Search NASA⌕ Search

Engineering topics

Sment, Jeremy

Publications and source records attributed to Sment, Jeremy.

At least 37 records · Page 2

Roadmap to Advance Heliostat Technologies for Concentrating Solar-Thermal Power

Heliostat-based concentrating solar-thermal power (CSP) systems can offer immense potential to provide low-cost, dispatchable renewable thermal and electrical energy to help achieve 100% decarbonized energy infrastructure in the United States. Heliostats are a major capital cost technology and a performance-dominating component of state-of-the-art commercial molten salt towers and Generation 3 CSP systems. In 2021, the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO) launched the Heliostat Consortium (HelioCon), a five-year initiative to advance heliostat technologies. The HelioCon mission is threefold: (1) establish strategic core testing and modeling capabilities and infrastructure at national labs; (2) support heliostat technology development in relevant industries; and (3) serve as a central repository to integrate industry, academia, and other stakeholders for heliostat technology research, development, validation, and deployment. In this report, HelioCon presents a roadmapping study on advancing heliostat technologies, intended as a central reference for the whole CSP community.

14 SOLAR ENERGY↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

100% Carbon-Free Electricity for Sandia NM and KAFB Using Concentrating Solar Power (CSP) (SAND Report)

This report provides a design study to produce 100% carbon-free electricity for Sandia NM and Kirtland Air Force Base (KAFB) using concentrating solar power (CSP). Annual electricity requirements for both Sandia and KAFB are presented, along with specific load centers that consume a significant and continuous amount of energy. CSP plant designs of 50 MW and 100 MW are then discussed to meet the needs of Sandia NM and the combined electrical needs of both Sandia NM and KAFB. Probabilistic modeling is performed to evaluate inherent uncertainties in performance and cost parameters on total construction costs and the levelized cost of electricity. Total overnight construction costs are expected to range between ~$300M - $400M for the 50 MW CSP plant and between ~$500M - $800M for the 100 MW plant. Annual operations and maintenance (O&M) costs are estimated together with potential offsets in electrical costs and CO 2 emissions. Other considerations such as interconnections, land use and permitting, funding options, and potential agreements and partnerships with Public Service Company of New Mexico (PNM), Western Area Power Administration (WAPA), and other entities are also discussed.

14 SOLAR ENERGY↗