Search NASA⌕ Search

Engineering topics

Sotorrio, P.

Publications and source records attributed to Sotorrio, P..

Coupled TD Simulation project (Final Report)

This project implements coupled simulation of electric power grid transmission and distribution (T&D) by instantiating the co-simulation platform HELICS using a commercial distribution planning software CYMDIST1 by Eaton Inc., a power management company, and by leveraging the open-source transmission grid simulator GridDyn and LLNL’s High Performance Computing (HPC). The project is funded by DOE’s Technology Commercialization Funding (TCF) and supported by DOE Office of Technology Transitions (OTT).

14 SOLAR ENERGY↗

Large Scale Simulation Platform for NODES Validation Study

This report summarizes the Large Scale (LS) simulation platform created for the Eaton NODES project. The simulation environment consists of both wholesale market simulator and distribution simulator and includes the CAISO wholesale market model and a PG&E footprint of 25-75 feeders to validate the scalability under a scenario of 33% RPS in California with additional 17% of DERS coming from distribution and customers. The simulator can generate hourly unit commitment, 5-minute economic dispatch, and 4-second AGC regulation signals. The simulator is also capable of simulating greater than 10k individual controllable devices. Simulated DERs include water heaters, EVs, residential and light commercial HVAC/buildings, and residential-level battery storage. Feeder-level voltage regulators and capacitor banks are also simulated for feeder-level real and reactive power management and Vol/Var control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ancillary Service Revenue Potential for Geothermal Generators in California

Achieving California’s 33% renewable generation goal will substantially increase uncertainty and variability in grid operations. Geothermal power plant operators could mitigate this variability and uncertainty by operating plants in a more flexible mode. Plant operators would be compensated for flexibility through payments for ancillary services such as frequency regulation, load following, and spinning reserve. This study explores economic incentives for geothermal plant operators to provide such flexibility. Historical and forecast ancillary service prices are compared to operator compensation for energy under firm contracts at fixed prices, which are higher than current or year 2020 projected market clearing prices for ancillary services in most hours of the year. Power purchase agreements recently executed by geothermal operators typically provide only energy payments at fixed energy prices and escalation rates. We postulate new contract structures that would allow a geothermal plant operator to switch from providing energy to providing ancillary services to the grid operator when it is advantageous to the plant operator to do so. Additional revenues would be earned through ancillary service payments. Estimates of these additional annual revenues a plant operator could realize are developed for a range of contract energy prices. The impacts of flexible operations on reservoir lifetimes and implications for project finance are also discussed.

15 GEOTHERMAL ENERGY↗