Search NASA⌕ Search

Engineering topics

Smith, Steven A.

Publications and source records attributed to Smith, Steven A..

At least 19 records

Subsurface H 2 Storage: A Williston Basin Commercial-Scale Resource Study

Poster for the 2024 NETL Resource Sustainability Project Review Meeting, Pittsburgh, Pennsylvania, April 2-4, 2024. This poster presents a commercial‑scale assessment of subsurface hydrogen storage potential in the North Dakota portion of the Williston Basin, evaluating saline formations, depleted oil and gas reservoirs, and salt formations. The study integrates laboratory characterization, reservoir simulation, and basinwide analysis to assess storage capacity, injectivity, recovery, and risks related to geochemical, microbial, and wellbore interactions. Results support the feasibility of large‑volume, secure hydrogen storage and provide a framework to guide future hydrogen commercialization and infrastructure development.

08 HYDROGEN↗

Optimization of operational strategies for rich gas enhanced oil recovery based on a pilot test in the Bakken tight oil reservoir

Horizontal well drilling and multistage hydraulic fracturing have been demonstrated as effective approaches for stimulating oil production in the Bakken tight oil reservoir. However, after multiple years of production, primary oil recovery in the Bakken is generally less than 10% of the estimated original oil in place. Gas huff ‘n’ puff (HnP) has been tested in the Bakken Formation as an enhanced oil recovery (EOR) method; however, most field pilot test results showed no significant incremental oil production. One of the factors affecting HnP EOR performance is premature gas breakthrough, which is one of the most critical issues observed in the field because of the presence of interwell fractures. Consequently, injected gas rapidly reaches adjacent production wells without contacting reservoir rock and increasing oil recovery. Proper conformance control is therefore needed to avoid early gas breakthrough and improve EOR performance. In this study, a rich gas EOR pilot in the Bakken was carefully analyzed to collect the essential reservoir and operational data. A simulation model with 16 wells was then developed to reproduce the production history and predict the EOR performance with and without conformance control. EOR operational strategies, including single- and multiple-well HnP, with different gas injection constraints were investigated. The simulation results of single-well HnP without conformance control showed that a rich gas injection rate of at least 10 MMscfd was needed to yield meaningful incremental oil production. The strategy of conformance control via water injection could significantly improve oil production in the HnP well, but injecting an excessive amount of water also leads to water breakthrough and loss of oil production in the offset wells. By analyzing the production performance of the wells individually, the arrangement of wells was optimized for multiple-well HnP EOR. The multiwell results showed that rich gas EOR could improve oil production up to 7.4% by employing conformance control strategies. Furthermore, replacing rich gas with propane as the injection gas could result in 14% of incremental oil production.

02 PETROLEUM↗

Stacked Carbon Dioxide Storage: Technical and Geomechanical Considerations

Conference paper presented at 16th International Conference on Greenhouse Gas Control Technologies (GHGT-16), Lyon, France, October 23–27, 2022. When two or more carbon dioxide (CO 2 ) storage targets are present in the subsurface at the same geographic location, a CO 2 storage project may pursue a stacked storage approach. This investigation was predominantly focused on dedicated storage in stacked saline formations to assess technical and geomechanical considerations. Along with a best practice stacked storage review, a geomechanical assessment was performed to test a 20-year CO 2 injection scenario.

01 COAL, LIGNITE, AND PEAT↗

Optimizing conformance control for gas injection EOR in unconventional reservoirs

Field observations have shown that interference between wells caused by connected fractures commonly exists in unconventional reservoirs. The well interference effect and conformance issues could lead to minimal enhanced oil recovery response (EOR) in actual operations if they are not properly controlled. A series of data analysis, modeling, and experimental activities were performed in this study to investigate the gas EOR strategies in the Bakken Formation. Employing the embedded discrete fracture modeling technology, a multiple-well, multiple-fracture model was developed to capture the well interference and conformance issues in the Bakken. The model made it possible to investigate the complex flow behavior between wells in the EOR (huff ‘n’ puff) processes. Alternative EOR and conformance control strategies using water and surfactant injections were studied to improve oil production performance based on experimental observations. Results showed that water injection could be used for conformance control in the Bakken because of its relatively low mobility compared to gas; however, water could also block oil flow around the conformance control wells because of the high interfacial tension between oil and water. Adding surfactant to the injection water is more effective for improving gas EOR performance since surfactant reduces the oil–water interfacial tension and contact angle effectively. Up to 9.4% more oil could be produced from the huff ‘n’ puff wells in 2 years of EOR operations when rich gas was injected at only 3 MMscf/d with 6000 psi of surfactant injection in the offset wells for conformance control.

42 ENGINEERING↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Identification of Residual Oil Zones in the Williston and Powder River Basins

The goal of this project by the Energy & Environmental Research Center was to systematically assess the petroleum systems of the Williston and Powder River Basins (PRB) for prospective residual oil zones (ROZs) through a geologic process modeling approach. This approach models the evolution of a sedimentary basin to predict if, when, and where reservoirs were charged with hydrocarbons. Suspected ROZs identified by this approach were evaluated for their potential oil recovery using carbon dioxide (CO 2 ) and for associated CO 2 storage. ROZs are naturally waterflooded portions of oil reservoirs with oil saturations between 25% and 40% but are at irreducible oil saturation levels with respect to water, rendering the reservoirs uneconomic using conventional recovery methods. However, using CO 2 enhanced oil recovery (EOR), substantial amounts of oil can be recovered from ROZs while simultaneously storing CO 2 . ROZs were originally identified and defined in the Permian Basin of West Texas but have since been identified or speculated in several geologic basins, including the Williston Basin and PRB.

54 ENVIRONMENTAL SCIENCES↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2013, through September 30, 2014 (PY7) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Fort Nelson Carbon Capture and Storage Feasibility Study: A Best Practices Manual for Storage in a Deep Carbonate Saline Formation

The Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center, and Spectra Energy Transmission (SET) have investigated the feasibility of a carbon capture and storage (CCS) project to mitigate carbon dioxide (CO 2 ) emissions produced by SET's Fort Nelson Gas Plant (FNGP). The PCOR partnership applied geologic characterization; modeling; risk assessment (RA), and monitoring, verification, and accounting (MVA) strategies using an integrated, iterative process to produce superior-quality results during the project feasibility period. The Fort Nelson efforts serve as the basis for a Best Practices Manual (BPM) that offers stakeholders insight and guidance on geological storage of CO 2 in a deep carbonate saline formation.

54 ENVIRONMENTAL SCIENCES↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Geochemical Evaluation of the Basal Cambrian System

The focus of this report is to evaluate and discuss geochemical modeling and laboratory studies performed by the Energy & Environmental Research Center to determine potential chemical reactions between CO 2 , brine, and rock on the portion of the Cambro-Ordovician saline system that occurs in North Dakota, Montana, and South Dakota.

54 ENVIRONMENTAL SCIENCES↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2011, through September 30, 2012 (PY5), and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Subtask 1.8 - Investigation of Improved Conductivity and Proppant Applications in the Bakken Formation

Given the importance of hydraulic fracturing and proppant performance for development of the Bakken and Three Forks Formations within the Williston Basin, a study was conducted to evaluate the key factors that may result in conductivity loss within the reservoirs. Various proppants and reservoir rock cores were exposed to several different fracturing and formation fluids at reservoir conditions. The hardness of the rock cores and the strength of the proppants were evaluated prior to and following fluid exposure. In addition, the conductivity of various proppants, as well as formation embedment and spalling, was evaluated at reservoir temperatures and pressures using actual reservoir rock cores. The results of this work suggest that certain fluids may affect both rock and proppant strength, and therefore, fluid exposure needs to be considered in the field. In addition, conductivity decreases within the Bakken Formation appear to be a function of a variety of factors, including proppant and rock strength, as well as formation embedment and spalling. The results of this study highlight the need for advanced conductivity testing, coupled with quantification of formation embedment and spalling. Given the importance of proppant performance on conductivity loss and, ultimately, oil recovery, better understanding the effects of these various factors on proppant and rock strength in the field is vital for more efficient production within unconventional oil and gas reservoirs.

02 PETROLEUM↗

Optimized Vertex Method and Hybrid Reliability

A method of calculating the fuzzy response of a system is presented. This method, called the Optimized Vertex Method (OVM), is based upon the vertex method but requires considerably fewer function evaluations. The method is demonstrated by calculating the response membership function of strain-energy release rate for a bonded joint with a crack. The possibility of failure of the bonded joint was determined over a range of loads. After completing the possibilistic analysis, the possibilistic (fuzzy) membership functions were transformed to probability density functions and the probability of failure of the bonded joint was calculated. This approach is called a possibility-based hybrid reliability assessment. The possibility and probability of failure are presented and compared to a Monte Carlo Simulation (MCS) of the bonded joint.

Smith, Steven A.↗

Probabilistic Design of a Plate-Like Wing to Meet Flutter and Strength Requirements

An approach is presented for carrying out reliability-based design of a metallic, plate-like wing to meet strength and flutter requirements that are given in terms of risk/reliability. The design problem is to determine the thickness distribution such that wing weight is a minimum and the probability of failure is less than a specified value. Failure is assumed to occur if either the flutter speed is less than a specified allowable or the stress caused by a pressure loading is greater than a specified allowable. Four uncertain quantities are considered: wing thickness, calculated flutter speed, allowable stress, and magnitude of a uniform pressure load. The reliability-based design optimization approach described herein starts with a design obtained using conventional deterministic design optimization with margins on the allowables. Reliability is calculated using Monte Carlo simulation with response surfaces that provide values of stresses and flutter speed. During the reliability-based design optimization, the response surfaces and move limits are coordinated to ensure accuracy of the response surfaces. Studies carried out in the paper show the relationship between reliability and weight and indicate that, for the design problem considered, increases in reliability can be obtained with modest increases in weight.

Stroud, W. Jefferson↗