are high because information is not available. This generally results in oversized heating, ventilation, and air-conditioning systems; increased initial construction costs; and increased energy use caused by inefficiencies at low, part-load operation. Rightsizing of chillers in two buildings reduced whole-building energy use by 3%-4%. If an integrated design approach could enable 3% whole-building energy savings in all U.S. office buildings stock, it could save 34 TBtu of site energy per year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Monitoring and Characterization of Miscellaneous Electrical Loads in a Large Retail Environment

Buildings account for 40% of primary energy consumption in the United States (residential 22%; commercial 18%). Most (70% residential and 79% commercial) is used as electricity. Thus, almost 30% of U.S. primary energy is used to provide electricity to buildings. Plug loads play an increasingly critical role in reducing energy use in new buildings (because of their increased efficiency requirements), and in existing buildings (as a significant energy savings opportunity). If all installed commercial building miscellaneous electrical loads (CMELs) were replaced with energy-efficient equipment, a potential annual energy saving of 175 TWh, or 35% of the 504 TWh annual energy use devoted to MELs, could be achieved. This energy saving is equivalent to the annual energy production of 14 average-sized nuclear power plants. To meet DOE's long-term goals of reducing commercial building energy use and carbon emissions, the energy efficiency community must better understand the components and drivers of CMEL energy use, and develop effective reduction strategies. These goals can be facilitated through improved data collection and monitoring methodologies, and evaluation of CMELs energy-saving techniques.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗