Airspace Technology Demonstration 2 (ATD-2) Concept of Use (ConUse) Addendum for Phase 2
This addendum to the ATD-2 Phase 1 ConUse describes the concept of use for the ATD-2 Phase 2 IADS system.
Phase 2 IADS↗
Engineering topics
Publications and source records attributed to Staudenmeier, Robert M..
This addendum to the ATD-2 Phase 1 ConUse describes the concept of use for the ATD-2 Phase 2 IADS system.
This presentation was developed to update the TBFM/TFDM operational teams on ATD-2 Phase 2 progress and Phase 3 plans. It includes top-level compliance data and APREQ delay data, processes for data exchange between ATD-2 and TBFM and surface metering, and potential benefits of EOBTs.