Search NASA⌕ Search

Engineering topics

Stutzman, M.

Publications and source records attributed to Stutzman, M..

Towards large phase space beams at the CEBAF injector

We report on the status of a degrader device to generate large phase space beams for machine acceptance studies in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The degrader device consists of thin, low-Z targets to degrade the electron beam phase space through multiple scattering, two apertures to define the maximum transverse emittance, and a solenoid to aid in matching to the rest of the injector beamline. The engineering design of the degrader device and projected degraded beam phase space parameters are presented.

Sy, A.↗

Inverted Geometry Ceramic Insulators in High Voltage DC Electron Guns for Accelerators

A direct current (dc) high voltage photo-emission electron gun operating at 130 kV is utilized at the Jefferson Lab (JLab) Continuous Electron Beam Accelerator Facility to generate spin-polarized electrons for nuclear physics experiments. Over the past decade, JLab has tested and implemented inverted-geometry ceramic insulators in photoguns, connecting the cathode electrode in vacuum to the high voltage power supply using commercial high voltage cables. This contribution reports on tests performed up to 375 kV dc, implementation of inverted insulators in a 300 kV dc photogun generating magnetized electron beams, and describes plans to develop a reliable insulator-cable connector for applying 500 kV dc to a future polarized beam photogun operating reliably and without field emission at 350 kV.

Hernandez-Garcia, C.↗

Reduction of waveguide vacuum trips in CEBAF accelerating cavities with a combination ion pump and non-evaporable getter pump

Pressure spikes in the fundamental power coupler waveguide are a significant source of trips during the operation of both original and refurbished superconducting radio-frequency cavities installed in the CEBAF accelerator. In its original configuration, two waveguides from a cavity-pair are connected to a single 32 l/s ion pump. In 2017 a new cavity-pair was installed in a refurbished cryomodule in which a NEXTorr® D200-5 combination ion pump and non-evaporable getter pump was installed for each waveguide. It is shown that hydrogen is the dominant residual gas in the waveguide and simulations with Molflow+ indicated that the new pumping scheme allows reducing the pressure at the end of the waveguide by a factor of ~5 , compared to the original configuration. In conclusion, the new cavity-pair has been operating in CEBAF for a total of 431 days and it only had a total of 3 trips due to vacuum spikes in the waveguide.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗