Evaluation of Graphite/h-BN Bimaterials for Electric Propulsion
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Steven M. Arestie.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The AEPS contract was awarded to AR in May of 2016 with the goal of developing a 12.5kW Hall Thruster System, including the Hall Current Thruster (HCT), Power Processor Unit (PPU) and Xenon Flow Controller (XFC). It was originally targeted to support the Asteroid Redirect Mission, which was cancelled early in the project. The project was subsequently restructured to support the Gateway PPE propulsion mission, with modified scope that consisted of the development, qualification and delivery of three 12kW flight thrusters. The PPU and XFC components were designed and development hardware fabricated with initial testing performed prior to being de-scoped from the contract. System level testing was performed by AR using these engineering components in early 2022 at the Aerospace Corporation’s EP-3 test facility.