Search NASA⌕ Search

Engineering topics

Stover, J. B.

Publications and source records attributed to Stover, J. B..

Quaternary pulse position modulation electronics for free-space laser communications

The development of a high data-rate communications electronic subsystem for future application in free-space, direct-detection laser communications is described. The dual channel subsystem uses quaternary pulse position modulation (GPPM) and operates at a throughput of 650 megabits per second. Transmitting functions described include source data multiplexing, channel data multiplexing, and QPPM symbol encoding. Implementation of a prototype version in discrete gallium arsenide logic, radiofrequency components, and microstrip circuitry is presented.

Budinger, J. M.↗

Quaternary pulse position modulation electronics for free-space laser communications

The development of a high data-rate communications electronic subsystem for future application in free-space, direct-detection laser communications is described. The dual channel subsystem uses quaternary pulse position modulation (QPPM) and operates at a throughput of 650 megabits per second. Transmitting functions described include source data multiplexing, channel data multiplexing, and QPPM symbol encoding. Implementation of a prototype version in discrete gallium arsenide logic, radiofrequency components, and microstrip circuitry is presented.

Budinger, J. M.↗

Bit error rate testing of a proof-of-concept model baseband processor

Bit-error-rate tests were performed on a proof-of-concept baseband processor. The BBP, which operates at an intermediate frequency in the C-Band, demodulates, demultiplexes, routes, remultiplexes, and remodulates digital message segments received from one ground station for retransmission to another. Test methods are discussed and test results are compared with the Contractor's test results.

Stover, J. B.↗

Photovoltaic power system tests on an 8-kilowatt single-phase line-commutated inverter

Efficiency and power factor were measured as functions of solar array voltage and current. The effects of input shunt capacitance and series inductance were determined. Tests were conducted from 15 to 75 percent of the 8 kW rated inverter input power. Measured efficiencies ranged from 76 percent to 88 percent at about 50 percent of rated inverter input power. Power factor ranged from 36 percent to 72 percent.

Stover, J. B.↗

System tests with electric thruster beam and accelerator directly powered from laboratory solar arrays

Laboratory high voltage solar arrays were operated directly connected to power the beam and accelerator loads of an 8-centimeter ion thruster. The beam array comprised conventional 2 by 2 centimeter solar cells; the accelerator array comprised multiple junction edge-illuminated solar cells. Conventional laboratory power supplies powered the thruster's other loads. Tests were made to evaluate thruster performance and to investigate possible electrical interactions between the solar arrays and the thruster. Thruster performance was the same as with conventional laboratory beam and accelerator power supplies. Most of the thruster beam short circuits that occurred during solar array operation were cleared spontaneously without automatic or manual intervention. No spontaneous clearing occurred during conventional power supply operation.

Stover, J. B.↗

Effect of Thrustor Arcing on Ion Rocket System Design

Arcing between the electrodes of an ion rocket thrustor is investigated for the effect it will have on the overall design of ion rocket systems. The effect of generator, transformer, and inserted impedances on system stability and efficiency, and on operating lifetime of thrustor components are considered. Rate of arcing, preferential arc paths, speed of arc interruption, and response of thrustors to voltage transients are also discussed. The study indicates that arcing is a system hazard and that arcing rates are of prime importance in the design and development of thrustors, thrustor arrays, and system components. Two system models for reducing the hazard are proposed, based on principles developed herein, published data, and experience available from operation of nine-module electron-bombardment thrustor array. Experimental investigation of these models is presently underway.

THRUSTOR↗