ECLSS consumables analysis: ALT captive/active 1 and captive/active 3
A consumables analysis of the environmental control and life support system (ECLSS) was performed for approach and landing test (ALT) captive/active missions 1 through 3 and is also applicable to missions 4 and 5. The ECLSS configuration analyzed and the guidelines and assumptions used in performing the analysis are presented. A projection of ammonia temperatures and pressures during the captive/active 1 mission is also included. The resulting consumables, budgets are presented in tabular and graphic form. Adequate margins were obtained for all systems.