Diagnostics of the ITER neutral beam test facility

The ITER heating neutral beam (HNB) injector, based on negative ions accelerated at 1 MV, will be tested and optimized in the SPIDER source and MITICA full injector prototypes, using a set of diagnostics not available on the ITER HNB. The RF source, where the H{sup -}/D{sup -} production is enhanced by cesium evaporation, will be monitored with thermocouples, electrostatic probes, optical emission spectroscopy, cavity ring down, and laser absorption spectroscopy. The beam is analyzed by cooling water calorimetry, a short pulse instrumented calorimeter, beam emission spectroscopy, visible tomography, and neutron imaging. Design of the diagnostic systems is presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Concepts for the magnetic design of the MITICA neutral beam test facility ion accelerator

The megavolt ITER injector concept advancement neutral injector test facility will be constituted by a RF-driven negative ion source and by an electrostatic Accelerator, designed to produce a negative Ion with a specific energy up to 1 MeV. The beam is then neutralized in order to obtain a focused 17 MW neutral beam. The magnetic configuration inside the accelerator is of crucial importance for the achievement of a good beam efficiency, with the early deflection of the co-extracted and stripped electrons, and also of the required beam optic quality, with the correction of undesired ion beamlet deflections. Several alternative magnetic design concepts have been considered, comparing in detail the magnetic and beam optics simulation results, evidencing the advantages and drawbacks of each solution both from the physics and engineering point of view.

43 PARTICLE ACCELERATORS↗

Progress in the MITICA beam source design

In the framework of the development of the ITER neutral beam (NB) system, a test facility is planned to be built in Padova. A full size prototype of the ITER heating NB injector (MITICA) shall be built and tested at full beam power (17 MW) as per ITER requirements. The design of the MITICA beam source has further progressed following updated optimization and overall integration criteria. In the paper, the major design choices and revisions are presented, together with some results of numerical analyses carried out in order to assess the electrostatic and thermo-mechanical behaviour of the source.

43 PARTICLE ACCELERATORS↗

Status of the 1 MeV Accelerator Design for ITER NBI

The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D{sup -} at 1 MeV for 3600 sec. In order to realize the beam source, design and R and D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co-extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.

43 PARTICLE ACCELERATORS↗

THE CRYOPLANT FOR THE ITER NEUTRAL BEAM TEST FACILITY TO BE BUILT AT RFX IN PADOVA, ITALY

The Neutral Beam Test Facility (NBTF), planned to be constructed in Padua (Italy), will constitute the prototype of the two Neutral Beam Injectors (NBI), which will be installed in the ITER plant (Cadarache-France). The NBTF is composed of a 1 MV accelerator that can produce a 40 A deuteron pulsed neutral beam particles. The necessary vacuum needed in the accelerator is achieved by two large cryopumps, designed by FZK-Karlsruhe, with radiation shields cooled between 65 K and 90 K and with cryopanels cooled by 4 bar supercritical helium (ScHe) between 4.5 K and 6.5 K. A new cryoplant facility will be installed with two large helium refrigerators: a Shield Refrigerator (SR), whose cooling capacity is up to 30 kW between 65 K and 90 K, and a helium Main Refrigerator (MR), whose equivalent cooling capacity is up to 800 W at 4.5 K. The cooling of the cryopanels is obtained with two (ScHe) 30 g/s pumps (one redundant), working in a closed cycle around 4 bar producing a pressure head of 100 mbar. Two heat exchangers are immersed in a buffer dewar connected to the MR. The MR and SR different operation modes are described in the paper, as well as the new cryoplant installation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗

Design of a low voltage, high current extraction system for the ITER Ion Source

A Test Facility is planned to be built in Padova to assemble and test the Neutral Beam Injector for ITER. In the same Test Facility the Ion Source will be tested in a dedicated facility planned to operate in parallel to the main 1 MV facility. Purpose of the full size Ion Source is to optimize the Ion Source performance by maximizing the extracted negative ion current density and its spatial uniformity and by minimizing the ratio of co-extracted electrons. In this contribution the design of the extractor and accelerator grids for a 100 kV, 60 A system is presented. The trajectories of the negative ions, calculated with the SLACCAD code [1], have been benchmarked by a new 2D code (BYPO [2]) which solves in a self consistent way the electric fields in presence of electric charge and magnetic fields. The energy flux intercepted by the grids is estimated by using the Montecarlo code EAMCC [3] and the grids designed according to the constraints set by the permanent magnets and by the cooling channels. The interaction of backstreaming ions due to the ionization process with the grids and the Ion Source backplate is investigated and its impact on the project and performance discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗