Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Needs and Opportunities for Testing of Hydropower Technology Innovations

Despite hydropower’s status as a well-established technology, changes in the global energy sector have prompted a variety of necessary hydropower technological innovations. Examples include efficient lowhead turbines, more flexible and dispatchable hydropower and pumped storage systems to complement variable and intermittent renewable resources, and technologies providing higher environmental performance. However, while innovative technologies are currently being proposed to meet these development challenges, small hydropower facility owners do not have sufficient risk-bearing capacity to adopt new, unvalidated technologies. This discourages manufacturers from bringing nascent technologies to market and stalls the technological growth of the sector. To reduce the risks associated with new technologies and promote further innovation, systemic (and sometimes unconventional) validation activities and new testing capabilities for hydropower are highly desired. These testing capabilities must demonstrate the safety, environmental acceptability, reliability, and performance of innovative technologies to quantify their value compared with existing technologies. Establishing these capabilities through dedicated testing facilities will be key to promoting hydropower growth in the United States. Following direction from the House Energy and Water Development Committee, the US Department of Energy’s Water Power Technologies Office (WPTO) has been tasked with understanding the state of hydropower testing in the United States. This scoping report discusses the needs and opportunities of hydropower testing in the United States, with a specific focus on small hydropower. Future developments will likely mostly target low-head sites with less than 30 ft (9.1 m) from new stream-reach developments, non-powered dam retrofits, and rehabilitation/upgrade of existing plants.

13 HYDRO ENERGY↗

The waterSHED Model: User Guide

The ideal design and operation of small hydropower plants is a complex optimization problem with economic, social, and environmental objectives. The waterSHED (Water Allocation Tool Enabling Rapid Small Hydropower Environmental Design) model is a user-friendly tool that allows hydropower stakeholders to model the trade-offs among these objectives using the Standard Modular Hydropower (SMH) framework. The SMH framework employs modular technologies that can be represented as blackbox objects and combined within a river to create a hydropower facility. For a given site, the waterSHED model aims to determine which modules should be placed in a facility and how those modules should be operated. This user guide describes how to use the graphical user interface and related functionalities. This document also summarizes the background research and mathematical formulations that are explained indepth in the accompanying doctoral dissertation. This model is an early step toward a new hydropower design process that employs standardization and modularity to reduce costs, development timelines, and challenges regarding social and environmental mitigation measures for low-head, small hydropower development. The waterSHED model is a Python application that will require the ability to download a GitHub repository, import the necessary packages, and run a set of Python script files using an integrated development environment. The script produces a graphical user interface to coordinate inputs, simulate operation, and visualize results, so no coding experience is needed once the script is running. Additionally, the waterSHED Workbook is a Microsoft Excel file that works with the Python script to facilitate data entry

13 HYDRO ENERGY↗

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Executive Summary on Current Practice and Innovation Opportunities for Low-Head Applications

The following content provides a companion executive summary of Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications (DeNeale et al. 2020), a technical report developed by Oak Ridge National Laboratory (ORNL) and Knight Piésold Consulting, with funding from the US Department of Energy (DOE) Water Power Technologies Office (WPTO). This executive summary provides a brief synopsis of the broader information contained in the technical report. This study (and the associated technical report): (1) covers background information on hydropower; (2) describes various characteristics relevant to hydropower foundations for undeveloped US streams; (3) presents the current state of practice in foundation development; (4) provides a representative assessment of conventional hydropower foundation costs and timelines; (5) addresses key challenges facing conventional hydropower foundations; and (6) presents opportunity areas and examples for innovative hydropower foundation technologies while highlighting some advances in non-hydropower industries.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Current State-of-Practice in Dam Safety Risk Assessment

Dams provide significant benefits to the nation, serving as critical infrastructure to deliver water retention and control throughout the United States (US). Major cities could not function without the fresh water supply stored in dammed reservoirs, and many electrical systems rely on dependable hydroelectric power supply. Dams on rivers across the country protect communities against destructive flood impacts while providing navigable waters for transportation, irrigation for agriculture, and various opportunities for recreation. While dams provide many essential services, dam failure flooding can present significant risks to property and life. Over decades of experience, dam safety practices, including risk assessment, have evolved as engineering knowledge, scientific understanding, and technological advancements grow. This project summarizes the current state-of-practice in dam safety risk assessment.

13 HYDRO ENERGY↗

Current State-of-Practice in Dam Safety Risk Assessment

Dams provide significant benefits to the nation, serving as critical infrastructure to deliver water retention and control throughout the United States (US). Major cities could not function without the fresh water supply stored in dammed reservoirs, and many electrical systems rely on dependable hydroelectric power supply. Dams on rivers across the country protect communities against destructive flood impacts while providing navigable waters for transportation, irrigation for agriculture, and various opportunities for recreation. While dams provide many essential services, dam failure flooding can present significant risks to property and life. Over decades of experience, dam safety practices, including risk assessment, have evolved as engineering knowledge, scientific understanding, and technological advancements grow. This project summarizes the current state-of-practice in dam safety risk assessment.

42 ENGINEERING↗

Water Quality Projects Summary for the Mid-Columbia and Cumberland River Systems

Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge National Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods. These efforts were designed to incorporate well into existing hydropower and reservoir system scheduling models, with runtimes that are comparable to existing software tools. In addition, the transferability of these tools to assess other systems is enhanced due the use of simplistic and easily attainable values for inputs, straight-forward calibration of predictive equation coefficients, and standardized comparison of traditionally familiar outputs.

54 ENVIRONMENTAL SCIENCES↗

A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

13 HYDRO ENERGY↗

Exemplary Design Envelope Specification for Standard Modular Hydropower Technology

Hydropower is an established, affordable renewable energy generation technology supplying nearly 18% of the electricity consumed globally. A hydropower facility interacts continuously with the surrounding water resource environment, causing alterations of varying magnitude in the natural flow of water, energy, fish, sediment, and recreation upstream and downstream. A universal challenge in facility design is balancing the extraction of useful energy and power system services from a stream with the need to maintain ecosystem processes and natural environmental function. On one hand, hydroelectric power is a carbon-free, renewable, and flexible asset to the power system. On the other, the disruption of longitudinal connectivity and the artificial barrier to aquatic movement created by hydraulic structures can produce negative impacts that stress fresh water environments. The growing need for carbon-free, reliable, efficient distributed energy sources suggests there is significant potential for hydropower projects that can deploy with low installed costs, enhanced ecosystem service offerings, and minimal disruptions of the stream environment.

13 HYDRO ENERGY↗

Total Dissolved Gas Prediction and Optimization in RIVERWARE

Management and operation of dams within the Columbia River Basin (CRB) provides the region with irrigation, hydropower production, flood control, navigation, and fish passage. These various system-wide demands can require unique dam operations that may result in both voluntary and involuntary spill, thereby increasing tailrace levels of total dissolved gas (TDG) which can be fatal to fish. Appropriately managing TDG levels within the context of the systematic demands requires a predictive framework robust enough to capture the operationally related effects on TDG levels. Development of the TDG predictive methodology herein attempts to capture the different modes of hydro operation, thereby making it a viable tool to be used in conjunction with a real-time scheduling model such as RiverWare. The end result of the effort will allow hydro operators to minimize system-wide TDG while meeting hydropower operational targets and constraints. The physical parameters such as spill and hydropower flow proportions, accompanied by the characteristics of the dam such as plant head levels and tailrace depths, are used to develop the empirically-based prediction model. In the broader study, two different models are developed a simplified and comprehensive model. The latter model incorporates more specific bubble physics parameters for the prediction of tailrace TDG levels. The former model is presented herein and utilizes an empirically based approach to predict downstream TDG levels based on local saturation depth, spillway and powerhouse flow proportions, and entrainment effects. Representative data collected from each of the hydro projects is used to calibrate and validate model performance and the accuracy of predicted TDG uptake. ORNL, in conjunction with IIHR - Hydroscience & Engineering, The University of Iowa, carried out model adjustments to adequately capture TDG levels with respect to each plant while maintaining a generalized model configuration. Validation results indicate excellent model performance with coefficient of determination values exceeding 92% for all sites. This approach enables model extension to an increasingly wider array of hydropower plants, i.e., with the proper data input, TDG uptake can be calculated independent of actual physical component design. The TDG model is used as a module in the systematic optimization framework of RiverWare, a river and reservoir modeling tool used by federal agencies, public utility districts, and other dam owners and operators to forecast, schedule, and manage hydropower assets. The integration and testing of the TDG module within RiverWare, led by University of Colorado's Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), will allow users to generate optimum system schedules based on the minimization of TDG. Optimization analysis and added value will be quantified as system wide reductions in TDG achieved while meeting existing hydropower constraints. Future work includes the development of a method to predict downstream reservoir forebay TDG levels as a function of upstream reservoir tailrace TDG values based on river hydrodynamics, hydro operations, and reservoir characteristics. Once implemented, a holistic model that predicts both TDG uptake and transport will give hydropower operators valuable insight into how system-wide environmental effects can be mitigated while simultaneously balancing stakeholder interests.

13 HYDRO ENERGY↗

The Economic Benefits Of Multipurpose Reservoirs In The United States- Federal Hydropower Fleet

The United States is home to over 80,000 dams, of which approximately 3% are equipped with hydroelectric generating capabilities. When a dam serves as a hydropower facility, it provides a variety of energy services that range from clean, reliable power generation to load balancing that supports grid stability. In most cases, the benefits of dams and their associated reservoirs go far beyond supporting the nation s energy demand. As evidenced by the substantial presence of non-powered dams with the ability to store water in large capacities, the primary purpose of a dam may not be hydropower, but rather one of many other purposes. A dam and reservoir may support navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit providing significant social and economic impacts on a local, regional, and national level. When hydropower is one of the services provided by a multipurpose reservoir, it is then part of an integrated system of competing uses. Operating rules, management practices, consumer demands, and environmental constraints must all be balanced to meet the multipurpose project s objectives. When federal dams are built, they are authorized by Congress to serve one or more functions. Legislation such as the Water Resources Development Act regulates the operation of the facility in order to coordinate the authorized uses and ensure the dam s intended objectives are being met. While multipurpose reservoirs account for billions of dollars in contributions to National Economic Development (NED) every year, no attempt has been made to evaluate their benefits on a national scale. This study is an on-going work conducted by Oak Ridge National Laboratory in an effort to estimate the economic benefits of multipurpose hydropower reservoirs in the United States. Given the important role that federal hydropower plays in the U.S., the first focus of this research will target the three main federal hydropower owners Tennessee Valley Authority, U.S. Army Corps of Engineers, and U.S. Bureau of Reclamation. Together these three agencies own and operate 157 powered dams which account for almost half of the total installed hydropower capacity in the U.S. Future work will include engaging publicly-owned utilities and the private sector in order to quantify the benefits of all multipurpose hydropower reservoirs in the U.S.

13 HYDRO ENERGY↗

New Stream-reach Development: A Comprehensive Assessment of Hydropower Energy Potential in the United States

The rapid development of multiple national geospatial datasets related to topography, hydrology, and environmental characteristics in the past decade have provided new opportunities for the refinement of hydropower resource potential from undeveloped stream-reaches. Through 2011 to 2013, the Oak Ridge National Laboratory (ORNL) was tasked by the Department of Energy (DOE) Water Power Program to evaluate the new stream-reach development (NSD) resource potential for more than 3 million US streams. A methodology was designed that contains three main components: (1) identification of stream-reaches with high energy density, (2) topographical analysis of stream-reaches to estimate inundated surface area and reservoir storage, and (3) environmental attribution to spatially join information related to the natural ecological systems, social and cultural settings, policies, management, and legal constraints to stream-reaches of energy potential. An initial report on methodology (Hadjerioua et al., 2013) was later reviewed and revised based on the comments gathered from two peer review workshops.After implementing the assessment across the entire United States, major findings were summarized in this final report. The estimated NSD capacity and generation, including both higher-energy-density (>1 MW per reach) and lower-energy-density (<1 MW per reach) stream-reaches is 84.7 GW, around the same size as the existing US conventional hydropower nameplate capacity (79.5 GW; NHAAP, 2013). In terms of energy, the total undeveloped NSD generation is estimated to be 460 TWh/year, around 169% of average 2002–2011 net annual generation from existing conventional hydropower plants (272 TWh/year; EIA, 2013). Given the run-of-river assumption, NSD stream-reaches have higher capacity factors (53–71%), especially compared with conventional larger-storage peaking-operation projects that usually have capacity factors of around 30%. The highest potential is identified in the Pacific Northwest Region (32%), followed by Missouri Region (15%) and California Region (9%). In terms of states, the highest potential is found in Oregon, Washington, and Idaho, the three states in the Pacific Northwest, followed by California, Alaska, Montana, and Colorado. In addition to the resource potential, abundant environmental attributes were also organized and attributed to the identified stream-reaches to support further hydropower market analysis. The prevalence of environmental variables and proportion of capacity from stream-reaches intersecting environmental variables varied according to hydrologic region. Detailed NSD findings are organized by hydrologic regions and presented in each chapter of this report.

Kao, Shih-Chieh↗