Performance of PIP-II high-beta 650 cryomodule after transatlantic shipping

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

43 PARTICLE ACCELERATORS↗

CW copper injector for SRF industrial cryomodules

Compact SRF industrial linacs can provide unique parameters of the beam (>1 MW and >1-10 MeV) hardly achievable by normal conducting linacs within limited space. SRF technology was prohibitively expensive until the development of conduction cooling which opened the way for compact stand alone SRF systems suitable for industrial and research applications. Limited cooling capacity puts strict requirements on the beam parameters with zero losses of the beam on the SRF cavity walls. This implies strict requirements on the beam energy to be accepted by the cryomodule and most importantly the beam bunching with zero particles in between. We designed a CW normal conducting RF injector which consists of a gridded RF gun integrated with a first cell of a copper booster cavity to satisfy these requirements. Here we present a complete design of a booster cavity including beam dynamics, RF, thermomechanical and engineering design.

43 PARTICLE ACCELERATORS↗

Low RF loss DC conductive ceramic for RF windows

Charging of RF windows has historically been problematic, frequently resulting in damage to the window severe enough that the window needs to be replaced. Many attempts have been made to prevent charging and therefore improve window lifetime, the most successful and common of which is coating the window with titanium nitride (TiN). Surface coatings such as TiN rely on the secondary electron yield of the coating material being lower than that of the ceramic window material, reducing the number of electrons emitted from a variety of mechanisms. An alternative approach is to introduce a small amount of DC conductivity to the ceramic itself, turning the traditionally insulating window into a mildly conductive one. This allows any charge on the surface of the window to drain rather than build until a discharge happens. A magnesium titanate ceramic has been developed with a small DC conductivity and used to make RF windows. Several window assemblies have been produced and tested, including 1.3 GHz waveguide and 650 MHz coaxial designs. The results of the conductive ceramic window test program will be presented.

43 PARTICLE ACCELERATORS↗

Contribution of IN2P3 to PIP-II Project: Plans and Progress

IJCLab is one of the labs of IN2P3 (National institute of nuclear and particle physics), one of the ten research institutes composing the French National Center for Scientific Research (CNRS). Since 2018, IJCLab has been involved in the PIP-II project, assisting with the design, development, and qualification of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. The first pre-production components (cavity, coupler, and tuner) have been fabricated, and some of the first qualification tests have been performed at IJCLab. This paper will summarize the complete scope of IJCLab¿s contributions to PIP-II and give updates on the performances of the first pre-production components.

43 PARTICLE ACCELERATORS↗

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab

The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which can see relatively high stress during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Status at Fermilab

The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.

Kaluzny, Joshua↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

PIP-II 650 MHz Power Coupler Thermal Studies

The Proton Improvement Plan - II (PIP-II) project is underway at Fermilab with an international collaboration involving CEA in the development and testing of 650 MHz cryomodules. One of the first main contributions of the CEA was the participation in the design efforts for the current 50 KW CW 650 MHz power couplers. This paper reports some of the results of thermal and paramet-ric studies carried out by the CEA on these power couplers

43 PARTICLE ACCELERATORS↗

Processing and Test Result of 650 MHz 50 kW CW Prototype Couplers for PIP-II Project

For PIP-II project Fermilab is developing 650 MHz couplers to deliver up to 50 kW CW RF power to the superconducting low-beta (LB650) and high-beta (HB650) cavities. To meet project requirements two different designs of the couplers were proposed, one is conventional design with copper plated stainless steel walls. In second design (EM-shielded) a copper screen is used to shield stainless steel wall from electromagnetic field. For prototyping we built two couplers of each type and tested them at 50kW with full reflection at different reflection phases. In each test the assembly of two couplers were processed with DC bias up to +5 kV, starting with short pulses and ramping power up to 100 kW. Final run for 2 hours in CW mode at 50 kW to reach equilibrium temperature regime and qualify couplers. One pair of couplers was also processed without DC bias. Finally, all four couplers demonstrated full requirements and were qualified. Based on test results the conventional coupler with some modification was chosen as a baseline design. Modified version of coupler is now ordered for prototype of HB650 cryomodule. In paper we will discuss details of coupler processing and results

43 PARTICLE ACCELERATORS↗

Built-in Thermionic Electron Source for an SRF Linacs

The design of a thermionic electron source connected directly to a superconducting cavity, the key part of an SRF gun, is described. The results of beam dynamics optimization are presented which allow lack of beam current intercepting in the superconducting cavity. The electron source concept is presented including the cathode-grid assembly, thermal insulation of the cathode from the cavity, and the gun resonator design. The cavity thermal load caused by the gun is analyzed including the static heat load, black body radiation, backward electron heating, etc.

43 PARTICLE ACCELERATORS↗

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗

β = 0.61 & 0.92 Systems for PIP-II

State-of-the-art surface treatments for SRF cavities (EP/BCP, 120C baking, 75-120C baking, N-doping) applied to 650 MHz cavities

43 PARTICLE ACCELERATORS↗

3.9 GHz SRF Production Cavities for LCLS-II

The main part of the SRF linac for the Linac Coherent Light Source II (LCLS-II) at SLAC will consist of 35 cryomodules with superconducting RF cavities operating at 1.3 GHz. In addition, two cryomodules with 3.9 GHz cavities will be installed and help to linearize the longitudinal phase space of the beam. During the design verification phase, four prototype 9-cell 3.9 GHz cavities had been built by industry and then processed, including chemical surface removal and heat treatment, and tested at Fermi National Accelerator Laboratory. Based on the resulting cavity treatment recipe, 24 cavities (for two cryomodules to be installed in the linac and one spare cryomodule) have been built by industry and tested at Fermilab prior to cryomodule string assembly. We present an overview of the cavity production and the results of the vertical acceptance tests for the LCLS-II 3.9 GHz cavities.

43 PARTICLE ACCELERATORS↗

Latest Progress in Designs and Testings of PIP-II Power Couplers

Proton Improvement Plan – II (PIP-II) project is under go in Fermi National Laboratory. Main part of the project is 800 MeV proton superconducting accelerator which includes 116 superconducting cavities of 5 different types and three 162.5, 325 and 650 MHz frequencies. Key elements of accelerator which determine a reliable operation are main couplers for superconducting cavities. This paper describes the latest progress in design and testing of main couplers for PIP-II projects.

43 PARTICLE ACCELERATORS↗

Overview of LCLS-II Project Status at Fermilab

The superconducting RF Continuous-Wave (CW) Linac for the LCLS-II consists of thirty-five 1.3 GHz and two 3.9 GHz cryomodules that Fermilab and Jefferson Lab are jointly producing in collaboration with SLAC. Fermilab’s scope of work is to build, test, and deliver half the 1.3 GHz and all the 3.9 GHz cryomodules and to design and procure components for the cryogenic distribution system. Fermilab has primary responsibility for delivering a working design. The cryomodule design basis was the European XFEL but several elements evolved to meet CW operation requirements and specifics of the SLAC tunnel. There have been several challenges faced during the design, assembly, testing and transportation of the cryomodules which have required design updates. Success in overcoming these challenges is attributable to the strength of the LCLS-II SRF Collaboration (Fermilab, Jefferson Lab and SLAC with extensive help from DESY and CEA/Saclay). The cryogenic distribution system has progressed relatively well and there are valuable Lessons Learned. An overview of the status, accomplishments, problems encountered, solutions developed, and a summary of Lessons Learned will be presented.

43 PARTICLE ACCELERATORS↗

Statistical Analysis of the Eigenmode Spectrum in the SRF Cavities with Mechanical Imperfections

The superconducting radio frequency (SRF) technology is progressing rapidly over last decades toward high accelerating gradients and low surface resistance making feasible the particle accelerators operation with high beam currents and long duty factors. However, the coherent RF losses due to high order modes (HOMs) excitation becomes a limiting factor for these regimes. In spite of the operating mode, which is tuned separately, the parameters of HOMs vary from one cavity to another due to finite mechanical tolerances during cavities fabrication. It is vital to know in advance the spread of HOM parameters in order to predict unexpected cryogenic losses, overheating of beam line components and to keep stable beam dynamics. In this paper we present the method of generating the unique cavity geometry with imperfections while preserving operating mode frequency and field flatness. Based on the eigenmode spectrum calculation of series of randomly generated cavities we can accumulate the data for the evaluation the HOM statistics. Finally, we describe the procedure for the estimation of the probability of the resonant HOM losses in the SRF resonators. The study of these effects leads to specifications of SC cavity and cryomodule and can significantly impact on the efficiency and reliability of the machine operation

43 PARTICLE ACCELERATORS↗

Performance of the First LCLS-II Cryomodules: Issues and Solutions

LCLS-II 4 GeV linac is on the middle production stage. Linac contains 40 cryomodules of 1.3 GHz and 3 cryomodules of 3.9 GHz, including spares. Fermilab and JLAB share responsibility for cryomodule design, assembly and test. Paper will overview the performance of the cryomodules it the tests, lessons learned and modifications in design to improve performance.

43 PARTICLE ACCELERATORS↗