Search NASA⌕ Search

Engineering topics

Steadman, Edward

Publications and source records attributed to Steadman, Edward.

Energy & Environmental Research Center (EERC)–U.S. Department of Energy (DOE) Joint Program on Research and Development for Fossil Energy-Related Resources

The EERC teamed with the DOE National Energy Technology Laboratory to conduct complementary research and development under the Joint Program on Research and Development for Fossil Energy-Related Resources (Cooperative Agreement No. DE-FC26-08NT43291). This 10-year program merged two previous 10-year agreements—DE-FC26-98FT40320 and DE-FC26-98FT40321—into a single follow-on agreement. The Fossil Energy cooperative agreement between DOE and the EERC was initiated in 1983 when the EERC was defederalized. This dynamic 35-year partnership has evolved to further research in areas that address DOE Office of Fossil Energy program goals while serving the missions and exploiting the strengths of both organizations through this agreement and a new 5-year Fossil Energy-Related Resources cooperative agreement established in 2015. As the 10-year program has ended, the purpose of this report is to summarize the activity and significant outcomes that were accomplished by the EERC. This program is an excellent model for research, development, demonstration, and commercialization partnerships between government, industry, and the applied science and engineering communities to bring cutting-edge science closer to commercial application. The overarching goal was to support DOE Fossil Energy goals by advancing the scientific knowledge and technical development essential to ensuring future sustainable supplies of affordable energy and clean water, protecting and restoring the environment, and reducing dependence on foreign energy sources, thereby increasing U.S. energy security. The strategic objective was to advance continued use of domestic fossil fuels as a mainstay of U.S. energy production by making fossil energy systems nonpolluting and more efficient, capturing and sequestering greenhouse gases, and integrating the use of fossil and renewable energy sources into the energy mix. The research achievements from this partnership have exceeded the goals and objectives by contributing substantially to the development of science-based energy and environmental policy, educational foundations for science and technology, and commercialization and international marketing of energy technologies. The program comprised 75 individual projects, which included basic/applied fossil energy research projects involving no cost share and development, demonstration, and commercialization projects (many derived from applied research projects) that included nonfederal cost share of approximately 40% (the contractually required minimum level of cumulative nonfederal cost share was 29%). In all, 32,798,698 of federal funding was leveraged with industry cash and in-kind cost share of 21,697,129 from 80 nonfederal partners for a total of 54,495,827 of funded research that 1) advanced the development of unconventional tight oil resources in the Bakken Formation; 2) demonstrated the application of CO 2 Storage and EOR in tight oil formations; 3) developed advanced carbon capture technology; 4) addressed key application and infrastructure concerns for commercial deployment of CO 2 ; 5) demonstrated innovative, integrated water management strategies for energy development projects; 6) developed novel pollution control technologies for mercury and hazardous air pollutants; and 7) performed world-class outreach and dissemination of research results to industry partners and other stakeholders. These outcomes speak to the valuable return on the substantial investment in this program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.

10 SYNTHETIC FUELS↗

SUBTASK 6.1 – STRATEGIC STUDIES

The Energy & Environmental Research Center (EERC) has recently completed 7 years of research through the Cooperative Agreement with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) focused on fossil energy technology development and demonstration. To support a significant number of the different activities being considered within all of our research contracts with NETL, a subtask (6.1 – Strategic Studies) was created to focus on small research efforts that came up throughout the year that would support an existing EERC–NETL project or would help to develop a new concept for inclusion in future efforts. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FC26- 08NT43291

01 COAL, LIGNITE, AND PEAT↗

Subtask – CO 2 storage and enhanced bakken recovery research program

Small improvements in productivity could increase technically recoverable oil in the Bakken Petroleum System by billions of barrels. The use of CO 2 for enhanced oil recovery (EOR) in tight oil reservoirs is a relatively new concept. The large-scale injection of CO 2 into the Bakken would also result in the geological storage of significant amounts of CO 2 . The Energy & Environmental Research Center (EERC) has conducted laboratory and modeling activities to examine the potential for CO 2 storage and EOR in the Bakken. Specific activities included the characterization and subsequent modeling of North Dakota study areas as well as dynamic predictive simulations of possible CO 2 injection schemes to predict the potential CO 2 storage and EOR in those areas. Laboratory studies to evaluate the ability of CO 2 to remove hydrocarbons from Bakken rocks and determine minimum miscibility pressures for Bakken oil samples were conducted. Data from a CO 2 injection test conducted in the Elm Coulee area of Montana in 2009 were evaluated with an eye toward the possible application of knowledge gained to future injection tests in other areas. A first-order estimation of potential CO 2 storage capacity in the Bakken Formation in North Dakota was also conducted. Key findings of the program are as follows. The results of the research activities suggest that CO 2 may be effective in enhancing the productivity of oil from the Bakken and that the Bakken may hold the ability to geologically store between 120 Mt and 3.2 Gt of CO 2 . However, there are no clear-cut answers regarding the most effective approach for using CO 2 to improve oil productivity or the storage capacity of the Bakken. The results underscore the notion that an unconventional resource will likely require unconventional methods of both assessment and implementation when it comes to the injection of CO 2 . In particular, a better understanding of the fundamental mechanisms controlling the interactions between CO 2 , oil, and other reservoir fluids in these unique formations is necessary to develop accurate assessments of potential CO 2 storage and EOR in the Bakken. In addition, existing modeling and simulation software packages do not adequately address or incorporate the unique properties of these tight, unconventional reservoirs in terms of their impact on CO 2 behavior. These knowledge gaps can be filled by conducting scaled-up laboratory activities integrated with improved modeling and simulation techniques, the results of which will provide a robust foundation for pilot-scale field injection tests. Finally, field-based data on injection, fluid production, and long-term monitoring from pilot-scale CO 2 injection tests in the Bakken are necessary to verify and validate the findings of the laboratory- and modeling-based research efforts. This subtask was funded through the EERC–U.S. Department of Energy (DOE) Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FC26-08NT43291. Nonfederal funding was provided by the North Dakota Industrial Commission, Marathon Oil Corporation, Continental Resources Inc., and TAQA North, Ltd.

54 ENVIRONMENTAL SCIENCES↗