Search NASA⌕ Search

Engineering topics

Shipley, Jessica A.

Publications and source records attributed to Shipley, Jessica A..

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed Energy Resource Interconnection Roadmap

Adopting strategic reforms to DER interconnection can help reduce interconnection delays, fairly allocate costs, improve transparency and equity, and support efficient and strategic investment in distribution and sub-transmission grids that can accommodate a rapidly evolving energy landscape. The Interconnection Innovation e-Xchange envisions this roadmap and its transmission system companion volume as collaborative resources to facilitate continued stakeholder discussions, problem-solving, and innovation as the U.S. works together to enable simpler, faster, and fairer interconnection of clean energy resources all while enhancing the reliability, resiliency, and security of our electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Proactive Regulatory Approaches to Electrification and Load Growth: Pre-read Document to Support the July 10-11 th Workshop

This document summarizes objectives and context related to a DOE-funded workshop on proactive regulatory approaches to electrification and load growth. It briefly summarizes some of the regulatory barriers to pursuing a proactive approach and some of the risks associated with such an approach. It then summarizes a selection of recent utility proposals and public utility commission actions related to proactive approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗