Using Historical Cost and Schedule Data to Predict Cost Risk for Future NASA X-Planes

Accurate cost estimates help managers understand critical cost-risk information, which improves their perception of the impact project changes have on the budget and schedule. This research project examined buffer reserves, a key aspect of cost estimation. The main focus of this project was to utilize historical data to calculate the extent to which NASA programs typically exceed their original buffers.

cost analysis↗

NASA's X-Plane Database and Parametric Cost Model v 2.0

The NASA Armstrong Cost Engineering Team with technical assistance from NASA HQ (SID)has gone through the full process in developing new CERs from Version #1 to Version #2 CERs. We took a step backward and reexamined all of the data collected, such as dependent and independent variables, cost, dry weight, length, wingspan, manned versus unmanned, altitude, Mach number, thrust, and skin. We used a well- known statistical analysis tool called CO$TAT instead of using "R" multiple linear or the "Regression" tool found in Microsoft Excel(TradeMark). We setup an "array of data" by adding 21" dummy variables;" we analyzed the standard error (SE) and then determined the "best fit." We have parametrically priced-out several future X-planes and compared our results to those of other resources. More work needs to be done in getting "accurate and traceable cost data" from historical X-plane records!

life cycle cost↗

X-1 to X-Wings: Developing a Parametric Cost Model

In todays cost-constrained environment, NASA needs an X-Plane database and parametric cost model that can quickly provide rough order of magnitude predictions of cost from initial concept to first fight of potential X-Plane aircraft. This paper takes a look at the steps taken in developing such a model and reports the results. The challenges encountered in the collection of historical data and recommendations for future database management are discussed. A step-by-step discussion of the development of Cost Estimating Relationships (CERs) is then covered.

parametric cost model↗

Civil Service Workforce Market Supply and the Effect on the Cost Estimating Relationships (CERs) that may effect the Productivity Factors for Future NASA Missions

The upcoming retirement of the Baby Boomers on the horizon will leave a performance gap between younger generation (the future NASA decision makers) and the gray beards. This paper will reflect on the average age of workforce across NASA Centers, the Aerospace Industry and other Government Agencies, like DoD. This papers will dig into Productivity and Realization Factors and how they get applied to bimonthly (payroll data) for true FTE calculations that could be used at each of the NASA Centers and other business systems that are on the forefront in being implemented. This paper offers some comparative costs solutions, from simple - full time equivalent (FTE) cost estimating relationships CERs, to complex - CERs for monthly time-phasing activities for small research projects that start and get completed within a government fiscal year. This paper will present the results of a parametric study investigating the cost-effectiveness of different alternatives performance based cost estimating relationships (CERs) and how they get applied into the Center s forward pricing rate proposals (FPRP). True CERs based on the relationship of a younger aged workforce will have some effects on labor rates used in both commercial cost models and internal home-grown cost models which may impact the productivity factors for future NASA missions.

Sterk, Steve↗

Civil Service Workforce Market Supply and the Effect on Cost Estimating Relationship (CERS) that May Effect the Productivity Factors for Future NASA Missions

The upcoming retirement of the Baby Boomers will leave a workforce age gap between the younger generation (the future NASA decision makers) and the gray beards. This paper will reflect on the average age of the workforce across NASA Centers, the Aerospace Industry and other Government Agencies, like DoD. This paper will dig into Productivity and Realization Factors and how they get applied to bi-monthly (payroll) data for true full-time equivalent (FTE) calculations that could be used at each of the NASA Centers and other business systems that are on the forefront in being implemented. This paper offers some comparative costs analysis/solutions, from simple FTE cost-estimating relationships (CERs) versus CERs for monthly time-phasing activities for small research projects that start and get completed within a government fiscal year. This paper will present the results of a parametric study investigating the cost-effectiveness of alternative performance-based CERs and how they get applied into the Center's forward pricing rate proposals (FPRP). True CERs based on the relationship of a younger aged workforce will have some effects on labor rates used in both commercial cost models and other internal home-grown cost models which may impact the productivity factors for future NASA missions.

Sterk, Steve↗