Final Report on an Advanced Techno-Economic Modeling Tool for Geothermal Heat Pump Applications in Residential and Commercial Buildings
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Spitler, Jeffery.
Explore the source record for details and available documents.
Simulation-based design tools have been used since the late 1980s for designing ground heat exchangers (GHE) used with ground source heat pump (GSHP) systems. The ground heat exchanger simulations used in these tools rely on thermal response functions known as g-functions. Because of the significant computational burden in computing g-functions for even a single configuration, the design tools have relied on libraries of pre-computed g-functions. These g-functions were available for standard configuration shapes, such as lines, rectangles, open rectangles, L-shapes, and U-shapes. Standard shapes are often sub-optimal. For any building on a site, the available land may preclude use of a standard shape. For large GSHP systems with significantly imbalanced annual heat rejection and extraction loads, large rectangular fields may experience significant heat build-up (or heat draw-down) in the interior of the field. This paper describes a new ground heat exchanger design tool capable of automatically selecting and sizing both standard and irregular configurations. The focus of this paper is a method for creating, selecting and sizing irregular configurations where the available land area and "no-go" zones are described as irregular polygons.
Thermal response functions, known as g-functions, are commonly used in ground heat exchanger design tools and whole building energy simulation programs to simulate the ground heat exchanger performance. Calculation of g-functions can be quite computationally time-consuming, particularly as the number of boreholes gets large. However, once the g-function is computed, the actual simulation time can be quite short, particularly if a hybrid time-step (Cullin and Spitler 2011) approach is used. Because of this, pre-computed g-function libraries are commonly used in design tools and building simulation tools. This paper describes development of a new, publicly available library containing g-functions for 34,321 borehole field configurations; for each configuration, gfunctions are provided for 5 depths to allow interpolation between different borehole-to-height ratios. The available configurations include configurations in standard shapes: lines, rectangles, open rectangles, L-shapes, and U-shapes. It also includes new configurations: C-shapes, lopsided-U-shapes, and zoned rectangles, which are rectangular configurations with different interior and perimeter spacing of the boreholes.
Temperature response functions, known as g-functions, are a computationally efficient method for simulating ground heat exchangers (GHEs), used with ground-source heat pump (GSHP) systems, either as part of a whole-building energy simulation or as part of a dedicated ground heat exchanger design tool. In fact, at present, they are the only feasible way to simulate a ground-source heat pump system in a whole-building energy simulation. This paper summarizes recent developments in the field and recent experience using a new open-source g-function calculation tool known as pygfunction (Cimmino 2018a, 2018b). This experience includes accuracy, computation time, memory requirements and sensitivity to boundary conditions. With larger ground heat exchangers, e.g. in excess of 100 boreholes, the computational time and memory requirements can create challenges.
The high initial cost of ground heat exchangers (GHE) is a primary hurdle preventing wider adoption of ground source heat pump (GSHP) systems. GHEs used for commercial GSHP systems commonly consist of vertical boreholes installed on a grid with equal spacing between boreholes. Significant thermal loads require a large number of boreholes to be present in the field. However, due to thermal interactions among boreholes, the ground formation in the center of a bore field can, over time, become thermally saturated when the thermal load is not balanced on an annual basis. The loss of effectiveness due to thermal saturation at the center boreholes in regularly spaced borehole fields suggests that larger spacing near the center of the bore field could be more optimal, and in return reduce initial costs. Through computer simulations using the latest development of a GHE modeling tool, this study evaluates the impacts of various unconventional designs of the borehole field on the performance and cost of the GHEs of a typical commercial GSHP system. The unconventional designs include irregular spacing among boreholes with decreased spacing around the perimeter and increased spacing in the interior of the field. The unconventional bore field design shortens the total drilling length by up to 42% while giving better heat transfer performance than a conventional bore field design. The significant total bore length reduction is due to improved heat transfer effectiveness of each borehole in the unconventional bore field.