Search NASASearch

Engineering topics

Sides, Steve

Publications and source records attributed to Sides, Steve.

COBRA Main Engine Project

The COBRA (CO-Optimized Booster for Reusable Applications) project include the following: 1. COBRA main engine project team. 2. COBRA and RLX cycles selected. 3. COBRA proto-type engine approach enables mission success. 4. COBRA provides quick, low cost demo of cycle and technologies. 5. COBRA cycle I risk reduction supports. 6. Achieving engine safety. 6. RLX cycle I risk reduction supports. 7. Flight qualification. 9. Life extension engine testing.

Snoddy, Jim

2nd Generation Reusable Launch Vehicle (2G RLV)

This is a revised final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

Matlock, Steve