Detecting Passing Valves at Scale Across Different Buildings and Systems: A Brick Enabled and Mortar Tested Application

Heating hot water distribution systems are typically used in commercial buildings to condition spaces to provide occupant thermal comfort. However, recent research shows significant distribution losses within these systems that drive down the overall hot water plant efficiency. This research focuses on detecting passing valves in reheat coils found in variable air volume (VAV) terminal units to reduce distribution losses. A passing valve allows hot water flow when the actuator on the valve is commanded to be closed. The fluid causes unintentional heating or cooling to occur, causing comfort and control issues, and wasting energy. We developed the passing valve detection algorithm using a framework based on the Brick schema and Mortar platform to ensure that the application is portable and can scale to many buildings. We applied the same application to analyze 1,335 VAV reheat terminal units in 20 buildings. The diversity found in these large datasets increases confidence that any building with VAV reheat terminal units with the required sensors and Brick data model can run our open-source algorithm with little or no modification. In aggregate, 5% of VAV units analyzed were categorized as having a sensor fault, 14% with potential passing valve fault, and 81% with no faults detected. However, there is a significant variation in the proportion of VAV units with a passing valve detected (1% to 83%) of each building’s analyzed units.

Roa, Carlos Duarte↗

Re-Envisioning RCx: Achieving Max Potential HVAC Controls Retrofits through Modernized BAS Hardware and Software

Most existing buildings have sub-optimal heating, ventilation, and air conditioning (HVAC) controls, resulting in wasted energy and occupant discomfort. Retro-commissioning (RCx) addresses many of these issues, but it is a lengthy and highly customized process. Limited capabilities of existing building automation system hardware restricts the scope of most RCx projects. Incentive programs consider building automation system (BAS) hardware retrofits to be high-capital investments and do not allow them in typical RCx programs. This paper describes work that the authors are leading to facilitate technical and market innovation in the BAS industry to unlock large savings in existing commercial buildings through deep retrofits of BAS hardware and software. California and New York research projects are demonstrating BAS retrofits leveraging the American Society of Heating, Refrigeration, and Air Conditioning Engineers’ (ASHRAE) new Guideline 36 high performance sequences of operation to achieve greater than 20 percent whole building energy savings, while saving costs and reducing risk through streamlined processes and standardization across BAS manufacturer product lines and across implementation practices. This paper describes market barriers that impede achieving deep savings from BAS retrofits in custom incentive and traditional RCx programs and presents a new maximum potential BAS retrofit model that addresses these barriers. The new model leverages the authors’ efforts in market enablement through open standards, BAS industry partnerships, and tools for cost-effective scaling that includes tools for project screening, savings calculations, and measurement and verification (M&V). This approach is widely applicable and will be ready for at-scale implementation within two years.

Paliaga, Gwelen↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗