Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

PIP-II High Beta 650 Prototype Cryomodule Assembly Experience and Related Design Optimization

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

Ozelis, J.↗

Nitrogen precooling heat exchanger replacement and control system upgrade in superfluid cryoplant at CMTF

Liquid nitrogen precooling is used in most cryoplants to achieve cooldown to 80 K temperature range. In one such system at Fermilab’s CMTF superfluid cryoplant, where the helium supply directly exchanges heat with liquid nitrogen, freezing of nitrogen occurred inside the heat exchanger due to heat exchanger flow imbalance during a cryoplant trip. Trapped vapor pockets of nitrogen within the frozen heat exchanger channels were formed while warming up the heat exchanger, creating high localized pressure and subsequent damage/rupture of the heat exchanger. Replacement of the heat exchanger was done, and modifications were made in the system to rectify future occurrences. The control system was updated to bypass the heat exchanger entirely if the incoming helium stream temperature drops below 76 K. This was done by repurposing two control valves as heat exchanger bypass valves that were previously used for a redundant 80 K adsorber in the coldbox. Additional modifications were made to further prevent return of large amount of cold helium gas from cold end during abrupt cryoplant shutdown. This modification has ensured high reliability of heat exchanger with prevention of freezing of nitrogen which can damage the heat exchanger.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

Design of Muon Campus full flow purifier for varying operational conditions and horizontal shipping

Constant ingress of impurities in Muon Campus g-2 experiment at Fermilab has resulted in reduction of efficiency of cryogenic expanders and occasional undesired downtime to flush the impurities. Due to insufficiency of current 0.06 kg/s mobile purifier, a full flow purifier is designed to be used in Muon Campus which purifies 0.24 kg/s of Helium throughput of 4 compressors through charcoal bed at 80 K and returns ambient Helium back to the system. The purifier is designed to be operated near liquid Nitrogen temperature during cold operations and up to 400 K during regeneration. Both warm and cold operational range of the purifier has required use of appropriate clearances in design due to expansion and contraction. The vessel of around 5.5 m height which is designed to be operated vertically is to be shipped horizontally. The asymmetrical position of heavy stainless steel heat exchanger in the purifier support frame and 5g vertical load design consideration for shipping has required use of shipping supports and heat exchanger rotational stops to comply with design requirements. FEA of purifier system is performed in cold, warm and shipping cases to verify that the purifier satisfies the design requirements.