Search NASA⌕ Search

Engineering topics

Spring, Sherwood C.

Publications and source records attributed to Spring, Sherwood C..

EVA space construction - Experience and fundamental issues

Results are presented from EVA space construction studies performed in 1 g, simulated 0 g, and on-orbit. The studies include tests of astronaut participation on the Mobile Work Station concept and the Swing-Arm Beam Erector. Also, results from the Experimental Assembly of Structures in EVA and the Assembly Concept for Construction of Erectable Space Structure programs are summarized. EVA construction applications for the Space Station are discussed and construction scenarios are developed.

Heard, Walter L., Jr.↗

Astronaut/EVA construction of Space Station

Four early space construction tests performed in neutral buoyancy and/or on-orbit to evaluate EVA for assembly of truss structures are reviewed and astronaut observations are presented. In addition, two ongoing ground test programs that address EVA assembly of full scale Space Station truss structure using a mobile transporter equipped with astronaut positioning arms are described. A truss joint design that enables EVA assembly while meeting structural design goals is also discussed.

Heard, Walter L., Jr.↗

An overview of the EASE/ACCESS space construction demonstration

Consideration is given to the development of the Experimental Assembly of Structures in EVA/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS) space construction demonstration, which was performed during Space Shuttle mission 61-B. The mission equipment is described and illustrated and the EASE/ACCESS mission management structure is outlined. Simulations of the assembly and disassembly in the NASA neutral buoyancy simulators were used to test the mission plans. In addition, EVA training and crew performance for the mission are discussed.

Levin, George M.↗