Search NASASearch

Engineering topics

Smith, Clayton

Publications and source records attributed to Smith, Clayton.

The Case for a 50+ Year Radioisotope Power System

The Johns Hopkins University Applied Physics Laboratory (JHU/APL) is leading the NASA funded Interstellar Probe study to explore the “Very Local” interstellar medium. To perform this exploration the mission will be required to last at least 50 years in regions of space where solar power is no longer practical. Additionally, several new studies for the National Academies’ Planetary Science and Astrobiology Decadal Survey are planning missions lasting 20-35 years. The Decadal Survey is used to build consensus on priority of national science goals. These proposed missions are inconsistent with the NASA’s current Radioisotope Power Systems (RPS) life requirement of 14 years (flight). Paramount to these proposed long-duration missions are questions about the longevity of such a mission. Evidence exists that space-borne Radioisotope Power Systems can indeed last a long time. LES-9, Voyager I, and Voyager II are over 40 years old, LES-8, Pioneer 10, and Pioneer 11 lasted 28, 30, and 22 years, respectively, and New Horizons is still active 15 years after launch. This paper explores the need for RPS designs that are intended to last much longer than the current requirement of 14 years (17 years after fueling) and explores the historical record for actual vs design lifetimes to show the feasibility of building long lasting RPS. We also exercise a current RTG performance model of the General-Purpose Heat Source RTG using the JPL Lifetime Performance Prediction (LPP) tool to make top-level inferences about power output at end-of-mission, and discusses how reliability engineering and testing methods can be brought to bear to increase confidence in delivering sufficient power at end-of-mission.

Phan, Brian

Stirling to Flight Initiative

NASA has a consistent need for radioisotope power systems (RPS) to enable robotic scientific missions for planetary exploration that has been present for over four decades and will continue into the foreseeable future, as documented in the most recent Planetary Science Decadal Study Report. As RPS have evolved throughout the years, there has also grown a desire for more efficient power systems, allowing NASA to serve as good stewards of the limited plutonium-238 (238Pu), while also supporting the ever-present need to minimize mass and potential impacts to the desired science measurements. In fact, the recent Nuclear Power Assessment Study (NPAS) released in April 2015 resulted in several key conclusion regarding RPS, including affirmation that RPS will be necessary well into the 2030s (at least) and that 238Pu is indeed a precious resource requiring efficient utilization and preservation. Stirling Radioisotope Generators (SRGs) combine a Stirling cycle engine powered by a radioisotope heater unit into a single generator system. Stirling engine technology has been under development at NASA Glenn Research Center (GRC) in partnership with the Department of Energy (DOE) since the 1970's. The most recent design, the 238Pu-fueled Advanced Stirling Radioisotope Generator (ASRG), was offered as part of the NASA Discovery 2010 Announcement of Opportunity (AO). The Step-2 selections for this AO included two ASRG-enabled concepts, the Titan Mare Explorer (TiME) and the Comet Hopper (CHopper), although the only non-nuclear concept, InSight, was ultimately chosen. The DOE's ASRG contract was terminated in 2013. Given that SRGs utilize significantly less 238Pu than traditional Radioisotope Thermoelectric Generators (RTGs) - approximately one quarter of the nuclear fuel, to produce similar electrical power output - they provide a technology worthy of consideration for meeting the aforementioned NASA objectives. NASA's RPS Program Office has recently investigated a new Stirling to Flight (S2F) initiative with the objective of developing a 100-500 We Stirling generator system. Additionally, a different approach is being devised for this initiative to avoid pitfalls of the past, and apply lessons learned from the recent ASRG experience. Two key aspects of this initiative are a Stirling System Technology Maturation Effort, and a Surrogate Mission Team (SMT) intended to provide clear mission pull and requirements context. The S2F project seeks to lead directly into a DOE flight system development of a new SRG. This paper will detail the proposed S2F initiative, and provide specifics on the key efforts designed to pave a forward path for bringing Stirling technology to flight.

Robotics

Goal Based Testing: A Risk Informed Process

A process for life demonstration testing is developed, which can reduce the number of resources required by conventional sampling theory while still maintaining the same degree of rigor and confidence level. This process incorporates state-of-the-art probabilistic thinking and is consistent with existing NASA guidance documentation. This view of life testing changes the paradigm of testing a system for many hours to show confidence that a system will last for the required number of years to one that focuses efforts and resources on exploring how the system can fail at end-of-life and building confidence that the failure mechanisms are understood and well mitigated.

Everline, Chester