Waste Compliance and Tracking System (WCATS): Project Deep Dive [Slides]
Abstract not provided.
Engineering topics
Publications and source records attributed to Story-Hughes, Sandra Dee.
Abstract not provided.
7 Wall-to-wall inventories were completed between October 2 – December 11, 2023. The team viewed 12 technical areas. A total of 280 containers were verified against current WCATS data. We worked with WMCs team to schedule for all waste throughout WFO FOD. WMCs are doing an incredible job with keeping up with all their locations; The team only found one discrepancy that was resolved the same day, and The WMC also took the time to explain their process on how containers are labeled with closure days and why it was labeled as such.
8 Wall-to-wall inventories were completed between July 3rd – September 20th, 2023. The scheduling was broken down by FODs, and the team completed UI and IF. The team viewed 12 sites across 7 technical areas. A total of 249 containers were verified against current WCATS data. 2 containers were unable to be verified due to lack of WMC response. We worked with WMCs and Environmental Stewardship teams this quarter to schedule the wall-to-wall inventories. Discrepancies that were found were fixed by the WMCs in a timely manner. Most of the discrepancies were Labeling issues which were resolved the day of the walk down or within a week.