Acceleration of uranium beam to record power of 10.4 kW and observation of new isotopes at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) is a major nuclear physics facility for research with fast, stopped, and reaccelerated beams that was successfully commissioned in May 2022. A key capability of FRIB is the production of an acceleration of the uranium beam, but this capability requires the facility to work at the design limits of the lowest charge-to-mass ratio and the highest power density on the beam intercepting devices. This paper presents techniques for overcoming the significant challenges in accelerating the uranium beam, culminating in the demonstration of 10.4 kW on target, and the discovery of three new isotopes. The high-power uranium beam enabled us to produce and identify G 88 a , A 93 s , and S 96 e , within the first 24 h of operation. The successful uranium operation at FRIB sets a new record for accelerated uranium beam power above 10 kW and opens a new avenue of research with rare isotopes. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Observation of New Isotopes in the Fragmentation of Pt 198 at FRIB

Five previously unknown isotopes ( 182,183 Tm, 186,187 Yb, 190 Lu) were produced, separated, and identified for the first time at the Facility for Rare Isotope Beams (FRIB) using the Advanced Rare Isotope Separator (ARIS). The new isotopes were formed through the interaction of a 198 Pt beam with a carbon target at an energy of 186 MeV/u and with a primary beam power of 1.5 kW. Event-by-event particle identification of A, Z, and q for the reaction products was performed by combining measurements of the energy loss, time of flight, magnetic rigidity Bρ, and total kinetic energy. The ARIS separator has a novel two-stage design with high resolving power to strongly suppress contaminant beams. Finally, this successful new isotope search was performed less than one year after FRIB operations began and demonstrates the discovery potential of the facility which will ultimately provide 400 kW of primary beam power.

07 ISOTOPE AND RADIATION SOURCES↗

Abrasion-fission reactions at intermediate energies

The availability of high-intensity, heavy-ion beams coupled to sensitive, large solid-angle acceptance spectrometers has enabled a detailed examination of the fission fragments produced in induced-fission reactions. The abrasion fission process involves the formation of projectile-like prefragments in violent nuclear collisions at relative energies in excess of 100 MeV/u. At intermediate energies below this threshold, experiments suggest a change in the prefragment kinematic qualities. Information regarding the influence of this transitional phase upon the evolution of nuclei approaching the point of scission is scarce. In this article, data are presented for over 200 nuclei from nickel to palladium produced in abrasion-fission reactions of a 80 MeV/u 238 U beam. Cross sections were obtained following yield measurements performed for the principal charge states of the identified fission fragments and a detailed analysis of the ion transmission. A full kinematic analysis of the fission fragments has been performed using the LISE ++ software package, where the trajectory of an ion passing through a spectrometer can be reconstructed based upon measurements at the focal plane. Furthermore, the results obtained at the S800 spectrograph are compared with predictions obtained with a three-fission progenitor (3EER) model. Systematic studies of fission-fragment properties continue to provide a valuable experimental benchmark for theoretical efforts directed toward describing this complex decay channel, that is important in the context of planning experiments to explore the neutron-rich region of the nuclear chart at rare-isotope beam facilities.

59 ≤ A ≤ 8990 ≤ A ≤ 149↗

Probing spin-isospin excitations in proton-rich nuclei via the C 11 ( p , n ) N 11 reaction

Tracking the evolution of nuclear properties away from stability serves as a valuable test for nuclear models. In the present work, the (p,n) charge-exchange reaction was used to test the extraction of β- Gamow-Teller transition strengths, B(GT), from proton-rich unstable isotopes, and the resulting B(GT) values were compared to shell-model and ab-initio calculations. The 11 C(p,n) 11 N reaction was measured in inverse kinematics at 95 MeV/u at the National Superconducting Cyclotron Laboratory (NSCL). The B(GT) values to the $\frac{1^-}{2}$ state at 0.73 MeV and the $\frac{3^-}{2}$ state at 2.86 MeV in 11 N were determined to be 0.18(1) stat (3) sys and 0.18(1) stat (4) sys , respectively. These results are consistent with shell-model calculations using the wbp interaction after introducing a phenomenological quenching factor and with ab initio variational Monte Carlo calculations using the NV2 + 3Ia * NN and 3N interactions without any scaling. Additionally, this result is consistent with the B(GT) values extracted from mirror 11 B(n,p) and 11 B(t, 3 He) reactions. In conclusion, this experiment demonstrates the feasibility of using the (p,n) probe in inverse kinematics to extract B(GT) from proton-rich nuclei, although improved background suppression will be important in future experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Design of the High Rigidity Spectrometer at FRIB

A High Rigidity Spectrometer (HRS) has been designed for experiments at the Facility for Rare-Isotope Beams (FRIB) at Michigan State University (MSU). The HRS will allow experiments to be performed with the most exotic neutron-rich isotopes at high beam energies (≳100 MeV/u). The HRS consists of an analysis beamline called the High-Transmission Beamline (HTBL) and the spectrometer proper called the Spectrometer Section. Here, the maximum magnetic rigidity of the HRS is 8 Tm, which corresponds to the rigidities at which rare-isotope beams are optimally produced at FRIB. The resolving power, angular acceptance, and momentum acceptance are set to match the anticipated scientific program. An ion-optical design developed for the HRS is described in detail, along with the specifications of the associated magnet and detector systems.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Radiological Characterization of Hard to Measure Nuclides Using Accelerator Mass Spectrometry (AMS) - 20140

In this project irradiated heavy concrete was characterized regarding hard to measure nuclides like Ca-41 using Accelerator Mass Spectrometry (AMS). Concrete samples were irradiated with a known neutron flux and the Ca-41 content was investigated via AMS measurements. The comparison of the results with calculations shows a very good agreement in the Ca-41 content. The project revealed that AMS can be used to characterize irradiated concrete and contributes to improve the methodological basis of the radiological characterization and to extending the validation of nuclide vectors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rate of change of the Quincy-Monument Peak baseline from a translocation analysis of Lageos laser range data

Translocation studies of Lageos laser range data from Quincy and Monument Peak in California observed during 1984-1987 suggest that plate tectonic motion across the San Andreas fault system in the direction of the baseline between the two stations is uniform at a rate of -30(+ or - 3) mm/yr. Changes in the components of the baseline vector were inferred from repeat determinations using the solutions from successive 0.5-year intervals. The changes in the vertical and transverse components of the Quincy-Monument Peak baseline are -0.4(+ or - 5) mm/yr and +14(+ or -5) mm/yr, respectively. The vertical component determinations attest to the height stability of the laser ranging method. Lageos measurements made from Quincy and Monument Peak before 1984 are inaccurate enough to limit their usefulness for plate tectonic studies.

Stolz, A.↗

Results of the Australian geodetic VLBI experiment

The 250-2500 km baseline vectors between radio telescopes located at Tidbinbilla (DSS43) near Canberra, Parkes, Fleurs (X3) near Sydney, Hobart and Alice Springs were determined from radio interferometric observations of extragalactic sources. The observations were made during two 24-hour sessions on 26 April and 3 May 1982, and one 12-hour night-time session on 28 April 1982. The 275 km Tidbinbilla - Parkes baseline was measured with an accuracy of plus or minus 6 cm. The remaining baselines were measured with accuracies ranging from 15 cm to 6 m. The higher accuracies were achieved for the better instrumented sites of Tidbinbilla, Parkes and Fleurs. The data reduction technique and results of the experiment are discussed.

Harvey, B. R.↗

Crustal deformation at very long baseline interferometry sites due to seasonal air-mass and ground water variations

The seasonal deformation normal to the Earth's surface was calculated at stations involved or interested in very long baseline interferometry (VLBI) geodesy and at hypothetical sites in Australia and Brazil using global atmospheric pressure data, values for groundwater storage, and load Love numbers deduced from current Earth models. It was found that the annual range of deformation approached the centimeter level measuring potential of the VLBI technqiue at Greenbank, Haystack, and the Brazil site.

Stolz, A.↗

Earth rotation measured by lunar laser ranging

The estimated median accuracy of 194 single-day determinations of the earth's angular position in space is 0.7 millisecond (0.01 arc second). Comparison with classical astronomical results gives agreement to about the expected 2-millisecond uncertainty of the 5-day averages obtained by the Bureau International de l'Heure. Little evidence for very rapid variations in the earth's rotation is present in the data.

Stolz, A.↗