Identification and Evaluation for Fueling of NRIC DOME Reactors Report

The National Reactor Innovation Center (NRIC) has designed a testbed for advanced microreactor experiments that enables and encourages technology developers to bring advanced designs closer to commercial availability. The test bed, Demonstration of Microreactor Experiments (DOME), will be used to facilitate much of the operation experimentation process of the each advanced microreactor including fueling and operational power experiments. This report identifies and evaluates the options for initial fueling the microreactors in DOME. This report also discusses the optional locations that were considered for the initial fueling of microreactor; namely the Transient Reactor Test (TREAT) reactor building, and an unspecified temporary location. But various logistical and construction issues essentially eliminated these other options from further consideration. A brief discussion in this report outlines potential equipment and protocol associated with fueling in DOME.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗