Search NASA⌕ Search

Engineering topics

Skitt, Darren

Publications and source records attributed to Skitt, Darren.

At least 19 records

Sister Rod Destructive Examinations (FY23) Appendix F: Cyclic Integrated Reversible-Bending Fatigue Tests

Spent nuclear fuel (SNF) assemblies must be shipped to other sites for processing and disposal. During shipment, the fuel is typically oriented horizontally, and the fuel rods are subject to periodic alternating loads related to the movement of the vehicle that results in alternating bending of the SNF fuel rods. The number of bending cycles is related to the length of the shipping route, with longer routes producing more cycles. Because it is well-known that cyclic loads can produce failures, even when the stress and strain imposed are below the material’s yield point, investigation of the SNF’s fatigue behavior is prudent. This report discusses the results of fatigue testing conducted at Oak Ridge National Laboratory (ORNL) using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) created by the US Department of Energy Office of Nuclear Energy for the High Burnup Spent Fuel Data Project and its sister rods. The results of the tests are compared with results obtained over the last decade using the same CIRFT for the US Nuclear Regulatory Commission (NRC).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY23): Appendix J: Leaching of High Burnup Used Nuclear Fuel in Deionized Water

The leaching experiment aims to understand the trends in the radiolysis-enhanced dissolution of HBU SNF when exposed to water (e.g., in-reactor or in-pool cladding failures). Specimens from a baseline M5-clad rod and a heat-treated M5 rod were cut from the fractured CIRFT specimens and placed in 100 mL deionized water for a period of 128 days. Both radial and axial sections were cut to provide different surface areas of fuel in contact with the leachate. During the four-month exposure period, aliquot samples of the leachate were analyzed using gamma spectroscopy and inductively coupled plasma - mass spectrometry (ICP-MS). The analysis quantified the amount of fuel leached into the solutions and provided individual isotopic release fractions (of 30+ isotopes) which were compared as a function of time and surface area of the fuel exposed. Consistent with existing literature, the leaching followed a trend in which isotopes of certain elements such as Cs and Mo were among the first species in the matrix to dissolve, and with the highest release rates. This was followed by a gradual matrix dissolution consisting of uranium and other actinides and a slower-than-matrix release from some isotopes, including Ru and Rh. It was also observed that the circumferential samples having less exposed fuel surface area (to begin with) leached more than the axial samples for a majority of the isotopes during the timespan of the study. Previous experiments were conducted by decladding or exposing the pellet-clad surface completely, but the samples used in this study retained the cladding. One possible explanation for the higher leaching rate of the circumferential samples is that the pellet-clad interface, which has a greater density of grain boundaries and defects, may be the most vulnerable area to leaching of fuel in the presence of water.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sister Rod Destructive Examinations (FY23): Appendix H: Instron Uncertainty Calculations

This document discusses the uncertainty of measurements associated with the Instron system and the resulting uncertainty in the acquired measurements and calculated information. The primary parameters measured during the Instron test include the applied load and specimen deflection. The associated primary calculated parameters are the maximum beam deflection at the rod’s axial center and modulus of elasticity. Secondary calculated parameters include specimen stress and strain amplitudes, as well as flexural rigidity. The uncertainty associated with the primary and secondary calculated parameters was investigated based on the known uncertainty in the measured parameters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sister Rod Destructive Examinations (FY22) Appendix E: Mechanical Testing

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rod’s condition before dry storage and are focused on understanding overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition.This appendix documents the status of the ORNL Phase 1 DE activities related to the mechanical testing of selected sister rods in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY23) Appendix E2: Four-Point Bend Fractured Specimen Images

This report documents work performed under the Spent Fuel and Waste Disposition’s Spent Fuel and Waste Science and Technology program for the US Department of Energy (DOE) Office of Nuclear Energy (NE). This work was performed to fulfill Level 2 Milestone M2SF-24OR010201024, “FY23 ORNL Testing on Sibling Pins,” within work package SF-24OR01020102 and is an update to the work reported in M2SF-23OR010201024, M2SF-22OR010201047, M2SF-21OR010201032, M2SF-19ORO010201026, and M2SF-19OR010201028. As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rods’ condition before they are sent to dry storage and are focused on gaining an understanding of overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition. This report documents the status of the ORNL Phase 1 DE activities related to the mechanical testing of selected sister rods in Phase 1 of the sister rod test program. This appendix provides images of the segments broken in four-point bending (4PB).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Determination of Average Burnup in AGR-3/4 Compacts 1-4 and 7-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011, and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and post-irradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite. These two goals were combined in the AGR-3/4 irradiation, which consisted of 12 independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. Two capsule types were used: a standard capsule and a so-called fuel body, in which the outer graphite ring included a floor and cap that fully enclosed the fuel. The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from the matrix and graphite at accident temperatures.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY22) Appendix F: Cyclic Integrated Reversible-Bending Fatigue Tests

This report documents work performed under the Spent Fuel and Waste Disposition’s Spent Fuel and Waste Science and Technology program for the US Department of Energy (DOE) Office of Nuclear Energy (NE). This work was performed to fulfill Level 3 Milestone M3SF-22OR010201046, “Draft FY2022 ORNL Report on High Burnup Sibling Pin Testing Results,” within work package SF-22OR01020104 and is an update to the work reported in M2SF-22OR010201047, M2SF-21OR010201032, M2SF-19ORO010201026 and M2SF-19OR010201028. As a part of DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin (LT) Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rods’ condition before dry storage and are focused on understanding overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition. This appendix documents the status of the ORNL Phase 1 DE activities related to tests of the sister rods using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) in Phase 1 of the sister rod test program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sister Rod Destructive Examinations (FY22) Appendix E: Mechanical Testing - Spent Fuel and Waste Disposition

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rod’s condition before dry storage and are focused on understanding overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition. This report documents the status of the ORNL Phase 1 DE activities related to the mechanical testing of selected sister rods in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY22) Appendix J: Leaching of High Burnup Used Nuclear Fuel in Deionized Water

The leaching experiment aims to understand the trends in the radiolysis-enhanced dissolution of HBU SNF when exposed to water (e.g., in-reactor or in-pool cladding failures). Specimens from a baseline M5-clad rod and a heat-treated M5 rod were cut from the fractured CIRFT specimens and placed in 100 mL deionized water for a period of 128 days. Both radial and axial sections were cut to provide different surface areas of fuel in contact with the leachate. During the four-month exposure period, aliquot samples of the leachate were analyzed using gamma spectroscopy and inductively coupled plasma - mass spectrometry (ICP-MS). The analysis quantified the amount of fuel leached into the solutions and provided individual isotopic release fractions (of 30+ isotopes) which were compared as a function of time and surface area of the fuel exposed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY2021) Appendix E Mechanical Testing

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. This report documents the status of the ORNL Phase 1 DE activities related to the mechanical testing of selected sister rods in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY2021) Appendix J: Leaching of High Burnup Used Nuclear Fuel in De-ionized Water

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. The leaching experiment was a part of a larger study by Yadukrishnan Sasikumar in defending his doctoral thesis at The Open University, School of Engineering and Innovation [13]. It utilized post-CIRFT Sister Rod test specimens that were slated for disposal. The leaching experiment aims to understand the trends in the radiolytic dissolution of High Burnup Spent Nuclear Fuel (SNF) when exposed to water (e.g., in-reactor or in-pool cladding failures). Specimens from a baseline M5-clad rod and a heat-treated M5 rod were cut from the fractured CIRFT specimens and placed in 100 mL de-ionized water for a period of 128 days. Both radial and axial sections were cut to provide different surface areas of fuel in contact with the leachate. During the four-month exposure period, aliquot samples of the leachate were analyzed gamma spectroscopy and inductively coupled plasma mass spectrometry (ICP-MS). The analysis quantified the amount of fuel leached into the solutions and provided individual isotopic release fractions (of 30+ isotopes) which were compared as a function of time and surface area of fuel exposed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY2021) Appendix F: Cyclic Integrated Reversible-Bending Fatigue Tests

As a part of DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin (LT) Zirc-4, ZIRLO, and M5. This appendix documents the status of the ORNL Phase 1 DE activities related to tests of the sister rods using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compacts 8-4 and 7-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined into one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011, and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both to be focused on obtaining fission product transport data to support improvements in modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and postirradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These goals were combined in the AGR-3/4 irradiation experiment, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a fuel body, in which the outer graphite ring included a floor and cap to fully enclose the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to obtain data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sister Rod Destructive Examinations (FY20), Appendix F: Cyclic Integrated Reversible-Bending Fatigue Tests

This report documents work performed under the Spent Fuel and Waste Disposition’s Spent Fuel and Waste Science and Technology program for the US Department of Energy (DOE) Office of Nuclear Energy (NE). This work was performed to fulfill Level 2 Milestone M2SF-21OR010201032, “ORNL High Burnup Confirmatory Demo Sibling Rod Testing Results,” within work package SF-21OR01020103 and is an update to the work reported in M2SF-19ORO010201026 and M2SF-19OR010201028.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-2 Loose Particle Heating Tests in the Furnace for Irradiated TRISO Testing

A furnace system was developed to thermally expose individual tristructural-isotropic (TRISO) coated particles to expand upon established postirradiation examination (PIE) safety testing that is used to explore particle failures and fission product release from compacts. Two systems were installed in the Irradiated Fuels Examination Facility (IFEL) at Oak Ridge National Laboratory (ORNL). The targeted design was intended to be simple and flexible to allow a range in conditions to be explored. Initial inert atmosphere testing indicated the presence of particle failures, so modifications to the testing approach were implemented to improve the furnace operation. Ultimately, burnback particles were analyzed to provide a direct measurement of fission product release, thus avoiding the complications from integral release that were observed during whole compact testing. Particles were exposed to temperatures ranging 1,150–1,300°C for up to 1,500 h and 1,600°C up to 500 h. No indication of uniform release of fission products such as 106 Ru, 125 Sb, or 154 Eu was observed, however, indication of particle dependent 154 Eu release was suggested for select particles. Exploration of 110m Ag release was limited to 1,150°C and 1,300°C up to 500 h. The analysis indicated that there was nonuniform release of 110m Ag and supports a possible bimodal temperature dependence on silver release.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compact 1-4 and 10-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011 and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and postirradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These two goals were combined in the AGR-3/4 irradiation, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a “fuel body”, in which the outer graphite ring included a floor and cap that fully enclosed the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗